WO2008073477A2 - Connection locator in a power aggregation system for distributed electric resources - Google Patents

Connection locator in a power aggregation system for distributed electric resources Download PDF

Info

Publication number
WO2008073477A2
WO2008073477A2 PCT/US2007/025444 US2007025444W WO2008073477A2 WO 2008073477 A2 WO2008073477 A2 WO 2008073477A2 US 2007025444 W US2007025444 W US 2007025444W WO 2008073477 A2 WO2008073477 A2 WO 2008073477A2
Authority
WO
WIPO (PCT)
Prior art keywords
location
resource
power
electric
recited
Prior art date
Application number
PCT/US2007/025444
Other languages
French (fr)
Other versions
WO2008073477A3 (en
Inventor
Seth W. Bridges
Seth B. Pollack
David L. Kaplan
Original Assignee
V2Green, Inc.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by V2Green, Inc. filed Critical V2Green, Inc.
Priority to CA002672424A priority Critical patent/CA2672424A1/en
Priority to EP07867731A priority patent/EP2099639A2/en
Priority to BRPI0719998-8A2A priority patent/BRPI0719998A2/en
Priority to MX2009006239A priority patent/MX2009006239A/en
Publication of WO2008073477A2 publication Critical patent/WO2008073477A2/en
Publication of WO2008073477A3 publication Critical patent/WO2008073477A3/en

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • H04L67/125Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks involving control of end-device applications over a network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/32Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from a charging set comprising a non-electric prime mover rotating at constant speed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L3/00Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
    • B60L3/12Recording operating variables ; Monitoring of operating variables
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/10Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
    • B60L53/14Conductive energy transfer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/57Charging stations without connection to power networks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/64Optimising energy costs, e.g. responding to electricity rates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/65Monitoring or controlling charging stations involving identification of vehicles or their battery types
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • B60L53/665Methods related to measuring, billing or payment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L55/00Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00016Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
    • H02J13/00017Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00028Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/322Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/46Interconnection of networks
    • H04L12/4604LAN interconnection over a backbone network, e.g. Internet, Frame Relay
    • H04L12/462LAN interconnection over a bridge based backbone
    • H04L12/4625Single bridge functionality, e.g. connection of two networks over a single bridge
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2270/00Problem solutions or means not otherwise provided for
    • B60L2270/30Preventing theft during charging
    • B60L2270/32Preventing theft during charging of electricity
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Definitions

  • FIG. 1 is a diagram of an exemplary power aggregation system.
  • FIG. 2 is a diagram of exemplary connections between an electric vehicle, the power grid, and the Internet.
  • FIG. 3 is a block diagram of exemplary connections between an electric resource and a flow control server of the power aggregation system.
  • Fig. 4 is a diagram of an exemplary layout of the power aggregation system.
  • FIG. 5 is a diagram of exemplary control areas in the power aggregation system.
  • Fig. 6 is a diagram of multiple flow control centers in the power aggregation system.
  • FIG. 7 is a block diagram of an exemplary flow control server.
  • FIG. 8 is block diagram of an exemplary remote intelligent power flow module.
  • FIG. 9 is a diagram of a first exemplary technique for locating a connection location of an electric resource on a power grid.
  • FIG. 10 is a diagram of a second exemplary technique for locating a connection location of an electric resource on the power grid.
  • FIG. 11 is a diagram of a third exemplary technique for locating a connection location of an electric resource on the power grid.
  • FIG. 12 is a diagram of a fourth exemplary technique for locating a connection location of an electric resource on the power grid network.
  • Fig. 13 is a flow diagram of an exemplary method of power aggregation.
  • Fig. 14 is a flow diagram of an exemplary method of communicatively controlling an electric resource for power aggregation.
  • Fig. 15 is a flow diagram of an exemplary method of determining an electric network location of an electric resource.
  • Described herein is a power aggregation system for distributed electric resources, and associated methods.
  • the exemplary system communicates over the Internet and/or some other public or private networks with numerous individual electric resources connected to a power grid (hereinafter, "grid”).
  • grid a power grid
  • the exemplary system can dynamically aggregate these electric resources to provide power services to grid operators (e.g. utilities, Independent System Operators (ISO), etc).
  • grid operators e.g. utilities, Independent System Operators (ISO), etc.
  • Power services refers to energy delivery as well as other ancillary services including demand response, regulation, spinning reserves, non-spinning reserves, energy imbalance, and similar products.
  • Aggregation refers to the ability to control power flows into and out of a set of spatially distributed electric resources with the purpose of providing a power service of larger magnitude.
  • Power grid operator refers to the entity that is responsible for maintaining the operation and stability of the power grid within or across an electric control area. The power grid operator may constitute some combination of manual/human action/intervention and automated processes controlling generation signals in response to system sensors.
  • a "control area operator” is one example of a power grid operator.
  • Control area refers to a contained portion of the electrical grid with defined input and output ports. The net flow of power into this area must equal (within some error tolerance) the sum of the power consumption within the area and power outflow from the area.
  • Power grid as used herein means a power distribution system/network that connects producers of power with consumers of power.
  • the network may include generators, transformers, interconnects, switching stations, substations, feeders, and safety equipment as part of either/both the transmission system (i.e., bulk power) or the distribution system (i.e. retail power).
  • the exemplary power aggregation system is vertically scalable for use with a neighborhood, a city, a sector, a control area, or (for example) one of the eight large-scale Interconnects in the North American Electric Reliability Council (NERC).
  • the exemplary system is horizontally scalable for use in providing power services to multiple grid areas simultaneously.
  • Grid conditions means the need for more or less power flowing in or out of a section of the electric power grid, in a response to one of a number of conditions, for example supply changes, demand changes, contingencies and failures, ramping events, etc. These grid conditions typically manifest themselves as power quality events such as under- or over-voltage events and under- or over-frequency events.
  • Power quality events typically refers to manifestations of power grid instability including voltage deviations and frequency deviations; additionally, power quality events as used herein also includes other disturbances in the quality of the power delivered by the power grid such as sub-cycle voltage spikes and harmonics.
  • Electric resource typically refers to electrical entities that can be commanded to do some or all of these three things: take power (act as load), provide power (act as power generation or source), and store energy. Examples may include battery/charger/inverter systems for electric or hybrid vehicles, repositories of used-but-serviceable electric vehicle batteries, fixed energy storage, fuel cell generators, emergency generators, controllable loads, etc.
  • Electric vehicle is used broadly herein to refer to pure electric and hybrid electric vehicles, such as plug-in hybrid electric vehicles (PHEVs), especially vehicles that have significant storage battery capacity and that connect to the power grid for recharging the battery.
  • electric vehicle means a vehicle that gets some or all of its energy for motion and other purposes from the power grid.
  • an electric vehicle has an energy storage system, which may consist of batteries, capacitors, etc., or some combination thereof.
  • An electric vehicle may or may not have the capability to provide power back to the electric grid.
  • Electric vehicle "energy storage systems" (batteries, supercapacitors, and/or other energy storage devices) are used herein as a representative example of electric resources intermittently or permanently connected to the grid that can have dynamic input and output of power. Such batteries can function as a power source or a power load.
  • a collection of aggregated electric vehicle batteries can become a statistically stable resource across numerous batteries, despite recognizable tidal connection trends (e.g., an increase in the total umber of vehicles connected to the grid at night; a downswing in the collective number of connected batteries as the morning commute begins, etc.)
  • connection trends are predictable and such batteries become a stable and reliable resource to call upon, should the grid or a part of the grid (such as a person's home in a blackout) experience a need for increased or decreased power.
  • Data collection and storage also enable the power aggregation system to predict connection behavior on a per-user basis.
  • FIG. 1 shows an exemplary power aggregation system 100.
  • a flow control center 102 is communicatively coupled with a network, such as a public/private mix that includes the Internet 104, and includes one or more servers 106 providing a centralized power aggregation service.
  • Internet Internet 104 will be used herein as representative of many different types of communicative networks and network mixtures.
  • the flow control center 102 maintains communication 108 with operators of power grid(s), and communication 110 with remote resources, i.e., communication with peripheral electric resources 112 ("end" or "terminal" nodes /devices of a power network) that are connected to the power grid 114.
  • PLCs powerline communicators
  • Ethernet-over-powerline bridges 120 are implemented at connection locations so that the "last mile" (in this case, last feet — e.g., in a residence 124) of Internet communication with remote resources is implemented over the same wire that connects each electric resource 112 to the power grid 114.
  • each physical location of each electric resource 112 may be associated with a corresponding Ethernet-over-powerline bridge 120 (hereinafter, "bridge") at or near the same location as the electric resource 112.
  • bridge 120 is typically connected to an Internet access point of a location owner, as will be described in greater detail below.
  • the communication medium from flow control center 102 to the connection location, such as residence 124, can take many forms, such as cable modem, DSL, satellite, fiber, WiMax, etc.
  • electric resources 112 may connect with the Internet by a different medium than the same power wire that connects them to the power grid 114.
  • a given electric resource 112 may have its own wireless capability to connect directly with the Internet 104 and thereby with the flow control center 102.
  • Electric resources 112 of the exemplary power aggregation system 100 may include the batteries of electric vehicles connected to the power grid 114 at residences 124, parking lots 126 etc.; batteries in a repository 128, fuel cell generators, private dams, conventional power plants, and other resources that produce electricity and/or store electricity physically or electrically.
  • each participating electric resource 112 or group of local resources has a corresponding remote intelligent power flow (IPF) module 134 (hereinafter, "remote IPF module” 134).
  • the centralized flow control center 102 administers the power aggregation system 100 by communicating with the remote IPF modules 134 distributed peripherally among the electric resources 112.
  • the remote IPF modules 134 perform several different functions, including providing the flow control center 102 with the statuses of remote resources; controlling the amount, direction, and timing of power being transferred into or out of a remote electric resource 112; provide metering of power being transferred into or out of a remote electric resource 112; providing safety measures during power transfer and changes of conditions in the power grid 114; logging activities; and providing self- contained control of power transfer and safety measures when communication with the flow control center 102 is interrupted.
  • the remote IPF modules 134 will be described in greater detail below.
  • FIG. 2 shows another view of exemplary electrical and communicative connections to an electric resource 112.
  • an electric vehicle 200 includes a battery bank 202 and an exemplary remote IPF module 134.
  • the electric vehicle 200 may connect to a conventional wall receptacle (wall outlet) 204 of a residence 124, the wall receptacle 204 representing the peripheral edge of the power grid 114 connected via a residential powerline 206.
  • the power cord 208 between the electric vehicle 200 and the wall outlet 204 can be composed of only conventional wire and insulation for conducting alternating current (AC) power to and from the electric vehicle 200.
  • a location-specific connection locality module 210 performs the function of network access point — in this case, the Internet access point.
  • a bridge 120 intervenes between the receptacle 204 and the network access point so that the power cord 208 can also carry network communications between the electric vehicle 200 and the receptacle 204.
  • connection locality module 210 With such a bridge 120 and connection locality module 210 in place in a connection location, no other special wiring or physical medium is needed to communicate with the remote IPF module 134 of the electric vehicle 200 other than a conventional power cord 208 for providing residential line current at conventional voltage. Upstream of the connection locality module 210, power and communication with the electric vehicle 200 are resolved into the powerline 206 and an Internet cable 104.
  • the power cord 208 may include safety features not found in conventional power and extension cords.
  • an electrical plug 212 of the power cord 208 may include electrical and/or mechanical safeguard components to prevent the remote IPF module 134 from electrifying or exposing the male conductors of the power cord 208 when the conductors are exposed to a human user.
  • Fig. 3 shows another implementation of the connection locality module 210 of Fig. 2, in greater detail.
  • an electric resource 112 has an associated remote IPF module 134, including a bridge 120.
  • the power cord 208 connects the electric resource 112 to the power grid 114 and also to the connection locality module 210 in order to communicate with the flow control server 106.
  • the connection locality module 210 includes another instance of a bridge 120', connected to a network access point 302, which may include such components as a router, switch, and/or modem, to establish a hardwired or wireless connection with, in this case, the Internet 104.
  • the power cord 208 between the two bridges 120 and 120' is replaced by a wireless Internet link, such as a wireless transceiver in the remote IPF module 134 and a wireless router in the connection locality module 210.
  • a wireless Internet link such as a wireless transceiver in the remote IPF module 134 and a wireless router in the connection locality module 210.
  • Fig. 4 shows an exemplary layout 400 of the power aggregation system 100.
  • the flow control center 102 can be connected to many different entities, e.g., via the Internet 104, for communicating and receiving information.
  • the exemplary layout 400 includes electric resources 112, such as plug-in electric vehicles 200, physically connected to the grid within a single control area 402.
  • the electric resources 112 become an energy resource for grid operators 404 to utilize.
  • the exemplary layout 400 also includes end users 406 classified into electric resource owners 408 and electrical connection location owners 410, who may or may not be one and the same.
  • the stakeholders in an exemplary power aggregation system 100 include the system operator at the flow control center 102, the grid operator 404, the resource owner 408, and the owner of the location 410 at which the electric resource 112 is connected to the power grid 114.
  • Electrical connection location owners 410 can include: [00039] • Rental car lots - rental car companies often have a large portion of their fleet parked in the lot. They can purchase fleets of electric vehicles 200 and, participating in a power aggregation system 100, generate revenue from idle fleet vehicles.
  • Public parking lots - parking lot owners can participate in the power aggregation system 100 to generate revenue from parked electric vehicles 200. Vehicle owners can be offered free parking, or additional incentives, in exchange for providing power services.
  • the grid operations 116 of Fig. 4 collectively include interactions with energy markets 412, the interactions of grid operators 404, and the interactions of automated grid controllers 118 that perform automatic physical control of the power grid 114.
  • the flow control center 102 may also be coupled with information sources 414 for input of weather reports, events, price feeds, etc., collectively called acquired information.
  • Other data sources 414 include the system stakeholders, public databases, and historical system data, which may be used to optimize system performance and to satisfy constraints on the exemplary power aggregation system 100.
  • an exemplary power aggregation system 100 may consist of components that:
  • [00050] • predict behavior of electric resources 112 (connectedness, location, state (such as battery State-Of-Charge) at time of connect/disconnect); [00051] • predict behavior of the power grid 114/ load; [00052] • encrypt communications for privacy and data security; [00053] • actuate charging of electric vehicles 200 to optimize some figure(s) of merit;
  • These components can be running on a single computing resource (computer, etc.), or on a distributed set of resources (either physically co-located or not).
  • Exemplary IPF systems 100 in such a layout 400 can provide many benefits: for example, lower-cost ancillary services (i.e., power services), finegrained (both temporally and spatially) control over resource scheduling, guaranteed reliability and service levels, increased service levels via intelligent resource scheduling, firming of intermittent generation sources such as wind and solar power generation.
  • ancillary services i.e., power services
  • finegrained (both temporally and spatially) control over resource scheduling i.e., guaranteed reliability and service levels
  • increased service levels via intelligent resource scheduling such as wind and solar power generation.
  • the exemplary power aggregation system 100 enables a grid operator 404 to control the aggregated electric resources 112 connected to the power grid 114.
  • An electric resource 112 can act as a power source, load, or storage, and the resource 112 may exhibit combinations of these properties.
  • Control of an electric resource 112 is the ability to actuate power consumption, generation, or energy storage from an aggregate of these electric resources 112.
  • FIG. 5 shows the role of multiple control areas 402 in the exemplary power aggregation system 100.
  • Each electric resource 112 can be connected to the power aggregation system 100 within a specific electrical control area.
  • a single instance of the flow control center 102 can administer electric resources 112 from multiple distinct control areas 501 (e.g., control areas 502, 504, and 506).
  • this functionality is achieved by logically partitioning resources within the power aggregation system 100. For example, when the control areas 402 include an arbitrary number of control areas, control area "A" 502, control area "B" 504, ... , control area "n” 506, then grid operations 116 can include corresponding control area operators 508, 510, ..., and 512.
  • control division into a control hierarchy that includes control division groupings above and below the illustrated control areas 402 allows the power aggregation system 100 to scale to power grids 114 of different magnitudes and/or to varying numbers of electric resources 112 connected with a power grid 114.
  • FIG. 6 shows an exemplary layout 600 of an exemplary power aggregation system 100 that uses multiple centralized flow control centers 102 and 102'.
  • Each flow control center 102 and 102' has its own respective end users 406 and 406'.
  • Control areas 402 to be administered by each specific instance of a flow control center 102 can be assigned dynamically.
  • a first flow control center 102 may administer control area A 502 and control area B 504, while a second flow control center 102' administers control area n 506.
  • corresponding control area operators (508, 510, and 512) are served by the same flow control center 102 that serves their respective different control areas.
  • FIG. 7 shows an exemplary server 106 of the flow control center 102.
  • the illustrated implementation in Fig. 7 is only one example configuration, for descriptive purposes. Many other arrangements of the illustrated components or even different components constituting an exemplary server 106 of the flow control center 102 are possible within the scope of the subject matter.
  • Such an exemplary server 106 and flow control center 102 can be executed in hardware, software, or combinations of hardware, software, firmware, etc.
  • the exemplary flow control server 106 includes a connection manager 702 to communicate with electric resources 112, a prediction engine 704 that may include a learning engine 706 and a statistics engine 708, a constraint optimizer 710, and a grid interaction manager 712 to receive grid control signals 714.
  • Grid control signals 714 may include generation control signals, such as automated generation control (AGC) signals.
  • AGC automated generation control
  • the flow control server 106 may further include a database / information warehouse 716, a web server 718 to present a user interface to electric resource owners 408, grid operators 404, and electrical connection location owners 410; a contract manager 720 to negotiate contract terms with energy markets 412, and an information acquisition engine 414 to track weather, relevant news events, etc., and download information from public and private databases 722 for predicting behavior of large groups of the electric resources 112, monitoring energy prices, negotiating contracts, etc.
  • a database / information warehouse 716 to present a user interface to electric resource owners 408, grid operators 404, and electrical connection location owners 410
  • a contract manager 720 to negotiate contract terms with energy markets 412
  • an information acquisition engine 414 to track weather, relevant news events, etc., and download information from public and private databases 722 for predicting behavior of large groups of the electric resources 112, monitoring energy prices, negotiating contracts, etc.
  • connection manager 702 maintains a communications channel with each electric resource 112 that is connected to the power aggregation system 100. That is, the connection manager 702 allows each electric resource 112 to log on and communicate, e.g., using Internet Protocol (IP) if the network is the Internet 104. In other words, the electric resources 112 call home. That is, in one implementation they always initiate the connection with the server106.
  • IP Internet Protocol
  • the IPF module 134 can connect to the home's router via the powerline connection.
  • the router will assign the vehicle 200 an address (DHCP), and the vehicle 200 can connect to the server 106 (no holes in the firewall needed from this direction).
  • DHCP vehicle address
  • the IPF module 134 knows to call home again and connect to the next available server resource.
  • the grid interaction manager 712 receives and interprets signals from the interface of the automated grid controller 118 of a grid operator 404. In one implementation, the grid interaction manager 712 also generates signals to send to automated grid controllers 118. The scope of the signals to be sent depends on agreements or contracts between grid operators 404 and the exemplary power aggregation system 100. In one scenario the grid interaction manager 712 sends information about the availability of aggregate electric resources 112 to receive power from the grid 114 or supply power to the grid 114. In another variation, a contract may allow the grid interaction manager 712 to send control signals to the automated grid controller 118 — to control the grid 114, subject to the built-in constraints of the automated grid controller 118 and subject to the scope of control allowed by the contract.
  • the database 716 can store all of the data relevant to the power aggregation system 100 including electric resource logs, e.g., for electric vehicles 200, electrical connection information, per-vehicle energy metering data, resource owner preferences, account information, etc.
  • the web server 718 provides a user interface to the system stakeholders, as described above. Such a user interface serves primarily as a mechanism for conveying information to the users, but in some cases, the user interface serves to acquire data, such as preferences, from the users. In one implementation, the web server 718 can also initiate contact with participating electric resource owners 408 to advertise offers for exchanging electrical power.
  • the bidding/contract manager 720 interacts with the grid operators 404 and their associated energy markets 412 to determine system availability, pricing, service levels, etc.
  • the information acquisition engine 414 communicates with public and private databases 722, as mentioned above, to gather data that is relevant to the operation of the power aggregation system 100.
  • the prediction engine 704 may use data from the data warehouse 716 to make predictions about electric resource behavior, such as when electric resources 112 will connect and disconnect, global electric resource availability, electrical system load, real-time energy prices, etc.
  • the predictions enable the power aggregation system 100 to utilize more fully the electric resources 112 connected to the power grid 114.
  • the learning engine 706 may track, record, and process actual electric resource behavior, e.g., by learning behavior of a sample or cross-section of a large population of electric resources 112.
  • the statistics engine 708 may apply various probabilistic techniques to the resource behavior to note trends and make predictions.
  • the prediction engine 704 performs predictions via collaborative filtering.
  • the prediction engine 704 can also perform per-user predictions of one or more parameters, including, for example, connect-time, connect duration, state-of-charge at connect time, and connection location.
  • the prediction engine 704 may draw upon information, such as historical data, connect time (day of week, week of month, month of year, holidays, etc.), state-of-charge at connect, connection location, etc.
  • a time series prediction can be computed via a recurrent neural network, a dynamic Bayesian network, or other directed graphical model.
  • the prediction engine 704 can predict the time of the next connection, the state-of- charge at connection time, the location of the connection (and may assign it a probability/likelihood). Once the resource 112 has connected, the time-of- connection, state-of-charge at-connection, and connection location become further inputs to refinements of the predictions of the connection duration. These predictions help to guide predictions of total system availability as well as to determine a more accurate cost function for resource allocation. [00073] Building a parameterized prediction model for each unique user is not always scalable in time or space.
  • the prediction engine 704 builds a reduced set of models where each model in the reduced set is used to predict the behavior of many users.
  • the system 100 can identify features of each user, such as number of unique connections/disconnections per day, typical connection time(s), average connection duration, average state-of-charge at connection time, etc., and can create clusters of users in either a full feature space or in some reduced feature space that is computed via a dimensionality reduction algorithm such as Principal Components Analysis, Random Projection, etc.
  • the cluster assignment procedure is varied to optimize the system 100 for speed (less clusters), for accuracy (more clusters), or some combination of the two.
  • This exemplary clustering technique has multiple benefits. First, it enables a reduced set of models, and therefore reduced model parameters, which reduces the computation time for making predictions. It also reduces the storage space of the model parameters. Second, by identifying traits (or features) of new users to the system 100, these new users can be assigned to an existing cluster of users with similar traits, and the cluster model, built from the extensive data of the existing users, can make more accurate predictions about the new user more quickly because it is leveraging the historical performance of similar users. Of course, over time, individual users may change their behaviors and may be reassigned to new clusters that fit their behavior better.
  • the constraint optimizer 710 combines information from the prediction engine 704, the data warehouse 716, and the contract manager 720 to generate resource control signals that will satisfy the system constraints.
  • the constraint optimizer 710 can signal an electric vehicle 200 to charge its battery bank 202 at a certain charging rate and later to discharge the battery bank 202 for uploading power to the power grid 114 at a certain upload rate: the power transfer rates and the timing schedules of the power transfers optimized to fit the tracked individual connect and disconnect behavior of the particular electric vehicle 200 and also optimized to fit a daily power supply and demand "breathing cycle" of the power grid 114.
  • the constraint optimizer 710 plays a key role in converting grid control signals 714 or information sources 414 into vehicle control signals, mediated by the connection manager 702. Mapping grid control signals 714 from a grid operator 404 or information sources 414 into control signals that are sent to each unique electrical resource 112 in the system 100 is an example of a specific constraint optimization problem.
  • Each resource 112 has associated constraints, either hard or soft. Examples of resource constraints may include: price sensitivity of the owner, vehicle state-of-charge (e.g., if the vehicle 200 is fully charged, it cannot participate in loading the grid 114), predicted amount of time until the resource 112 disconnects from the system 100, owner sensitivity to revenue versus state-of-charge, electrical limits of the resource 114, manual charging overrides by resource owners 408, etc.
  • the constraints on a particular resource 112 can be used to assign a cost for activating each of the resource's particular actions. For example, a resource whose storage system 202 has little energy stored in it will have a low cost associated with the charging operation, but a very high cost for the generation operation.
  • a fully charged resource 112 that is predicted to be available for ten hours will have a lower cost generation operation than a fully charged resource 112 that is predicted to be disconnected within the next 15 minutes, representing the negative consequence of delivering a less-than-full resource to its owner.
  • the following is one example scenario of converting one generating signal 714 that comprises a system operating level (e.g. -10 megawatts to +10 megawatts, where + represents load, - represents generation) to a vehicle control signal. It is worth noting that because the system 100 can meter the actual power flows in each resource 112, the actual system operating level is known at all times. [00079] In this example, assume the initial system operating level is 0 megawatts, no resources are active (taking or delivering power from the grid), and the negotiated aggregation service contract level for the next hour is +/- 5 megawatts. [00080] In this implementation, the exemplary power aggregation system 100 maintains three lists of available resources 112.
  • a system operating level e.g. -10 megawatts to +10 megawatts, where + represents load, - represents generation
  • the first list contains resources 112 that can be activated for charging (load) in priority order.
  • Each of the resources 112 in these lists (e.g., all resources 112 can have a position in both lists) have an associated cost.
  • the priority order of the lists is directly related to the cost (i.e., the lists are sorted from lowest cost to highest cost). Assigning cost values to each resource 112 is important because it enables the comparison of two operations that achieve similar results with respect to system operation. For example, adding one unit of charging (load, taking power from the grid) to the system is equivalent to removing one unit of generation.
  • the third list of resources 112 contains resources with hard constraints. For example, resources whose owner's 408 have overridden the system 100 to force charging will be placed on the third list of static resources.
  • the grid-operator-requested operating level changes to +2 megawatts.
  • the system activates charging the first 'n' resources from the list, where 'n' is the number of resources whose additive load is predicted to equal 2 megawatts. After the resources are activated, the result of the activations are monitored to determine the actual result of the action. If more than 2 megawatts of load is active, the system will disable charging in reverse priority order to maintain system operation within the error tolerance specified by the contract. [00082] From time “1" until time "2,” the requested operating level remains constant at 2 megawatts. However, the behavior of some of the electrical resources may not be static.
  • the system moves sequentially through the priority lists, comparing the cost of enabling generation versus disabling charging, and activating the lowest cost resource at each time step. Once the operating level reaches -1 megawatts, the system 100 continues to monitor the actual operating level, looking for deviations that would require the activation of an additional resource 112 to maintain the operating level within the error tolerance specified by the contract.
  • an exemplary costing mechanism is fed information on the real-time grid generation mix to determine the marginal consequences of charging or generation (vehicle 200 to grid 114) on a "carbon footprint," the impact on fossil fuel resources and the environment in general.
  • the exemplary system 100 also enables optimizing for any cost metric, or a weighted combination of several.
  • the system 100 can optimize figures of merit that may include, for example, a combination of maximizing economic value and minimizing environmental impact, etc.
  • the system 100 also uses cost as a temporal variable. For example, if the system 100 schedules a discharged pack to charge during an upcoming time window, the system 100 can predict its look-ahead cost profile as it charges, allowing the system 100 to further optimize, adaptively. That is, in some circumstances the system 100 knows that it will have a high-capacity generation resource by a certain future time.
  • Multiple components of the flow control server 106 constitute a scheduling system that has multiple functions and components:
  • the optimizations can take the form of resource control plans that optimize a desired metric.
  • the scheduling function can enable a number of useful energy services, including:
  • An exemplary power aggregation system 100 aggregates and controls the load presented by many charging/uploading electric vehicles 200 to provide power services (ancillary energy services) such as regulation and spinning reserves.
  • power services ancillary energy services
  • more complex interleavings of individual electric resources by the power aggregation system 100 are possible.
  • the power aggregation system 100 includes power-factor correction circuitry placed in electric vehicles 200 with the exemplary remote IPF module 134, thus enabling such a service.
  • the electric vehicles 200 can have capacitors (or inductors) that can be dynamically connected to the grid, independent of whether the electric vehicle 200 is charging, delivering power, or doing nothing. This service can then be sold to utilities for distribution level dynamic VAR support.
  • the power aggregation system 100 can both sense the need for VAR support in a distributed manner and use the distributed remote IPF modules 134 to take actions that provide VAR support without grid operator 404 intervention.
  • Fig. 8 shows the remote IPF module 134 of Figs. 1 and 2 in greater detail.
  • the illustrated remote IPF module 134 is only one example configuration, for descriptive purposes. Many other arrangements of the illustrated components or even different components constituting an exemplary remote IPF module 134 are possible within the scope of the subject matter.
  • Such an exemplary remote IPF module 134 has some hardware components and some components that can be executed in hardware, software, or combinations of hardware, software, firmware, etc.
  • the illustrated example of a remote IPF module 134 is represented by an implementation suited for an electric vehicle 200.
  • some vehicle systems 800 are included as part of the exemplary remote IPF module 134 for the sake of description.
  • the remote IPF module 134 may exclude some or all of the vehicles systems 800 from being counted as components of the remote IPF module 134.
  • the depicted vehicle systems 800 include a vehicle computer and data interface 802, an energy storage system, such as a battery bank 202, and an inverter / charger 804.
  • the remote IPF module 134 also includes a communicative power flow controller 806.
  • the communicative power flow controller 806 in turn includes some components that interface with AC power from the grid 114, such as a powerline communicator, for example an Ethernet-over-powerline bridge 120, and a current or current/voltage (power) sensor 808, such as a current sensing transformer.
  • the communicative power flow controller 806 also includes Ethernet and information processing components, such as a processor 810 or microcontroller and an associated Ethernet media access control (MAC) address 812; volatile random access memory 814, nonvolatile memory 816 or data storage, an interface such as an RS-232 interface 818 or a CANbus interface 820; an Ethernet physical layer interface 822, which enables wiring and signaling according to Ethernet standards for the physical layer through means of network access at the MAC / Data Link Layer and a common addressing format.
  • the Ethernet physical layer interface 822 provides electrical, mechanical, and procedural interface to the transmission medium — i.e., in one implementation, using the Ethernet-over-powerline bridge 120. In a variation, wireless or other communication channels with the Internet 104 are used in place of the Ethernet-over-powerline bridge 120.
  • the communicative power flow controller 806 also includes a bidirectional power flow meter 824 that tracks power transfer to and from each electric resource 112, in this case the battery bank 202 of an electric vehicle 200.
  • the communicative power flow controller 806 operates either within, or connected to an electric vehicle 200 or other electric resource 112 to enable the aggregation of electric resources 112 introduced above (e.g., via a wired or wireless communication interface).
  • These above-listed components may vary among different implementations of the communicative power flow controller 806, but implementations typically include:
  • Implementations of the communicative power flow controller 806 can enable functionality including:
  • the communicative power flow controller 806 includes a central processor 810, interfaces 818 and 820 for communication within the electric vehicle
  • a powerline communicator such as an Ethernet-over-powerline bridge 120 for communication external to the electric vehicle 200
  • a power flow meter 824 for measuring energy flow to and from the electric vehicle 200 via a connected AC powerline 208.
  • the remote IPF module 134 initiates a connection to the flow control server 106, registers itself, and waits for signals from the flow control server 106 that direct the remote IPF module 134 to adjust the flow of power into or out of the electric vehicle 200. These signals are communicated to the vehicle computer 802 via the data interface, which may be any suitable interface including the RS-232 interface 818 or the CANbus interface 820.
  • the vehicle computer 802 following the signals received from the flow control server 106, controls the inverter / charger 804 to charge the vehicle's battery bank 202 or to discharge the battery bank 202 in upload to the grid 114.
  • the remote IPF module 134 transmits information regarding energy flows to the flow control server 106. If, when the electric vehicle 200 is connected to the grid 114, there is no communications path to the flow control server 106 (i.e., the location is not equipped properly, or there is a network failure), the electric vehicle 200 can follow a preprogrammed or learned behavior of off-line operation, e.g., stored as a set of instructions in the nonvolatile memory 816. In such a case, energy transactions can also be cached in nonvolatile memory 816 for later transmission to the flow control server 106.
  • the remote IPF module 134 listens passively, logging select vehicle operation data for later analysis and consumption.
  • the remote IPF module 134 can transmit this data to the flow control server 106 when a communications channel becomes available.
  • Power is the rate of energy consumption per interval of time. Power indicates the quantity of energy transferred during a certain period of time, thus the units of power are quantities of energy per unit of time.
  • the exemplary power flow meter 824 measures power for a given electric resource 112 across a bi-directional flow — e.g., power from grid 114 to electric vehicle 200 or from electric vehicle 200 to the grid 114.
  • the remote IPF module 134 can locally cache readings from the power flow meter 824 to ensure accurate transactions with the central flow control server 106, even if the connection to the server is down temporarily, or if the server itself is unavailable.
  • the exemplary power flow meter 824, in conjunction with the other components of the remote IPF module 134 enables system-wide features in the exemplary power aggregation system 100 that include:
  • the exemplary power aggregation system 100 also includes various techniques for determining the electrical network location of a mobile electric resource 112, such as a plug-in electric vehicle 200.
  • Electric vehicles 200 can connect to the grid 114 in numerous locations and accurate control and transaction of energy exchange can be enabled by specific knowledge of the charging location.
  • Some of the exemplary techniques for determining electric vehicle charging locations include:
  • Fig. 9 shows an exemplary technique for resolving the physical location on the grid 114 of an electric resource 112 that is connected to the exemplary power aggregation system 100.
  • the remote IPF module 134 obtains the Media Access Control (MAC) address 902 of the locally installed network modem or router (Internet access point) 302. The remote IPF module 134 then transmits this unique MAC identifier to the flow control server 106, which uses the identifier to resolve the location of the electric vehicle 200.
  • MAC Media Access Control
  • the remote IPF module 134 can also sometimes use the MAC addresses or other unique identifiers of other physically installed nearby equipment that can communicate with the remote IPF module 134, including a "smart" utility meter 904, a cable TV box 906, an RFID-based unit 908, or an exemplary ID unit 910 that is able to communicate with the remote IPF module 134.
  • the ID unit 910 is described in more detail in Fig. 10.
  • MAC addresses 902 do not always give information about the physical location of the associated piece of hardware, but in one implementation the flow control server 106 includes a tracking database 912 that relates MAC addresses or other identifiers with an associated physical location of the hardware. In this manner, a remote IPF module 134 and the flow control server 106 can find a mobile electric resource 112 wherever it connects to the power grid 114.
  • Fig. 10 shows another exemplary technique for determining a physical location of a mobile electric resource 112 on the power grid 114.
  • An exemplary ID unit 910 can be plugged into the grid 114 at or near a charging location. The operation of the ID unit 910 is as follows. A newly-connected electric resource 112 searches for locally connected resources by broadcasting a ping or message in the wireless reception area. In one implementation, the ID unit 910 responds 1002 to the ping and conveys a unique identifier 1004 of the ID unit 910 back to the electric resource 112.
  • the remote IPF module 134 of the electric resource 112 then transmits the unique identifier 1004 to the flow control server 106, which determines the location of the ID unit 910 and by proxy, the exact or the approximate network location of the electric resource 112, depending on the size of the catchment area of the ID unit 910.
  • the newly-connected electric resource 112 searches for locally connected resources by broadcasting a ping or message that includes the unique identifier 1006 of the electric resource 112.
  • the ID unit 910 does not need to trust or reuse the wireless connection, and does not respond back to the remote IPF module 134 of the mobile electric resource 112, but responds 1008 directly to the flow control server 106 with a message that contains its own unique identifier 1004 and the unique identifier 1006 of the electric resource 112 that was received in the ping message.
  • the central flow control server 106 then associates the unique identifier 1006 of the mobile electric resource 112 with a "connected" status and uses the other unique identifier 1004 of the ID unit 910 to determine or approximate the physical location of the electric resource 112. The physical location does not have to be approximate, if a particular ID unit 910 is associated with only one exact network location.
  • the remote IPF module 134 learns that the ping is successful when it hears back from the flow control center 106 with confirmation.
  • Such an exemplary ID unit 910 is particularly useful in situations in which the communications path between the electric resource 112 and the flow control server 106 is via a wireless connection that does not itself enable exact determination of network location.
  • FIG. 11 shows another exemplary method 1100 and system 1102 for determining the location of a mobile electric resource 112 on the power grid 114.
  • the electric resource 112 and the flow control server 106 conduct communications via a wireless signaling scheme, it is still desirable to determine the physical connection location during periods of connectedness with the grid 114.
  • Wireless networks comprise many cells or towers that each transmit unique identifiers. Additionally, the strength of the connection between a tower and mobile clients connecting to the tower is a function of the client's proximity to the tower.
  • the remote IPF module 134 can acquire the unique identifiers of the available towers and relate these to the signal strength of each connection, as shown in database 1104.
  • the remote IPF module 134 of the electric resource 112 transmits this information to the flow control server 106, where the information is combined with survey data, such as database 1106 so that a position inference engine 1108 can triangulate or otherwise infer the physical location of the connected electric vehicle 200.
  • the IPF module 134 can use the signal strength readings to resolve the resource location directly, in which case the IPF module 134 transmits the location information instead of the signal strength information.
  • the exemplary method 1100 includes acquiring (1110) the signal strength information; communicating (1112) the acquired signal strength information to the flow control server 106; and inferring (1114) the physical location using stored tower location information and the acquired signals from the electric resource 112.
  • Fig. 12 shows a method 1200 and system 1202 for using signals from a global positioning satellite (GPS) system to determine a physical location of a mobile electric resource 112 on the power grid 114.
  • GPS global positioning satellite
  • Using GPS enables a remote IPF module 134 to resolve its physical location on the power network in a non-exact manner.
  • This noisy location information from GPS is transmitted to the flow control server 106, which uses it with a survey information database 1204 to infer the location of the electric resource 112.
  • the exemplary method 1200 includes acquiring (1206) the noisy position data; communicating (1208) the acquired noisy position data to the flow control server 106; and inferring (1210) the location using the stored survey information and the acquired data.
  • Fig. 13 shows an exemplary method 1300 of power aggregation.
  • the exemplary method 1300 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary power aggregation system 100.
  • communication is established with each of multiple electric resources connected to a power grid.
  • a central flow control service can manage numerous intermittent connections with mobile electric vehicles, each of which may connect to the power grid at various locations.
  • An in-vehicle remote agent connects each vehicle to the Internet when the vehicle connects to the power grid.
  • the electric resources are individually signaled to provide power to or take power from the power grid.
  • Fig. 14 is a flow diagram of an exemplary method of communicatively controlling an electric resource for power aggregation.
  • the exemplary method 1400 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary intelligent power flow
  • a control signal based in part upon the information is received from the service.
  • the resource is controlled, e.g., to provide power to the power grid or to take power from the grid, i.e., for storage.
  • bidirectional power flow of the electric device is measured, and used as part of the information associated with the electric resource that is communicated to the service at block 1404.
  • Fig. 15 is a flow diagram of an exemplary method of determining an electric network location of an electric resource.
  • the exemplary method 1500 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary power aggregation system 100.
  • the physical location information is determined.
  • the physical location information may be derived from such sources as GPS signals or from the relative strength of cell tower signals as an indicator of their location. Or, the physical location information may derived by receiving a unique identifier associated with a nearby device, and finding the location associated with that unique identifier.
  • an electric network location e.g., of an electric resource or its connection with the power grid, is determined from the physical location information.

Abstract

Systems and methods are described for a power aggregation system. In one implementation, a service establishes individual Internet connections to numerous electric resources intermittently connected to the power grid, such as electric vehicles. The Internet connection may be made over the same wire that connects the resource to the power grid. The service optimizes power flows to suit the needs of each resource and each resource owner, while aggregating flows across numerous resources to suit the needs of the power grid. The service can bring vast numbers of electric vehicle batteries online as a new, dynamically aggregated power resource for the power grid. Electric vehicle owners can participate in an electricity trading economy regardless of where they plug into the power grid.

Description

CONNECTION LOCATOR IN A POWER AGGREGATION SYSTEM FOR DISTRIBUTED ELECTRIC RESOURCES
RELATED APPLICATIONS
[0001] This application claims priority to U.S. Provisional Patent Application No. 60/869,439 to Bridges et al., entitled, "A Distributed Energy Storage Management System," filed December 11 , 2006 and incorporated herein by reference; U.S. Provisional Patent Application No. 60/915,347 to Bridges et al., entitled, "Plug-ln- Vehicle Management System," filed May 1 , 2007 and incorporated herein by reference; and U.S. Patent Application No. 11/836,747 to Bridges et al., entitled, "Connection Locator in a Power Aggregation System for Distributed Electric Resources," filed August 9, 2007, and incorporated herein by reference.
BACKGROUND
[0002] Transportation systems, with their high dependence on fossil fuels, are especially carbon-intensive. That is, physical units of work performed in the transportation system typically discharge a significantly larger amount of CO2 into the atmosphere than the same units of work performed electrically. [0003] The electric power grid contains limited inherent facility for storing electrical energy. Electricity must be generated constantly to meet uncertain demand, which often results in over-generation (and hence wasted energy) and sometimes results in under-generation (and hence power failures). [0004] Distributed electric resources, en masse can, in principle, provide a significant resource for addressing the above problems. However, current power services infrastructure lacks provisioning and flexibility that are required for aggregating a large number of small-scale resources (e.g., electric vehicle batteries) to meet medium- and large-scale needs of power services. A single vehicle battery is insignificant when compared with the needs of the power grid. What is needed is a way to coordinate vast numbers of electric vehicle batteries, as electric vehicles become more popular and prevalent.
[0005] Low-level electrical and communication interfaces to enable charging and discharging of electric vehicles with respect to the grid are described in U.S. Patent No. 5,642,270 to Green et al., entitled, "Battery powered electric vehicle and electrical supply system," incorporated herein by reference. The Green reference describes a bi-directional charging and communication system for grid-connected electric vehicles, but does not address the information processing requirements of dealing with large, mobile populations of electric vehicles, the complexities of billing (or compensating) vehicle owners, nor the complexities of assembling mobile pools of electric vehicles into aggregate power resources robust enough to support firm power service contracts with grid operators.
BRIEF DESCRIPTION OF THE DRAWINGS
[0006] Fig. 1 is a diagram of an exemplary power aggregation system.
[0007] Fig. 2 is a diagram of exemplary connections between an electric vehicle, the power grid, and the Internet.
[0008] Fig. 3 is a block diagram of exemplary connections between an electric resource and a flow control server of the power aggregation system.
[0009] Fig. 4 is a diagram of an exemplary layout of the power aggregation system.
[00010] Fig. 5 is a diagram of exemplary control areas in the power aggregation system.
[00011] Fig. 6 is a diagram of multiple flow control centers in the power aggregation system.
[00012] Fig. 7 is a block diagram of an exemplary flow control server.
[00013] Fig. 8 is block diagram of an exemplary remote intelligent power flow module.
[00014] Fig. 9 is a diagram of a first exemplary technique for locating a connection location of an electric resource on a power grid.
[00015] Fig. 10 is a diagram of a second exemplary technique for locating a connection location of an electric resource on the power grid.
[00016] Fig. 11 is a diagram of a third exemplary technique for locating a connection location of an electric resource on the power grid.
[00017] Fig. 12 is a diagram of a fourth exemplary technique for locating a connection location of an electric resource on the power grid network.
[00018] Fig. 13 is a flow diagram of an exemplary method of power aggregation. [00019] Fig. 14 is a flow diagram of an exemplary method of communicatively controlling an electric resource for power aggregation.
[00020] Fig. 15 is a flow diagram of an exemplary method of determining an electric network location of an electric resource.
DETAILED DESCRIPTION
Overview
[00021] Described herein is a power aggregation system for distributed electric resources, and associated methods. In one implementation, the exemplary system communicates over the Internet and/or some other public or private networks with numerous individual electric resources connected to a power grid (hereinafter, "grid"). By communicating, the exemplary system can dynamically aggregate these electric resources to provide power services to grid operators (e.g. utilities, Independent System Operators (ISO), etc). "Power services" as used herein, refers to energy delivery as well as other ancillary services including demand response, regulation, spinning reserves, non-spinning reserves, energy imbalance, and similar products. "Aggregation" as used herein refers to the ability to control power flows into and out of a set of spatially distributed electric resources with the purpose of providing a power service of larger magnitude. "Power grid operator" as used herein, refers to the entity that is responsible for maintaining the operation and stability of the power grid within or across an electric control area. The power grid operator may constitute some combination of manual/human action/intervention and automated processes controlling generation signals in response to system sensors. A "control area operator" is one example of a power grid operator. "Control area" as used herein, refers to a contained portion of the electrical grid with defined input and output ports. The net flow of power into this area must equal (within some error tolerance) the sum of the power consumption within the area and power outflow from the area.
[00022] "Power grid" as used herein means a power distribution system/network that connects producers of power with consumers of power. The network may include generators, transformers, interconnects, switching stations, substations, feeders, and safety equipment as part of either/both the transmission system (i.e., bulk power) or the distribution system (i.e. retail power). The exemplary power aggregation system is vertically scalable for use with a neighborhood, a city, a sector, a control area, or (for example) one of the eight large-scale Interconnects in the North American Electric Reliability Council (NERC). Moreover, the exemplary system is horizontally scalable for use in providing power services to multiple grid areas simultaneously.
[00023] "Grid conditions" as used herein, means the need for more or less power flowing in or out of a section of the electric power grid, in a response to one of a number of conditions, for example supply changes, demand changes, contingencies and failures, ramping events, etc. These grid conditions typically manifest themselves as power quality events such as under- or over-voltage events and under- or over-frequency events.
[00024] "Power quality events" as used herein typically refers to manifestations of power grid instability including voltage deviations and frequency deviations; additionally, power quality events as used herein also includes other disturbances in the quality of the power delivered by the power grid such as sub-cycle voltage spikes and harmonics.
[00025] "Electric resource" as used herein typically refers to electrical entities that can be commanded to do some or all of these three things: take power (act as load), provide power (act as power generation or source), and store energy. Examples may include battery/charger/inverter systems for electric or hybrid vehicles, repositories of used-but-serviceable electric vehicle batteries, fixed energy storage, fuel cell generators, emergency generators, controllable loads, etc. [00026] "Electric vehicle" is used broadly herein to refer to pure electric and hybrid electric vehicles, such as plug-in hybrid electric vehicles (PHEVs), especially vehicles that have significant storage battery capacity and that connect to the power grid for recharging the battery. More specifically, electric vehicle means a vehicle that gets some or all of its energy for motion and other purposes from the power grid. Moreover, an electric vehicle has an energy storage system, which may consist of batteries, capacitors, etc., or some combination thereof. An electric vehicle may or may not have the capability to provide power back to the electric grid. [00027] Electric vehicle "energy storage systems" (batteries, supercapacitors, and/or other energy storage devices) are used herein as a representative example of electric resources intermittently or permanently connected to the grid that can have dynamic input and output of power. Such batteries can function as a power source or a power load. A collection of aggregated electric vehicle batteries can become a statistically stable resource across numerous batteries, despite recognizable tidal connection trends (e.g., an increase in the total umber of vehicles connected to the grid at night; a downswing in the collective number of connected batteries as the morning commute begins, etc.) Across vast numbers of electric vehicle batteries, connection trends are predictable and such batteries become a stable and reliable resource to call upon, should the grid or a part of the grid (such as a person's home in a blackout) experience a need for increased or decreased power. Data collection and storage also enable the power aggregation system to predict connection behavior on a per-user basis.
Exemplary System
[00028] Fig. 1 shows an exemplary power aggregation system 100. A flow control center 102 is communicatively coupled with a network, such as a public/private mix that includes the Internet 104, and includes one or more servers 106 providing a centralized power aggregation service. "Internet" 104 will be used herein as representative of many different types of communicative networks and network mixtures. Via a network, such as the Internet 104, the flow control center 102 maintains communication 108 with operators of power grid(s), and communication 110 with remote resources, i.e., communication with peripheral electric resources 112 ("end" or "terminal" nodes /devices of a power network) that are connected to the power grid 114. In one implementation, powerline communicators (PLCs), such as those that include or consist of Ethernet-over-powerline bridges 120 are implemented at connection locations so that the "last mile" (in this case, last feet — e.g., in a residence 124) of Internet communication with remote resources is implemented over the same wire that connects each electric resource 112 to the power grid 114. Thus, each physical location of each electric resource 112 may be associated with a corresponding Ethernet-over-powerline bridge 120 (hereinafter, "bridge") at or near the same location as the electric resource 112. Each bridge 120 is typically connected to an Internet access point of a location owner, as will be described in greater detail below. The communication medium from flow control center 102 to the connection location, such as residence 124, can take many forms, such as cable modem, DSL, satellite, fiber, WiMax, etc. In a variation, electric resources 112 may connect with the Internet by a different medium than the same power wire that connects them to the power grid 114. For example, a given electric resource 112 may have its own wireless capability to connect directly with the Internet 104 and thereby with the flow control center 102.
[00029] Electric resources 112 of the exemplary power aggregation system 100 may include the batteries of electric vehicles connected to the power grid 114 at residences 124, parking lots 126 etc.; batteries in a repository 128, fuel cell generators, private dams, conventional power plants, and other resources that produce electricity and/or store electricity physically or electrically. [00030] In one implementation, each participating electric resource 112 or group of local resources has a corresponding remote intelligent power flow (IPF) module 134 (hereinafter, "remote IPF module" 134). The centralized flow control center 102 administers the power aggregation system 100 by communicating with the remote IPF modules 134 distributed peripherally among the electric resources 112. The remote IPF modules 134 perform several different functions, including providing the flow control center 102 with the statuses of remote resources; controlling the amount, direction, and timing of power being transferred into or out of a remote electric resource 112; provide metering of power being transferred into or out of a remote electric resource 112; providing safety measures during power transfer and changes of conditions in the power grid 114; logging activities; and providing self- contained control of power transfer and safety measures when communication with the flow control center 102 is interrupted. The remote IPF modules 134 will be described in greater detail below.
[00031] Fig. 2 shows another view of exemplary electrical and communicative connections to an electric resource 112. In this example, an electric vehicle 200 includes a battery bank 202 and an exemplary remote IPF module 134. The electric vehicle 200 may connect to a conventional wall receptacle (wall outlet) 204 of a residence 124, the wall receptacle 204 representing the peripheral edge of the power grid 114 connected via a residential powerline 206.
[00032] In one implementation, the power cord 208 between the electric vehicle 200 and the wall outlet 204 can be composed of only conventional wire and insulation for conducting alternating current (AC) power to and from the electric vehicle 200. In Fig. 2, a location-specific connection locality module 210 performs the function of network access point — in this case, the Internet access point. A bridge 120 intervenes between the receptacle 204 and the network access point so that the power cord 208 can also carry network communications between the electric vehicle 200 and the receptacle 204. With such a bridge 120 and connection locality module 210 in place in a connection location, no other special wiring or physical medium is needed to communicate with the remote IPF module 134 of the electric vehicle 200 other than a conventional power cord 208 for providing residential line current at conventional voltage. Upstream of the connection locality module 210, power and communication with the electric vehicle 200 are resolved into the powerline 206 and an Internet cable 104.
[00033] Alternatively, the power cord 208 may include safety features not found in conventional power and extension cords. For example, an electrical plug 212 of the power cord 208 may include electrical and/or mechanical safeguard components to prevent the remote IPF module 134 from electrifying or exposing the male conductors of the power cord 208 when the conductors are exposed to a human user.
[00034] Fig. 3 shows another implementation of the connection locality module 210 of Fig. 2, in greater detail. In Fig. 3, an electric resource 112 has an associated remote IPF module 134, including a bridge 120. The power cord 208 connects the electric resource 112 to the power grid 114 and also to the connection locality module 210 in order to communicate with the flow control server 106. [00035] The connection locality module 210 includes another instance of a bridge 120', connected to a network access point 302, which may include such components as a router, switch, and/or modem, to establish a hardwired or wireless connection with, in this case, the Internet 104. In one implementation, the power cord 208 between the two bridges 120 and 120' is replaced by a wireless Internet link, such as a wireless transceiver in the remote IPF module 134 and a wireless router in the connection locality module 210. Exemplary System Layouts
[00036] Fig. 4 shows an exemplary layout 400 of the power aggregation system 100. The flow control center 102 can be connected to many different entities, e.g., via the Internet 104, for communicating and receiving information. The exemplary layout 400 includes electric resources 112, such as plug-in electric vehicles 200, physically connected to the grid within a single control area 402. The electric resources 112 become an energy resource for grid operators 404 to utilize. [00037] The exemplary layout 400 also includes end users 406 classified into electric resource owners 408 and electrical connection location owners 410, who may or may not be one and the same. In fact, the stakeholders in an exemplary power aggregation system 100 include the system operator at the flow control center 102, the grid operator 404, the resource owner 408, and the owner of the location 410 at which the electric resource 112 is connected to the power grid 114. [00038] Electrical connection location owners 410 can include: [00039] • Rental car lots - rental car companies often have a large portion of their fleet parked in the lot. They can purchase fleets of electric vehicles 200 and, participating in a power aggregation system 100, generate revenue from idle fleet vehicles.
[00040] • Public parking lots - parking lot owners can participate in the power aggregation system 100 to generate revenue from parked electric vehicles 200. Vehicle owners can be offered free parking, or additional incentives, in exchange for providing power services.
[00041] • Workplace parking - employers can participate in a power aggregation system 100 to generate revenue from parked employee electric vehicles 200. Employees can be offered incentives in exchange for providing power services. [00042] • Residences - a home garage can merely be equipped with a connection locality module 210 to enable the homeowner to participate in the power aggregation system 100 and generate revenue from a parked car. Also, the vehicle battery 202 and associated power electronics within the vehicle can provide local power backup power during times of peak load or power outages. [00043] • Residential neighborhoods - neighborhoods can participate in a power aggregation system 100 and be equipped with power-delivery devices (deployed, for example, by homeowner cooperative groups) that generate revenue from parked electric vehicles 200.
[00044] • The grid operations 116 of Fig. 4 collectively include interactions with energy markets 412, the interactions of grid operators 404, and the interactions of automated grid controllers 118 that perform automatic physical control of the power grid 114.
[00045] The flow control center 102 may also be coupled with information sources 414 for input of weather reports, events, price feeds, etc., collectively called acquired information. Other data sources 414 include the system stakeholders, public databases, and historical system data, which may be used to optimize system performance and to satisfy constraints on the exemplary power aggregation system 100.
[00046] Thus, an exemplary power aggregation system 100 may consist of components that:
[00047] • communicate with the electric resources 112 to gather data and actuate charging/discharging of the electric resources 112; [00048] • gather real-time energy prices; [00049] • gather real-time resource statistics;
[00050] • predict behavior of electric resources 112 (connectedness, location, state (such as battery State-Of-Charge) at time of connect/disconnect); [00051] • predict behavior of the power grid 114/ load; [00052] • encrypt communications for privacy and data security; [00053] • actuate charging of electric vehicles 200 to optimize some figure(s) of merit;
[00054] • offer guidelines or guarantees about load availability for various points in the future, etc.
[00055] These components can be running on a single computing resource (computer, etc.), or on a distributed set of resources (either physically co-located or not).
[00056] Exemplary IPF systems 100 in such a layout 400 can provide many benefits: for example, lower-cost ancillary services (i.e., power services), finegrained (both temporally and spatially) control over resource scheduling, guaranteed reliability and service levels, increased service levels via intelligent resource scheduling, firming of intermittent generation sources such as wind and solar power generation.
[00057] The exemplary power aggregation system 100 enables a grid operator 404 to control the aggregated electric resources 112 connected to the power grid 114. An electric resource 112 can act as a power source, load, or storage, and the resource 112 may exhibit combinations of these properties. Control of an electric resource 112 is the ability to actuate power consumption, generation, or energy storage from an aggregate of these electric resources 112.
[00058] Fig. 5 shows the role of multiple control areas 402 in the exemplary power aggregation system 100. Each electric resource 112 can be connected to the power aggregation system 100 within a specific electrical control area. A single instance of the flow control center 102 can administer electric resources 112 from multiple distinct control areas 501 (e.g., control areas 502, 504, and 506). In one implementation, this functionality is achieved by logically partitioning resources within the power aggregation system 100. For example, when the control areas 402 include an arbitrary number of control areas, control area "A" 502, control area "B" 504, ... , control area "n" 506, then grid operations 116 can include corresponding control area operators 508, 510, ..., and 512. Further division into a control hierarchy that includes control division groupings above and below the illustrated control areas 402 allows the power aggregation system 100 to scale to power grids 114 of different magnitudes and/or to varying numbers of electric resources 112 connected with a power grid 114.
[00059] Fig. 6 shows an exemplary layout 600 of an exemplary power aggregation system 100 that uses multiple centralized flow control centers 102 and 102'. Each flow control center 102 and 102' has its own respective end users 406 and 406'. Control areas 402 to be administered by each specific instance of a flow control center 102 can be assigned dynamically. For example, a first flow control center 102 may administer control area A 502 and control area B 504, while a second flow control center 102' administers control area n 506. Likewise, corresponding control area operators (508, 510, and 512) are served by the same flow control center 102 that serves their respective different control areas. Exemplary Flow Control Server
[00060] Fig. 7 shows an exemplary server 106 of the flow control center 102. The illustrated implementation in Fig. 7 is only one example configuration, for descriptive purposes. Many other arrangements of the illustrated components or even different components constituting an exemplary server 106 of the flow control center 102 are possible within the scope of the subject matter. Such an exemplary server 106 and flow control center 102 can be executed in hardware, software, or combinations of hardware, software, firmware, etc.
[00061] The exemplary flow control server 106 includes a connection manager 702 to communicate with electric resources 112, a prediction engine 704 that may include a learning engine 706 and a statistics engine 708, a constraint optimizer 710, and a grid interaction manager 712 to receive grid control signals 714. Grid control signals 714 may include generation control signals, such as automated generation control (AGC) signals. The flow control server 106 may further include a database / information warehouse 716, a web server 718 to present a user interface to electric resource owners 408, grid operators 404, and electrical connection location owners 410; a contract manager 720 to negotiate contract terms with energy markets 412, and an information acquisition engine 414 to track weather, relevant news events, etc., and download information from public and private databases 722 for predicting behavior of large groups of the electric resources 112, monitoring energy prices, negotiating contracts, etc.
Operation of an Exemplary Flow Control Server
[00062] The connection manager 702 maintains a communications channel with each electric resource 112 that is connected to the power aggregation system 100. That is, the connection manager 702 allows each electric resource 112 to log on and communicate, e.g., using Internet Protocol (IP) if the network is the Internet 104. In other words, the electric resources 112 call home. That is, in one implementation they always initiate the connection with the server106. This facet enables the exemplary IPF modules 134 to work around problems with firewalls, IP addressing, reliability, etc.
[00063] For example, when an electric resource 112, such as an electric vehicle 200 plugs in at home 124, the IPF module 134 can connect to the home's router via the powerline connection. The router will assign the vehicle 200 an address (DHCP), and the vehicle 200 can connect to the server 106 (no holes in the firewall needed from this direction).
[00064] If the connection is terminated for any reason (including the server instance dies), then the IPF module 134 knows to call home again and connect to the next available server resource.
[00065] The grid interaction manager 712 receives and interprets signals from the interface of the automated grid controller 118 of a grid operator 404. In one implementation, the grid interaction manager 712 also generates signals to send to automated grid controllers 118. The scope of the signals to be sent depends on agreements or contracts between grid operators 404 and the exemplary power aggregation system 100. In one scenario the grid interaction manager 712 sends information about the availability of aggregate electric resources 112 to receive power from the grid 114 or supply power to the grid 114. In another variation, a contract may allow the grid interaction manager 712 to send control signals to the automated grid controller 118 — to control the grid 114, subject to the built-in constraints of the automated grid controller 118 and subject to the scope of control allowed by the contract.
[00066] The database 716 can store all of the data relevant to the power aggregation system 100 including electric resource logs, e.g., for electric vehicles 200, electrical connection information, per-vehicle energy metering data, resource owner preferences, account information, etc.
[00067] The web server 718 provides a user interface to the system stakeholders, as described above. Such a user interface serves primarily as a mechanism for conveying information to the users, but in some cases, the user interface serves to acquire data, such as preferences, from the users. In one implementation, the web server 718 can also initiate contact with participating electric resource owners 408 to advertise offers for exchanging electrical power.
[00068] The bidding/contract manager 720 interacts with the grid operators 404 and their associated energy markets 412 to determine system availability, pricing, service levels, etc. [00069] The information acquisition engine 414 communicates with public and private databases 722, as mentioned above, to gather data that is relevant to the operation of the power aggregation system 100.
[00070] The prediction engine 704 may use data from the data warehouse 716 to make predictions about electric resource behavior, such as when electric resources 112 will connect and disconnect, global electric resource availability, electrical system load, real-time energy prices, etc. The predictions enable the power aggregation system 100 to utilize more fully the electric resources 112 connected to the power grid 114. The learning engine 706 may track, record, and process actual electric resource behavior, e.g., by learning behavior of a sample or cross-section of a large population of electric resources 112. The statistics engine 708 may apply various probabilistic techniques to the resource behavior to note trends and make predictions.
[00071] In one implementation, the prediction engine 704 performs predictions via collaborative filtering. The prediction engine 704 can also perform per-user predictions of one or more parameters, including, for example, connect-time, connect duration, state-of-charge at connect time, and connection location. In order to perform per-user prediction, the prediction engine 704 may draw upon information, such as historical data, connect time (day of week, week of month, month of year, holidays, etc.), state-of-charge at connect, connection location, etc. In one implementation, a time series prediction can be computed via a recurrent neural network, a dynamic Bayesian network, or other directed graphical model. [00072] In one scenario, for one user disconnected from the grid 114, the prediction engine 704 can predict the time of the next connection, the state-of- charge at connection time, the location of the connection (and may assign it a probability/likelihood). Once the resource 112 has connected, the time-of- connection, state-of-charge at-connection, and connection location become further inputs to refinements of the predictions of the connection duration. These predictions help to guide predictions of total system availability as well as to determine a more accurate cost function for resource allocation. [00073] Building a parameterized prediction model for each unique user is not always scalable in time or space. Therefore, in one implementation, rather than use one model for each user in the system 100, the prediction engine 704 builds a reduced set of models where each model in the reduced set is used to predict the behavior of many users. To decide how to group similar users for model creation and assignment, the system 100 can identify features of each user, such as number of unique connections/disconnections per day, typical connection time(s), average connection duration, average state-of-charge at connection time, etc., and can create clusters of users in either a full feature space or in some reduced feature space that is computed via a dimensionality reduction algorithm such as Principal Components Analysis, Random Projection, etc. Once the prediction engine 704 has assigned users to a cluster, the collective data from all of the users in that cluster is used to create a predictive model that will be used for the predictions of each user in the cluster. In one implementation, the cluster assignment procedure is varied to optimize the system 100 for speed (less clusters), for accuracy (more clusters), or some combination of the two.
[00074] This exemplary clustering technique has multiple benefits. First, it enables a reduced set of models, and therefore reduced model parameters, which reduces the computation time for making predictions. It also reduces the storage space of the model parameters. Second, by identifying traits (or features) of new users to the system 100, these new users can be assigned to an existing cluster of users with similar traits, and the cluster model, built from the extensive data of the existing users, can make more accurate predictions about the new user more quickly because it is leveraging the historical performance of similar users. Of course, over time, individual users may change their behaviors and may be reassigned to new clusters that fit their behavior better.
[00075] The constraint optimizer 710 combines information from the prediction engine 704, the data warehouse 716, and the contract manager 720 to generate resource control signals that will satisfy the system constraints. For example, the constraint optimizer 710 can signal an electric vehicle 200 to charge its battery bank 202 at a certain charging rate and later to discharge the battery bank 202 for uploading power to the power grid 114 at a certain upload rate: the power transfer rates and the timing schedules of the power transfers optimized to fit the tracked individual connect and disconnect behavior of the particular electric vehicle 200 and also optimized to fit a daily power supply and demand "breathing cycle" of the power grid 114. [00076] In one implementation, the constraint optimizer 710 plays a key role in converting grid control signals 714 or information sources 414 into vehicle control signals, mediated by the connection manager 702. Mapping grid control signals 714 from a grid operator 404 or information sources 414 into control signals that are sent to each unique electrical resource 112 in the system 100 is an example of a specific constraint optimization problem.
[00077] Each resource 112 has associated constraints, either hard or soft. Examples of resource constraints may include: price sensitivity of the owner, vehicle state-of-charge (e.g., if the vehicle 200 is fully charged, it cannot participate in loading the grid 114), predicted amount of time until the resource 112 disconnects from the system 100, owner sensitivity to revenue versus state-of-charge, electrical limits of the resource 114, manual charging overrides by resource owners 408, etc. The constraints on a particular resource 112 can be used to assign a cost for activating each of the resource's particular actions. For example, a resource whose storage system 202 has little energy stored in it will have a low cost associated with the charging operation, but a very high cost for the generation operation. A fully charged resource 112 that is predicted to be available for ten hours will have a lower cost generation operation than a fully charged resource 112 that is predicted to be disconnected within the next 15 minutes, representing the negative consequence of delivering a less-than-full resource to its owner.
[00078] The following is one example scenario of converting one generating signal 714 that comprises a system operating level (e.g. -10 megawatts to +10 megawatts, where + represents load, - represents generation) to a vehicle control signal. It is worth noting that because the system 100 can meter the actual power flows in each resource 112, the actual system operating level is known at all times. [00079] In this example, assume the initial system operating level is 0 megawatts, no resources are active (taking or delivering power from the grid), and the negotiated aggregation service contract level for the next hour is +/- 5 megawatts. [00080] In this implementation, the exemplary power aggregation system 100 maintains three lists of available resources 112. The first list contains resources 112 that can be activated for charging (load) in priority order. There is a second list of the resources 112 ordered by priority for discharging (generation). Each of the resources 112 in these lists (e.g., all resources 112 can have a position in both lists) have an associated cost. The priority order of the lists is directly related to the cost (i.e., the lists are sorted from lowest cost to highest cost). Assigning cost values to each resource 112 is important because it enables the comparison of two operations that achieve similar results with respect to system operation. For example, adding one unit of charging (load, taking power from the grid) to the system is equivalent to removing one unit of generation. To perform any operation that increases or decreases the system output, there may be multiple action choices and in one implementation the system 100 selects the lowest cost operation. The third list of resources 112 contains resources with hard constraints. For example, resources whose owner's 408 have overridden the system 100 to force charging will be placed on the third list of static resources.
[00081] At time "1 ," the grid-operator-requested operating level changes to +2 megawatts. The system activates charging the first 'n' resources from the list, where 'n' is the number of resources whose additive load is predicted to equal 2 megawatts. After the resources are activated, the result of the activations are monitored to determine the actual result of the action. If more than 2 megawatts of load is active, the system will disable charging in reverse priority order to maintain system operation within the error tolerance specified by the contract. [00082] From time "1" until time "2," the requested operating level remains constant at 2 megawatts. However, the behavior of some of the electrical resources may not be static. For example, some vehicles 200 that are part of the 2 megawatts system operation may become full (state-of-charge = 100%) or may disconnect from the system 100. Other vehicles 200 may connect to the system 100 and demand immediate charging. All of these actions will cause a change in the operating level of the power aggregation system 100. Therefore, the system 100 continuously monitors the system operating level and activates or deactivates resources 112 to maintain the operating level within the error tolerance specified by the contract. [00083] At time "2," the grid-operator-requested operating level decreases to -1 megawatts. The system consults the lists of available resources and chooses the lowest cost set of resources to achieve a system operating level of -1 megawatts. Specifically, the system moves sequentially through the priority lists, comparing the cost of enabling generation versus disabling charging, and activating the lowest cost resource at each time step. Once the operating level reaches -1 megawatts, the system 100 continues to monitor the actual operating level, looking for deviations that would require the activation of an additional resource 112 to maintain the operating level within the error tolerance specified by the contract.
[00084] In one implementation, an exemplary costing mechanism is fed information on the real-time grid generation mix to determine the marginal consequences of charging or generation (vehicle 200 to grid 114) on a "carbon footprint," the impact on fossil fuel resources and the environment in general. The exemplary system 100 also enables optimizing for any cost metric, or a weighted combination of several. The system 100 can optimize figures of merit that may include, for example, a combination of maximizing economic value and minimizing environmental impact, etc.
[00085] In one implementation, the system 100 also uses cost as a temporal variable. For example, if the system 100 schedules a discharged pack to charge during an upcoming time window, the system 100 can predict its look-ahead cost profile as it charges, allowing the system 100 to further optimize, adaptively. That is, in some circumstances the system 100 knows that it will have a high-capacity generation resource by a certain future time.
[00086] Multiple components of the flow control server 106 constitute a scheduling system that has multiple functions and components:
[00087] • data collection (gathers real-time data and stores historical data);
[00088] • projections via the prediction engine 704, which inputs real-time data, historical data, etc.; and outputs resource availability forecasts;
[00089] • optimizations built on resource availability forecasts, constraints, such as command signals from grid operators 404, user preferences, weather conditions, etc.
The optimizations can take the form of resource control plans that optimize a desired metric.
[00090] The scheduling function can enable a number of useful energy services, including:
[00091] • ancillary services, such as rapid response services and fast regulation;
[00092] • energy to compensate for sudden, foreseeable, or unexpected grid imbalances;
[00093] • response to routine and unstable demands; [00094] • firming of renewable energy sources (e.g. complementing wind- generated power).
[00095] An exemplary power aggregation system 100 aggregates and controls the load presented by many charging/uploading electric vehicles 200 to provide power services (ancillary energy services) such as regulation and spinning reserves. Thus, it is possible to meet call time requirements of grid operators 404 by summing multiple electric resources 112. For example, twelve operating loads of 5kW each can be disabled to provide 6OkW of spinning reserves for one hour. However, if each load can be disabled for at most 30 minutes and the minimum call time is two hours, the loads can be disabled in series (three at a time) to provide 15kW of reserves for two hours. Of course, more complex interleavings of individual electric resources by the power aggregation system 100 are possible. [00096] For a utility (or electrical power distribution entity) to maximize distribution efficiency, the utility needs to minimize reactive power flows. Typically, there are a number of methods used to minimize reactive power flows including switching inductor or capacitor banks into the distribution system to modify the power factor in different parts of the system. To manage and control this dynamic Volt-Amperes Reactive (VAR) support effectively, it must be done in a location-aware manner. In one implementation, the power aggregation system 100 includes power-factor correction circuitry placed in electric vehicles 200 with the exemplary remote IPF module 134, thus enabling such a service. Specifically, the electric vehicles 200 can have capacitors (or inductors) that can be dynamically connected to the grid, independent of whether the electric vehicle 200 is charging, delivering power, or doing nothing. This service can then be sold to utilities for distribution level dynamic VAR support. The power aggregation system 100 can both sense the need for VAR support in a distributed manner and use the distributed remote IPF modules 134 to take actions that provide VAR support without grid operator 404 intervention.
Exemplary Remote IPF Module
[00097] Fig. 8 shows the remote IPF module 134 of Figs. 1 and 2 in greater detail. The illustrated remote IPF module 134 is only one example configuration, for descriptive purposes. Many other arrangements of the illustrated components or even different components constituting an exemplary remote IPF module 134 are possible within the scope of the subject matter. Such an exemplary remote IPF module 134 has some hardware components and some components that can be executed in hardware, software, or combinations of hardware, software, firmware, etc.
[00098] The illustrated example of a remote IPF module 134 is represented by an implementation suited for an electric vehicle 200. Thus, some vehicle systems 800 are included as part of the exemplary remote IPF module 134 for the sake of description. However, in other implementations, the remote IPF module 134 may exclude some or all of the vehicles systems 800 from being counted as components of the remote IPF module 134.
[00099] The depicted vehicle systems 800 include a vehicle computer and data interface 802, an energy storage system, such as a battery bank 202, and an inverter / charger 804. Besides vehicle systems 800, the remote IPF module 134 also includes a communicative power flow controller 806. The communicative power flow controller 806 in turn includes some components that interface with AC power from the grid 114, such as a powerline communicator, for example an Ethernet-over-powerline bridge 120, and a current or current/voltage (power) sensor 808, such as a current sensing transformer.
[000100] The communicative power flow controller 806 also includes Ethernet and information processing components, such as a processor 810 or microcontroller and an associated Ethernet media access control (MAC) address 812; volatile random access memory 814, nonvolatile memory 816 or data storage, an interface such as an RS-232 interface 818 or a CANbus interface 820; an Ethernet physical layer interface 822, which enables wiring and signaling according to Ethernet standards for the physical layer through means of network access at the MAC / Data Link Layer and a common addressing format. The Ethernet physical layer interface 822 provides electrical, mechanical, and procedural interface to the transmission medium — i.e., in one implementation, using the Ethernet-over-powerline bridge 120. In a variation, wireless or other communication channels with the Internet 104 are used in place of the Ethernet-over-powerline bridge 120.
[000101] The communicative power flow controller 806 also includes a bidirectional power flow meter 824 that tracks power transfer to and from each electric resource 112, in this case the battery bank 202 of an electric vehicle 200. [000102] The communicative power flow controller 806 operates either within, or connected to an electric vehicle 200 or other electric resource 112 to enable the aggregation of electric resources 112 introduced above (e.g., via a wired or wireless communication interface). These above-listed components may vary among different implementations of the communicative power flow controller 806, but implementations typically include:
[000103] • an intra-vehicle communications mechanism that enables communication with other vehicle components;
[000104] • a mechanism to communicate with the flow control center 102;
[000105] • a processing element;
[000106] • a data storage element;
[000107] • a power meter; and
[000108] • optionally, a user interface.
[000109] Implementations of the communicative power flow controller 806 can enable functionality including:
[000110] • executing pre-programmed or learned behaviors when the electric resource 112 is offline (not connected to Internet 104, or service is unavailable);
[000111] • storing locally-cached behavior profiles for "roaming" connectivity (what to do when charging on a foreign system or in disconnected operation, i.e., when there is no network connectivity);
[000112] • allowing the user to override current system behavior; and
[000113] • metering power-flow information and caching meter data during offline operation for later transaction.
[000114] Thus, the communicative power flow controller 806 includes a central processor 810, interfaces 818 and 820 for communication within the electric vehicle
200, a powerline communicator, such as an Ethernet-over-powerline bridge 120 for communication external to the electric vehicle 200, and a power flow meter 824 for measuring energy flow to and from the electric vehicle 200 via a connected AC powerline 208.
Operation of the Exemplary Remote IPF Module
[000115] Continuing with electric vehicles 200 as representative of electric resources 112, during periods when such an electric vehicle 200 is parked and connected to the grid 114, the remote IPF module 134 initiates a connection to the flow control server 106, registers itself, and waits for signals from the flow control server 106 that direct the remote IPF module 134 to adjust the flow of power into or out of the electric vehicle 200. These signals are communicated to the vehicle computer 802 via the data interface, which may be any suitable interface including the RS-232 interface 818 or the CANbus interface 820. The vehicle computer 802, following the signals received from the flow control server 106, controls the inverter / charger 804 to charge the vehicle's battery bank 202 or to discharge the battery bank 202 in upload to the grid 114.
[000116] Periodically, the remote IPF module 134 transmits information regarding energy flows to the flow control server 106. If, when the electric vehicle 200 is connected to the grid 114, there is no communications path to the flow control server 106 (i.e., the location is not equipped properly, or there is a network failure), the electric vehicle 200 can follow a preprogrammed or learned behavior of off-line operation, e.g., stored as a set of instructions in the nonvolatile memory 816. In such a case, energy transactions can also be cached in nonvolatile memory 816 for later transmission to the flow control server 106.
[000117] During periods when the electric vehicle 200 is in operation as transportation, the remote IPF module 134 listens passively, logging select vehicle operation data for later analysis and consumption. The remote IPF module 134 can transmit this data to the flow control server 106 when a communications channel becomes available.
Exemplary Power Flow Meter
[000118] Power is the rate of energy consumption per interval of time. Power indicates the quantity of energy transferred during a certain period of time, thus the units of power are quantities of energy per unit of time. The exemplary power flow meter 824 measures power for a given electric resource 112 across a bi-directional flow — e.g., power from grid 114 to electric vehicle 200 or from electric vehicle 200 to the grid 114. In one implementation, the remote IPF module 134 can locally cache readings from the power flow meter 824 to ensure accurate transactions with the central flow control server 106, even if the connection to the server is down temporarily, or if the server itself is unavailable. [000119] The exemplary power flow meter 824, in conjunction with the other components of the remote IPF module 134 enables system-wide features in the exemplary power aggregation system 100 that include:
[000120] • tracking energy usage on an electric resource-specific basis;
[000121] • power-quality monitoring (checking if voltage, frequency, etc. deviate from their nominal operating points, and if so, notifying grid operators, and potentially modifying resource power flows to help correct the problem);
[000122] • vehicle-specific billing and transactions for energy usage;
[000123] • mobile billing (support for accurate billing when the electric resource owner 408 is not the electrical connection location owner 410 (i.e., not the meter account owner). Data from the power flow meter 824 can be captured at the electric vehicle 200 for billing;
[000124] • integration with a smart meter at the charging location (bi-directional information exchange); and
[000125] • tamper resistance (e.g., when the power flow meter 824 is protected within an electric resource 112 such as an electric vehicle 200).
Mobile Resource Locator
[000126] The exemplary power aggregation system 100 also includes various techniques for determining the electrical network location of a mobile electric resource 112, such as a plug-in electric vehicle 200. Electric vehicles 200 can connect to the grid 114 in numerous locations and accurate control and transaction of energy exchange can be enabled by specific knowledge of the charging location. [000127] Some of the exemplary techniques for determining electric vehicle charging locations include:
[000128] • querying a unique identifier for the location (via wired, wireless, etc.), which can be:
[000129] - the unique ID of the network hardware at the charging site; [000130] - the unique ID of the locally installed smart meter, by communicating with the meter;
[000131] - a unique ID installed specifically for this purpose at a site; and [000132] • using GPS or other signal sources (cell, WiMAX, etc.) to establish a "soft" (estimated geographic) location, which is then refined based on user preferences and historical data (e.g., vehicles tend to be plugged-in at the owner's residence 124, not a neighbor's residence).
[000133] Fig. 9 shows an exemplary technique for resolving the physical location on the grid 114 of an electric resource 112 that is connected to the exemplary power aggregation system 100. In one implementation, the remote IPF module 134 obtains the Media Access Control (MAC) address 902 of the locally installed network modem or router (Internet access point) 302. The remote IPF module 134 then transmits this unique MAC identifier to the flow control server 106, which uses the identifier to resolve the location of the electric vehicle 200. [000134] To discern its physical location, the remote IPF module 134 can also sometimes use the MAC addresses or other unique identifiers of other physically installed nearby equipment that can communicate with the remote IPF module 134, including a "smart" utility meter 904, a cable TV box 906, an RFID-based unit 908, or an exemplary ID unit 910 that is able to communicate with the remote IPF module 134. The ID unit 910 is described in more detail in Fig. 10. MAC addresses 902 do not always give information about the physical location of the associated piece of hardware, but in one implementation the flow control server 106 includes a tracking database 912 that relates MAC addresses or other identifiers with an associated physical location of the hardware. In this manner, a remote IPF module 134 and the flow control server 106 can find a mobile electric resource 112 wherever it connects to the power grid 114.
[000135] Fig. 10 shows another exemplary technique for determining a physical location of a mobile electric resource 112 on the power grid 114. An exemplary ID unit 910 can be plugged into the grid 114 at or near a charging location. The operation of the ID unit 910 is as follows. A newly-connected electric resource 112 searches for locally connected resources by broadcasting a ping or message in the wireless reception area. In one implementation, the ID unit 910 responds 1002 to the ping and conveys a unique identifier 1004 of the ID unit 910 back to the electric resource 112. The remote IPF module 134 of the electric resource 112 then transmits the unique identifier 1004 to the flow control server 106, which determines the location of the ID unit 910 and by proxy, the exact or the approximate network location of the electric resource 112, depending on the size of the catchment area of the ID unit 910. [000136] In another implementation, the newly-connected electric resource 112 searches for locally connected resources by broadcasting a ping or message that includes the unique identifier 1006 of the electric resource 112. In this implementation, the ID unit 910 does not need to trust or reuse the wireless connection, and does not respond back to the remote IPF module 134 of the mobile electric resource 112, but responds 1008 directly to the flow control server 106 with a message that contains its own unique identifier 1004 and the unique identifier 1006 of the electric resource 112 that was received in the ping message. The central flow control server 106 then associates the unique identifier 1006 of the mobile electric resource 112 with a "connected" status and uses the other unique identifier 1004 of the ID unit 910 to determine or approximate the physical location of the electric resource 112. The physical location does not have to be approximate, if a particular ID unit 910 is associated with only one exact network location. The remote IPF module 134 learns that the ping is successful when it hears back from the flow control center 106 with confirmation.
[000137] Such an exemplary ID unit 910 is particularly useful in situations in which the communications path between the electric resource 112 and the flow control server 106 is via a wireless connection that does not itself enable exact determination of network location.
[000138] Fig. 11 shows another exemplary method 1100 and system 1102 for determining the location of a mobile electric resource 112 on the power grid 114. In a scenario in which the electric resource 112 and the flow control server 106 conduct communications via a wireless signaling scheme, it is still desirable to determine the physical connection location during periods of connectedness with the grid 114.
[000139] Wireless networks (e.g., GSM, 802.11 , WiMax) comprise many cells or towers that each transmit unique identifiers. Additionally, the strength of the connection between a tower and mobile clients connecting to the tower is a function of the client's proximity to the tower. When an electric vehicle 200 is connected to the grid 114, the remote IPF module 134 can acquire the unique identifiers of the available towers and relate these to the signal strength of each connection, as shown in database 1104. The remote IPF module 134 of the electric resource 112 transmits this information to the flow control server 106, where the information is combined with survey data, such as database 1106 so that a position inference engine 1108 can triangulate or otherwise infer the physical location of the connected electric vehicle 200. In another enablement, the IPF module 134 can use the signal strength readings to resolve the resource location directly, in which case the IPF module 134 transmits the location information instead of the signal strength information.
[000140] Thus, the exemplary method 1100 includes acquiring (1110) the signal strength information; communicating (1112) the acquired signal strength information to the flow control server 106; and inferring (1114) the physical location using stored tower location information and the acquired signals from the electric resource 112. [000141] Fig. 12 shows a method 1200 and system 1202 for using signals from a global positioning satellite (GPS) system to determine a physical location of a mobile electric resource 112 on the power grid 114. Using GPS enables a remote IPF module 134 to resolve its physical location on the power network in a non-exact manner. This noisy location information from GPS is transmitted to the flow control server 106, which uses it with a survey information database 1204 to infer the location of the electric resource 112.
[000142] The exemplary method 1200 includes acquiring (1206) the noisy position data; communicating (1208) the acquired noisy position data to the flow control server 106; and inferring (1210) the location using the stored survey information and the acquired data.
Exemplary Methods
[000143] Fig. 13 shows an exemplary method 1300 of power aggregation. In the flow diagram, the operations are summarized in individual blocks. The exemplary method 1300 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary power aggregation system 100.
[000144] At block 1302, communication is established with each of multiple electric resources connected to a power grid. For example, a central flow control service can manage numerous intermittent connections with mobile electric vehicles, each of which may connect to the power grid at various locations. An in-vehicle remote agent connects each vehicle to the Internet when the vehicle connects to the power grid.
[000145] At block 1304, the electric resources are individually signaled to provide power to or take power from the power grid.
[000146] Fig. 14 is a flow diagram of an exemplary method of communicatively controlling an electric resource for power aggregation. In the flow diagram, the operations are summarized in individual blocks. The exemplary method 1400 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary intelligent power flow
(IPF) module 134.
[000147] At block 1402, communication is established between an electric resource and a service for aggregating power.
[000148] At block 1404, information associated with the electric resource is communicated to the service.
[000149] At block 1406, a control signal based in part upon the information is received from the service.
[000150] At block 1408, the resource is controlled, e.g., to provide power to the power grid or to take power from the grid, i.e., for storage.
[000151] At block 1410, bidirectional power flow of the electric device is measured, and used as part of the information associated with the electric resource that is communicated to the service at block 1404.
[000152] Fig. 15 is a flow diagram of an exemplary method of determining an electric network location of an electric resource. In the flow diagram, the operations are summarized in individual blocks. The exemplary method 1500 may be performed by hardware, software, or combinations of hardware, software, firmware, etc., for example, by components of the exemplary power aggregation system 100.
[000153] At block 1502, physical location information is determined. The physical location information may be derived from such sources as GPS signals or from the relative strength of cell tower signals as an indicator of their location. Or, the physical location information may derived by receiving a unique identifier associated with a nearby device, and finding the location associated with that unique identifier. [000154] At block 1504, an electric network location, e.g., of an electric resource or its connection with the power grid, is determined from the physical location information.
Conclusion
[000155] Although exemplary systems and methods have been described in language specific to structural features and/or methodological acts, it is to be understood that the subject matter defined in the appended claims is not necessarily limited to the specific features or acts described. Rather, the specific features and acts are disclosed as exemplary forms of implementing the claimed methods, devices, systems, etc.

Claims

1. A method, comprising: obtaining physical location information; and determining an electrical network location from the physical location information.
2. The method as recited in claim 1 , wherein obtaining physical location information comprises receiving a unique identifier of a device and associating the unique identifier with a location of the device.
3. The method as recited in claim 2, wherein determining the electrical network location includes associating the electrical network location with the location of the device.
4. The method as recited in claim 1 , wherein obtaining physical location information includes receiving a unique identifier associated with a device in a physical location in order to determine an electrical network location of an electric resource connected to the electrical network.
5. The method as recited in claim 4, wherein the electric resource is an electric vehicle.
6. The method as recited in claim 4, further comprising sending the unique identifier to a service, wherein the service matches an electrical network location with the unique identifier.
7. The method as recited in claim 6, further comprising using the determined electrical network location for accurate control of aggregating power of multiple electric resources.
8. The method as recited in claim 6, wherein the service uses the determined electrical network location for a transaction associated with using or providing energy.
9. The method as recited in claim 2, wherein the device is selected from the group of devices consisting of a smart meter, a modem, a router, a network switch, a cable television set-top box, a TV remote, a garage door opener, an alarm system, an automotive satellite radio, a radio frequency identifier (RFID)-based unit, a cell phone tower, a cell phone, and a location identification beacon placed in the location with an associated location unique identifier.
10. The method as recited in claim 2, wherein the unique identifier comprises a media access control (MAC) address.
11. The method as recited in claim 10, wherein a service maps the MAC address to a location on the electrical network.
12. The method as recited in claim 2, wherein the unique identifier comprises a vehicle identification number (VIN).
13. The method as recited in claim 12, wherein a service maps the VIN to a location on the electrical network.
14. The method as recited in claim 6, wherein the device sends the unique identifier back to a newly connected electric resource and the electric resource sends the unique identifier to the service.
15. The method as recited in claim 6, wherein the device sends the unique identifier and an identity of a newly connected electric resource to the service and the service determines the location of the newly connected electric resource.
16. The method as recited in claim 4, wherein the electric resource obtains the unique identifier via a wireless transmission or via a powerline carrier.
17. A method, comprising: acquiring a unique identifier and a signal strength from at least one wireless transceiver in proximity to an electric resource; and approximating a location of the electric resource by relating the signal strength to a distance between the electric resource and the corresponding wireless transceiver.
18. The method as recited in claim 17, wherein the wireless transceivers comprise base stations of a GSM/UMTS wireless network, CDMA/CDMA2000 wireless network, a 802.16ΛΛ/iMax wireless network, or an 802.11/WiFi wireless network.
19. The method as recited in claim 17, wherein the approximate location comprises an electricity account, an address, or a power grid control area.
20. The method as recited in claim 17, wherein the approximating uses one or more of: past history of resource connection location, resource owner information such as home or work location, or querying the resource owner to confirm the resource location.
21. A method, comprising: acquiring global positioning satellite (GPS) signals at an electric resource; and inferring an approximate location of the electric resource on an electrical network by matching a GPS location with a map of the electrical network.
22. The method as recited in claim 21 , wherein the approximate location comprises an electricity account, an address, or a power grid control area.
23. The method as recited in claim 21 , wherein the inference uses one or more of past history of resource connection location, resource owner information such as home or work location, or querying the resource owner to confirm the resource location.
PCT/US2007/025444 2006-12-11 2007-12-11 Connection locator in a power aggregation system for distributed electric resources WO2008073477A2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CA002672424A CA2672424A1 (en) 2006-12-11 2007-12-11 Connection locator in a power aggregation system for distributed electric resources
EP07867731A EP2099639A2 (en) 2006-12-11 2007-12-11 Connection locator in a power aggregation system for distributed electric resources
BRPI0719998-8A2A BRPI0719998A2 (en) 2006-12-11 2007-12-11 CONNECTION LOCATOR IN A POWER AGGREGATION SYSTEM FOR DISTRIBUTED ELECTRICAL RESOURCES
MX2009006239A MX2009006239A (en) 2006-12-11 2007-12-11 Connection locator in a power aggregation system for distributed electric resources.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US86943906P 2006-12-11 2006-12-11
US60/869,439 2006-12-11

Publications (2)

Publication Number Publication Date
WO2008073477A2 true WO2008073477A2 (en) 2008-06-19
WO2008073477A3 WO2008073477A3 (en) 2008-08-07

Family

ID=39512053

Family Applications (7)

Application Number Title Priority Date Filing Date
PCT/US2007/025433 WO2008073470A2 (en) 2006-12-11 2007-12-11 Electric resource module in a power aggregation system for distributed electric resources
PCT/US2007/025439 WO2008073474A2 (en) 2006-12-11 2007-12-11 User interface and user control in a power aggregation system for distributed electric resources
PCT/US2007/025393 WO2008073453A1 (en) 2006-12-11 2007-12-11 Power aggregation system for distributed electric resources
PCT/US2007/025442 WO2008143653A2 (en) 2006-12-11 2007-12-11 Transaction management in a power aggregation system for distributed electric resources
PCT/US2007/025443 WO2008073476A2 (en) 2006-12-11 2007-12-11 Scheduling and control in a power aggregation system for distributed electric resources
PCT/US2007/025444 WO2008073477A2 (en) 2006-12-11 2007-12-11 Connection locator in a power aggregation system for distributed electric resources
PCT/US2007/025436 WO2008073472A2 (en) 2006-12-11 2007-12-11 Electric resource power meter in a power aggregation system for distributed electric resources

Family Applications Before (5)

Application Number Title Priority Date Filing Date
PCT/US2007/025433 WO2008073470A2 (en) 2006-12-11 2007-12-11 Electric resource module in a power aggregation system for distributed electric resources
PCT/US2007/025439 WO2008073474A2 (en) 2006-12-11 2007-12-11 User interface and user control in a power aggregation system for distributed electric resources
PCT/US2007/025393 WO2008073453A1 (en) 2006-12-11 2007-12-11 Power aggregation system for distributed electric resources
PCT/US2007/025442 WO2008143653A2 (en) 2006-12-11 2007-12-11 Transaction management in a power aggregation system for distributed electric resources
PCT/US2007/025443 WO2008073476A2 (en) 2006-12-11 2007-12-11 Scheduling and control in a power aggregation system for distributed electric resources

Family Applications After (1)

Application Number Title Priority Date Filing Date
PCT/US2007/025436 WO2008073472A2 (en) 2006-12-11 2007-12-11 Electric resource power meter in a power aggregation system for distributed electric resources

Country Status (9)

Country Link
EP (4) EP2097289A2 (en)
JP (1) JP2010512727A (en)
KR (5) KR20100014304A (en)
CN (1) CN101678774A (en)
BR (5) BRPI0720002A2 (en)
CA (4) CA2672508A1 (en)
IL (2) IL199293A0 (en)
MX (5) MX2009006237A (en)
WO (7) WO2008073470A2 (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008044527A1 (en) * 2008-09-16 2010-03-25 EnBW Energie Baden-Württemberg AG Mobile electricity meter for location-independent electricity purchase and / or for location-independent power supply of a mobile storage and consumption unit
US8035341B2 (en) 2010-07-12 2011-10-11 Better Place GmbH Staged deployment for electrical charge spots
US8118147B2 (en) 2009-09-11 2012-02-21 Better Place GmbH Cable dispensing system
US8164300B2 (en) 2008-09-19 2012-04-24 Better Place GmbH Battery exchange station
US8246376B2 (en) 2009-09-14 2012-08-21 Better Place GmbH Electrical connector with flexible blade shaped handle
US8454377B2 (en) 2008-09-19 2013-06-04 Better Place GmbH System for electrically connecting batteries to electric vehicles
WO2014014792A1 (en) 2012-07-14 2014-01-23 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US8996418B2 (en) 2012-10-24 2015-03-31 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10310534B2 (en) 2012-07-31 2019-06-04 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10861112B2 (en) 2012-07-31 2020-12-08 Causam Energy, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
US11004160B2 (en) 2015-09-23 2021-05-11 Causam Enterprises, Inc. Systems and methods for advanced energy network

Families Citing this family (166)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8116915B2 (en) 2008-03-03 2012-02-14 University Of Delaware Methods and apparatus using hierarchical priority and control algorithms for grid-integrated vehicles
WO2010003711A1 (en) * 2008-07-08 2010-01-14 Siemens Aktiengesellschaft Adapter device and method for charging a vehicle
DE102008046747A1 (en) * 2008-09-11 2010-03-18 Hoppecke Advanced Battery Technology Gmbh Method for operating a production system and / or a local system in island operation
GB0816721D0 (en) * 2008-09-13 2008-10-22 Daniel Simon R Systems,devices and methods for electricity provision,usage monitoring,analysis and enabling improvements in efficiency
DE202008014767U1 (en) * 2008-09-16 2010-02-25 EnBW Energie Baden-Württemberg AG System for location-independent power purchase and / or for location-independent power supply of a mobile storage and consumption unit
DE102008044528A1 (en) * 2008-09-16 2010-03-18 EnBW Energie Baden-Württemberg AG Control device for a charging station for power supply and / or power supply of a mobile storage and consumption unit
JP5149753B2 (en) * 2008-09-24 2013-02-20 パナソニック株式会社 Mobile power billing system
WO2010043659A1 (en) * 2008-10-15 2010-04-22 Continental Teves Ag & Co. Ohg Data transfer in a vehicle and charging said vehicle
JP5243180B2 (en) * 2008-10-16 2013-07-24 白川 利久 Operation method of power generation with surface-derived power generation
CA2733288A1 (en) * 2008-10-31 2010-05-06 Levinton Manufacturing Company, Ltd. System and method for charging a vehicle
DE102008037575A1 (en) * 2008-11-21 2010-07-29 EnBW Energie Baden-Württemberg AG Computerized process for optimizing energy usage in a local system
DE202008015537U1 (en) * 2008-11-21 2010-04-08 EnBW Energie Baden-Württemberg AG Decentralized energy efficiency through autonomous, self-organizing systems taking into account heterogeneous energy sources
DE102008037576A1 (en) * 2008-11-21 2010-06-10 EnBW Energie Baden-Württemberg AG Computer-aided process for optimizing energy use
DK2192386T4 (en) 2008-11-27 2014-01-27 Ubitricity Ges Fuer Verteilte Energiesysteme Mbh Metering and measuring point system for measuring and measuring electrical energy and method
US8324859B2 (en) * 2008-12-15 2012-12-04 Comverge, Inc. Method and system for co-operative charging of electric vehicles
US8106627B1 (en) 2008-12-15 2012-01-31 Comverge, Inc. Method and system for co-operative charging of electric vehicles
US9505317B2 (en) 2008-12-22 2016-11-29 General Electric Company System and method for electric vehicle charging and billing using a wireless vehicle communication service
US9396462B2 (en) * 2008-12-22 2016-07-19 General Electric Company System and method for roaming billing for electric vehicles
US9030153B2 (en) 2008-12-22 2015-05-12 General Electric Company Systems and methods for delivering energy to an electric vehicle with parking fee collection
US8315930B2 (en) * 2008-12-22 2012-11-20 General Electric Company Systems and methods for charging an electric vehicle using broadband over powerlines
US20100161469A1 (en) * 2008-12-22 2010-06-24 Nathan Bowman Littrell Systems and methods for charging an electric vehicle using a wireless communication link
US8583551B2 (en) 2008-12-22 2013-11-12 General Electric Company Systems and methods for prepaid electric metering for vehicles
US9037507B2 (en) * 2009-04-28 2015-05-19 GM Global Technology Operations LLC Method to facilitate opportunity charging of an electric vehicle
ES2350225B1 (en) * 2009-06-16 2011-11-08 Nucleo De Comunicaciones Y Control, S.L. RECHARGE CONTROL SYSTEM AND METHOD FOR SMART ELECTRIC WALL ELECTRIC VEHICLES.
WO2011008506A2 (en) * 2009-06-29 2011-01-20 Powergetics, Inc. High speed feedback for power load reduction using a variable generator
WO2011014773A2 (en) * 2009-07-31 2011-02-03 Deka Products Limited Partnership Systems, methods and apparatus for vehicle battery charging
DE102009036816A1 (en) 2009-08-10 2011-02-17 Rwe Ag Control of charging stations
WO2011021973A1 (en) * 2009-08-20 2011-02-24 Telefonaktiebolaget L M Ericsson (Publ) Method of electrical charging
CN101998629B (en) * 2009-08-28 2014-05-21 国际商业机器公司 Method, device and system for searching for virtual resources
DE102009041409A1 (en) * 2009-09-16 2011-03-24 Georg, Erich W., Dr. Method for charging a battery pack
WO2011037322A2 (en) * 2009-09-25 2011-03-31 Lg Electronics Inc. Apparatus and method for controlling a battery
US8294420B2 (en) * 2009-09-29 2012-10-23 Schneider Electric USA, Inc. Kiosk vehicle charging and selecting systems
KR101045326B1 (en) * 2009-09-29 2011-06-30 한국전력공사 The System and Planning Method for Maximizing the Operation Benefit of Microgrid
KR101552480B1 (en) * 2009-10-30 2015-09-11 지멘스 악티엔게젤샤프트 Methods and devices for establishing communication between a first station and a second station
KR101611287B1 (en) * 2009-11-13 2016-04-11 엘지전자 주식회사 Smart metering device
US9177348B2 (en) 2010-01-05 2015-11-03 Lg Electronics Inc. Network system
US20110169447A1 (en) 2010-01-11 2011-07-14 Leviton Manufacturing Co., Inc. Electric vehicle supply equipment
US8558504B2 (en) 2010-01-11 2013-10-15 Leviton Manufacturing Co., Inc. Electric vehicle supply equipment with timer
RU2510557C1 (en) * 2010-01-14 2014-03-27 ЭлДжи ЭЛЕКТРОНИКС ИНК. Auxiliary device for powering home appliances, using intelligent network
JP5577717B2 (en) * 2010-01-25 2014-08-27 ソニー株式会社 How to manage power efficiently
US8541903B2 (en) * 2010-02-03 2013-09-24 Panasonic Automotive Systems Company Of America, Division Of Panasonic Corporation Of North America Power line communication system and method
US20110196711A1 (en) * 2010-02-05 2011-08-11 Panasonic Automotive Systems Company Of America, Division Of Panasonic Corporation Of North America Content personalization system and method
KR101069058B1 (en) * 2010-02-17 2011-09-29 엘지전자 주식회사 Water Purifier Using Intelligent Power Grid
US9043038B2 (en) 2010-02-18 2015-05-26 University Of Delaware Aggregation server for grid-integrated vehicles
IT1399055B1 (en) * 2010-03-16 2013-04-05 Beghelli Spa PLANT FOR ENERGY SUPPLY OF ELECTRIC TRACTION VEHICLES
EP2369710A1 (en) * 2010-03-26 2011-09-28 Alcatel Lucent A method of estimating an energy demand to be covered by a supplier, corresponding computer program product, and data storage device therefor
US20110238583A1 (en) * 2010-03-26 2011-09-29 Palo Alto Research Center Incorporated Technique for aggregating reactive power loads
JP2011217470A (en) * 2010-03-31 2011-10-27 Tokyo Electric Power Co Inc:The System control system and computer program
JP5707050B2 (en) * 2010-04-09 2015-04-22 学校法人慶應義塾 Virtual energy trading system
DE102010016751A1 (en) 2010-05-03 2011-11-03 EnBW Energie Baden-Württemberg AG Method for the location-independent receipt of electrical energy of a mobile consumption unit at a stationary charging station
DE102010021070A1 (en) * 2010-05-19 2011-11-24 Siemens Aktiengesellschaft Method for regulating the stability of an electrical supply network
CN102917908B (en) 2010-05-25 2016-06-08 三菱电机株式会社 Power information management devices and Power management information system and power information management method
WO2011156776A2 (en) 2010-06-10 2011-12-15 The Regents Of The University Of California Smart electric vehicle (ev) charging and grid integration apparatus and methods
US8359132B2 (en) 2010-06-16 2013-01-22 Toyota Motor Engineering & Manufacturing North America, Inc. System and method for optimizing use of a battery
KR101210204B1 (en) * 2010-07-02 2012-12-07 엘에스산전 주식회사 System, Apparatus and Method for Charge and Discharge of Electric Energy
US8493026B2 (en) * 2010-07-21 2013-07-23 Mitsubishi Electric Research Laboratories, Inc. System and method for ad-hoc energy exchange network
WO2012017937A1 (en) * 2010-08-05 2012-02-09 三菱自動車工業株式会社 Power demand-and-supply equalization system
KR101602509B1 (en) * 2010-08-13 2016-03-11 현대중공업 주식회사 System for controlling a charging infra for a electrical vehicle
EP2420401A1 (en) * 2010-08-19 2012-02-22 Alcatel Lucent Enhanced E-car charging equipment
CA2809442A1 (en) * 2010-08-26 2012-03-29 Terafero Bvba Intelligent electronic interface for a thermal energy storage module, and methods for stored thermal energy and thermal energy storage capacity trading
CN102385002B (en) * 2010-08-27 2014-09-17 西门子公司 Intelligent electricity meter and electricity using requirement controlling system and method
KR101161982B1 (en) * 2010-09-03 2012-07-03 엘에스산전 주식회사 System for Remote Management of Electric Vehicle
US20120065801A1 (en) * 2010-09-10 2012-03-15 Comverge, Inc. Method and system for controlling a building load in tandem with a replenishable energy source in order to increase the apparent size of the replenishable energy source
JP5658955B2 (en) * 2010-09-15 2015-01-28 株式会社東芝 Information communication apparatus and information communication method
JP5630176B2 (en) * 2010-09-16 2014-11-26 ソニー株式会社 Power supply
JP5705494B2 (en) * 2010-10-06 2015-04-22 アルパイン株式会社 In-vehicle navigation device and in-vehicle storage battery charge / discharge control method
JP2012085383A (en) * 2010-10-07 2012-04-26 Mitsubishi Electric Corp Charge/discharge system, charge/discharge apparatus and electric vehicle
US20120089408A1 (en) * 2010-10-08 2012-04-12 NRG EV Services, LLC Method and System for Providing a Fueling Solution for Electric Vehicle Owners
JP5220078B2 (en) * 2010-10-08 2013-06-26 三菱電機株式会社 In-vehicle charging / discharging device
CN102447294A (en) * 2010-10-08 2012-05-09 台达电子工业股份有限公司 Vehicle charge system with functions of charge efficiency control and self-adaptive charge service
US8594859B2 (en) * 2010-10-18 2013-11-26 Qualcomm Incorporated Method and system for real-time aggregation of electric vehicle information for real-time auctioning of ancillary services, and real-time lowest cost matching electric vehicle energy demand to charging services
CN102055217B (en) * 2010-10-27 2012-09-19 国家电网公司 Electric vehicle orderly charging control method and system
JP5556740B2 (en) * 2010-10-28 2014-07-23 Smk株式会社 Information providing apparatus, information providing server, and vehicle support system
JP5488419B2 (en) * 2010-11-17 2014-05-14 株式会社デンソー Vehicle management system, vehicle management center
FR2968107A1 (en) * 2010-11-25 2012-06-01 Denso Corp DEVICE FOR ESTIMATING THE ELECTRICITY REQUIREMENT OF A VEHICLE, DEVICE FOR PROCESSING ELECTRICAL DATA AND CHARGING SYSTEM
KR20120061281A (en) * 2010-12-03 2012-06-13 에스케이이노베이션 주식회사 System and Method for providing reactive power using electric car battery
GB2486649A (en) * 2010-12-21 2012-06-27 Responsiveload Ltd Remotely controlled autonomous responsive load
FR2970125B1 (en) * 2010-12-31 2019-09-06 Samson Equity Partners METHOD AND DEVICE FOR RECHARGING BATTERY AND VEHICLE TO IMPLEMENT THEM
KR101222705B1 (en) * 2011-01-06 2013-01-18 가천대학교 산학협력단 Method of Allotting Dynamic Priority for Charging Electric Car in Large Scale Charging Facilities
DE102011008676A1 (en) * 2011-01-15 2012-07-19 Daimler Ag System and method for charging batteries of vehicles
JP5460622B2 (en) * 2011-02-02 2014-04-02 三菱電機株式会社 Hierarchical supply and demand control device and power system control system
WO2012120736A1 (en) 2011-03-04 2012-09-13 日本電気株式会社 Charging control system
ES2451368T3 (en) 2011-03-10 2014-03-26 Accenture Global Services Limited Improvement of distribution grid for plug-in electric vehicles
GB2479060B (en) 2011-03-24 2012-05-02 Reactive Technologies Ltd Energy consumption management
US8972074B2 (en) * 2011-03-30 2015-03-03 General Electric Company System and method for optimal load planning of electric vehicle charging
GB2494368B (en) * 2011-04-27 2014-04-02 Ea Tech Ltd Electric power demand management
US8633678B2 (en) 2011-05-10 2014-01-21 Leviton Manufacturing Co., Inc. Electric vehicle supply equipment with over-current protection
US8232763B1 (en) * 2011-05-20 2012-07-31 General Electric Company Electric vehicle profiles for power grid operation
JP5662877B2 (en) 2011-06-03 2015-02-04 ルネサスエレクトロニクス株式会社 Battery system
JP5776017B2 (en) * 2011-07-21 2015-09-09 パナソニックIpマネジメント株式会社 Storage battery charging plan support system
JP5909906B2 (en) 2011-07-21 2016-04-27 ソニー株式会社 Information processing apparatus, information processing method, program, recording medium, and information processing system
DE102011108381B4 (en) * 2011-07-22 2013-02-21 Audi Ag A method of assisting a person in planning a trip with an electric vehicle and motor vehicle having a navigation device
JP5850672B2 (en) * 2011-08-19 2016-02-03 Ihi運搬機械株式会社 Parking equipment
WO2013029670A1 (en) * 2011-08-31 2013-03-07 Siemens Aktiengesellschaft Method and arrangement for determining the magnitude of an amount of electrical energy
EP2572922A1 (en) * 2011-09-26 2013-03-27 Alcatel Lucent Method of charging an energy storage unit
JP5701730B2 (en) * 2011-09-30 2015-04-15 株式会社東芝 Charge / discharge determination device, charge / discharge determination method, and charge / discharge determination program
WO2013063306A1 (en) * 2011-10-26 2013-05-02 Aker Wade Power Technologies, Llc Electric vehicle charging apparatus and method
EP2774010B1 (en) * 2011-10-31 2019-11-06 ABB Schweiz AG Systems and methods for restoring service within electrical power systems
JP6194795B2 (en) 2011-11-01 2017-09-13 日本電気株式会社 Charge control device, battery management device, charge control method and program
US9620970B2 (en) 2011-11-30 2017-04-11 The Regents Of The University Of California Network based management for multiplexed electric vehicle charging
KR101917077B1 (en) * 2011-12-12 2019-01-25 삼성전자주식회사 Power consumption control apparatus and method
US9358896B2 (en) * 2011-12-27 2016-06-07 Mitsubishi Electric Corporation Energy management system
JP5702000B2 (en) * 2012-01-06 2015-04-15 株式会社日立製作所 Power system stabilization system and power system stabilization method
DE102012001396A1 (en) * 2012-01-26 2013-08-01 Elektro-Bauelemente Gmbh Charging station for providing electrical energy for vehicles and method for operating a charging station
KR101890675B1 (en) * 2012-02-07 2018-08-22 엘지전자 주식회사 Smart meter for smart grid and method for performing service
SG11201404797SA (en) 2012-02-13 2014-09-26 Accenture Global Services Ltd Electric vehicle distributed intelligence
WO2013123988A2 (en) * 2012-02-22 2013-08-29 Telefonaktiebolaget L M Ericsson (Publ) System and method for consumption metering and transfer control
DE102012203121A1 (en) * 2012-02-29 2013-08-29 Siemens Aktiengesellschaft Energy management system for charging station for e.g. electric traction vehicle, has control units adapted to implement control actions for electric power generating units and/or storage device to stabilize system
CN104205553B (en) * 2012-03-21 2017-11-10 丰田自动车株式会社 Electric vehicle, power equipment and electric power supply system
FR2993724B1 (en) * 2012-07-17 2014-08-22 Schneider Electric Ind Sas METHOD AND DEVICE FOR DISTRIBUTING ELECTRIC POWER FLOW AND ELECTRICAL SYSTEM COMPRISING SUCH A DEVICE
DE102012014456A1 (en) * 2012-07-21 2014-01-23 Audi Ag Method for operating a charging station
JP5978052B2 (en) * 2012-08-02 2016-08-24 株式会社日立製作所 Distribution management system and method
WO2014031041A1 (en) 2012-08-20 2014-02-27 Telefonaktiebolaget L M Ericsson (Publ) Policy composing apparatus and control method therefor
US9434271B2 (en) * 2012-09-04 2016-09-06 Recargo, Inc. Conditioning an electric grid using electric vehicles
EA201590559A1 (en) * 2012-09-13 2015-10-30 Диджитата Лимитед CONSUMER MANAGEMENT OF CONSUMER TYPE SERVICES
WO2014048463A1 (en) * 2012-09-26 2014-04-03 Siemens Aktiengesellschaft Device having a stationary buffer battery for charging electrical energy accumulators and method
WO2014050735A1 (en) 2012-09-27 2014-04-03 日本電気株式会社 Information processing device, power-consuming body, information processing method, and program
EP2713463B1 (en) * 2012-09-28 2018-06-13 Enrichment Technology Company Ltd. Energy storage system
US10284003B2 (en) 2012-10-09 2019-05-07 General Electric Company End-user based backup management
EP2746093A1 (en) * 2012-12-21 2014-06-25 Fundació Privada Barcelona Digital Centre Tecnologic Method and apparatus for optimized management of an electric vehicle charging infrastructure
EP2939319A4 (en) 2012-12-28 2016-07-06 Younicos Inc Managing an energy storage system
EP2756981A1 (en) * 2013-01-16 2014-07-23 Abb B.V. System for exchanging energy with an electric vehicle
AP2015008779A0 (en) * 2013-03-19 2015-09-30 Electricite De France Energy maintenance device and its associated method
JP6466407B2 (en) * 2013-04-08 2019-02-06 ジョ−ライン コーポレーション リミテッド Location-based power intermediary module, electric vehicle and intermediary server, and user authentication outlet or connector used therefor
KR101498100B1 (en) * 2013-04-08 2015-03-13 조성규 Electric car and intermediate server for location based power mediation
EP3039771B1 (en) * 2013-08-28 2018-05-09 Robert Bosch GmbH System and method for energy asset sizing and optimal dispatch
KR101456098B1 (en) * 2013-10-29 2014-11-03 한국전기연구원 Method of recognizing PLC modem location based on channel estimation
JPWO2015064267A1 (en) 2013-10-31 2017-03-09 日本電気株式会社 Information processing apparatus, power consumer, information processing method, and program
CN103595107B (en) * 2013-12-02 2015-11-11 国家电网公司 Electric automobile charge-discharge control system and method
DE102013226415A1 (en) * 2013-12-18 2015-06-18 Siemens Aktiengesellschaft Method for energy billing of mobile energy consumers in a power supply network and device of a mobile energy consumer for billing energy in a power grid
CN103679297A (en) * 2013-12-26 2014-03-26 杭州国电电气设备有限公司 Method and device for calculating power supply reliability of power distribution network
GB2528505A (en) * 2014-07-24 2016-01-27 Intelligent Energy Ltd Energy resource system
GB201420198D0 (en) 2014-11-13 2014-12-31 Graham Oakes Ltd A system and method for controlling devices in a power distribution network
FR3031863B1 (en) * 2015-01-19 2018-07-13 Water Manager Sarl EVOLVING SYSTEM AND METHODS FOR MONITORING AND CONTROLLING SANITARY FACILITIES BY DISTRIBUTED CONNECTED DEVICES
WO2017018395A1 (en) * 2015-07-29 2017-02-02 京セラ株式会社 Management server and management method
US9977450B2 (en) 2015-09-24 2018-05-22 Fujitsu Limited Micro-balance event resource selection
US20170169525A1 (en) * 2015-12-10 2017-06-15 Open Access Technology International, Inc. Systems to electronically catalog and generate documentation for retail-level power
KR101923698B1 (en) * 2016-03-07 2019-02-22 한국전자통신연구원 Apparatus and method for providing emergency electrical power in multiple microgrids environment
US10011183B2 (en) * 2016-03-09 2018-07-03 Toyota Jidosha Kabushiki Kaisha Optimized charging and discharging of a plug-in electric vehicle
KR101859067B1 (en) * 2016-06-27 2018-06-28 한전케이디엔주식회사 Information management system for electric vehicle
JP7153936B2 (en) * 2016-09-21 2022-10-17 ザ ユニバーシティ オブ バーモント アンド ステイト アグリカルチャー カレッジ Systems and Methods for Randomized Packet-Based Power Management of Conditionally Controlled Loads and Bidirectional Distributed Energy Storage Systems
DE102016120575A1 (en) * 2016-10-27 2018-05-03 Tobias Mader Storage unit for a consumer and storage system
KR102007224B1 (en) * 2016-11-08 2019-10-21 주식회사 스타코프 Terminal for charging electrical vehicle, computing device and method using them
CN106875574B (en) * 2017-01-11 2020-07-14 上海蔚来汽车有限公司 Power-on resource reservation method using time fragmentation
JP7013864B2 (en) * 2017-12-28 2022-02-01 トヨタ自動車株式会社 automobile
KR102061474B1 (en) * 2017-12-28 2020-01-02 한국전력공사 Electric vehicle including watt-hour meter and system for managing mobile power supplier
GB2577853B (en) * 2018-06-22 2021-03-24 Moixa Energy Holdings Ltd Systems for machine learning, optimising and managing local multi-asset flexibility of distributed energy storage resources
CN109638858B (en) * 2018-11-30 2021-10-15 中国能源建设集团广东省电力设计研究院有限公司 Frequency modulation peak regulation method, device and system
EP3689667A1 (en) 2019-01-30 2020-08-05 Green Motion SA Electrical vehicle charging station with power management
CN109768610A (en) * 2019-03-05 2019-05-17 国家电网有限公司 The charging method and system of electric vehicle
JP7404917B2 (en) * 2020-02-14 2023-12-26 トヨタ自動車株式会社 Power management system, power management method, and power management device
US11890952B2 (en) 2020-03-17 2024-02-06 Toyot Motor North America, Inc. Mobile transport for extracting and depositing energy
US11552507B2 (en) 2020-03-17 2023-01-10 Toyota Motor North America, Inc. Wirelessly notifying a transport to provide a portion of energy
US11618329B2 (en) 2020-03-17 2023-04-04 Toyota Motor North America, Inc. Executing an energy transfer directive for an idle transport
US11685283B2 (en) 2020-03-17 2023-06-27 Toyota Motor North America, Inc. Transport-based energy allocation
US11571983B2 (en) 2020-03-17 2023-02-07 Toyota Motor North America, Inc. Distance-based energy transfer from a transport
US11571984B2 (en) 2020-04-21 2023-02-07 Toyota Motor North America, Inc. Load effects on transport energy
JP6781493B1 (en) * 2020-05-11 2020-11-04 株式会社Luup Operations support system
CN111753097B (en) * 2020-06-22 2023-11-14 国能日新科技股份有限公司 Deep learning-based data analysis method and device for electric power spot transaction clearance
GB2598728A (en) * 2020-09-08 2022-03-16 Measurable Ltd Power socket for reducing wastage of electrical energy and related aspects
CN113036898A (en) * 2021-02-25 2021-06-25 云南电网有限责任公司电力科学研究院 Novel household electric energy router system and control method
FI20216007A1 (en) * 2021-09-29 2023-03-30 Kempower Oy Apparatus, arrangement, charging apparatus, method and computer program product for controlling charging event
CN114274827A (en) * 2021-12-06 2022-04-05 上海电享信息科技有限公司 Charging station control system combining cloud service and local control
US11695274B1 (en) 2022-03-21 2023-07-04 Nuvve Corporation Aggregation platform for intelligent local energy management system
US11747781B1 (en) 2022-03-21 2023-09-05 Nuvve Corporation Intelligent local energy management system at local mixed power generating sites for providing grid services
CN115086435A (en) * 2022-06-14 2022-09-20 上海臻绅智能科技有限公司 Intelligent energy comprehensive distribution and control system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6388564B1 (en) * 1997-12-04 2002-05-14 Digital Security Controls Ltd. Power distribution grid communication system
US20050138432A1 (en) * 1997-02-12 2005-06-23 Ransom Douglas S. System and method for routing power management via XML firewall

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1007139A1 (en) * 1997-02-12 2000-06-14 Prolifix Medical, Inc. Apparatus for removal of material from stents
EP1242932A4 (en) * 1999-07-15 2004-04-07 Ebidenergy Com User interface to facilitate, analyze and manage resource consumption
JP3782924B2 (en) * 2000-07-27 2006-06-07 日本電信電話株式会社 Distributed energy community system and its control method
KR100402228B1 (en) * 2001-02-13 2003-10-17 주식회사 젤파워 method and system for power supply broker using communication network and power demand controller
US6673479B2 (en) * 2001-03-15 2004-01-06 Hydrogenics Corporation System and method for enabling the real time buying and selling of electricity generated by fuel cell powered vehicles
JP2003259696A (en) * 2002-02-28 2003-09-12 Jfe Engineering Kk Generation control method and program thereof
CA2480551A1 (en) * 2002-03-28 2003-10-09 Robertshaw Controls Company Energy management system and method
JP2004222176A (en) * 2003-01-17 2004-08-05 Sony Corp Communication system and communication method
US7259474B2 (en) * 2003-04-09 2007-08-21 Utstarcom, Inc. Method and apparatus for aggregating power from multiple sources
US20050125243A1 (en) * 2003-12-09 2005-06-09 Villalobos Victor M. Electric power shuttling and management system, and method
US7296117B2 (en) * 2004-02-12 2007-11-13 International Business Machines Corporation Method and apparatus for aggregating storage devices
JP2006204081A (en) * 2004-12-24 2006-08-03 Hitachi Ltd Supply and demand adjusting method, system and service by distributed power source
JP2006331405A (en) * 2005-04-21 2006-12-07 Ntt Facilities Inc Secondary battery supply system and secondary battery supply method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050138432A1 (en) * 1997-02-12 2005-06-23 Ransom Douglas S. System and method for routing power management via XML firewall
US6388564B1 (en) * 1997-12-04 2002-05-14 Digital Security Controls Ltd. Power distribution grid communication system

Cited By (62)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008044527A1 (en) * 2008-09-16 2010-03-25 EnBW Energie Baden-Württemberg AG Mobile electricity meter for location-independent electricity purchase and / or for location-independent power supply of a mobile storage and consumption unit
US8517132B2 (en) 2008-09-19 2013-08-27 Better Place GmbH Electric vehicle battery system
US8164300B2 (en) 2008-09-19 2012-04-24 Better Place GmbH Battery exchange station
US8454377B2 (en) 2008-09-19 2013-06-04 Better Place GmbH System for electrically connecting batteries to electric vehicles
US8118147B2 (en) 2009-09-11 2012-02-21 Better Place GmbH Cable dispensing system
US8246376B2 (en) 2009-09-14 2012-08-21 Better Place GmbH Electrical connector with flexible blade shaped handle
US8035341B2 (en) 2010-07-12 2011-10-11 Better Place GmbH Staged deployment for electrical charge spots
US9207698B2 (en) 2012-06-20 2015-12-08 Causam Energy, Inc. Method and apparatus for actively managing electric power over an electric power grid
US11782470B2 (en) 2012-07-14 2023-10-10 Causam Enterprises, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US10768654B2 (en) 2012-07-14 2020-09-08 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US10429871B2 (en) 2012-07-14 2019-10-01 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
WO2014014792A1 (en) 2012-07-14 2014-01-23 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US11126213B2 (en) 2012-07-14 2021-09-21 Causam Enterprises, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US11625058B2 (en) 2012-07-14 2023-04-11 Causam Enterprises, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US9563215B2 (en) 2012-07-14 2017-02-07 Causam Energy, Inc. Method and apparatus for actively managing electric power supply for an electric power grid
US10310534B2 (en) 2012-07-31 2019-06-04 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11501389B2 (en) 2012-07-31 2022-11-15 Causam Enterprises, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
US11650613B2 (en) 2012-07-31 2023-05-16 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US9513648B2 (en) 2012-07-31 2016-12-06 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US9806563B2 (en) 2012-07-31 2017-10-31 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US11747849B2 (en) 2012-07-31 2023-09-05 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10320227B2 (en) 2012-07-31 2019-06-11 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10381870B2 (en) 2012-07-31 2019-08-13 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10429872B2 (en) 2012-07-31 2019-10-01 Causam Energy, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11774996B2 (en) 2012-07-31 2023-10-03 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US11561565B2 (en) 2012-07-31 2023-01-24 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11561564B2 (en) 2012-07-31 2023-01-24 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10523050B2 (en) 2012-07-31 2019-12-31 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US11681317B2 (en) 2012-07-31 2023-06-20 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11316367B2 (en) 2012-07-31 2022-04-26 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10559976B2 (en) 2012-07-31 2020-02-11 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10651682B2 (en) 2012-07-31 2020-05-12 Causam Energy, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US11782471B2 (en) 2012-07-31 2023-10-10 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10852760B2 (en) 2012-07-31 2020-12-01 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US10861112B2 (en) 2012-07-31 2020-12-08 Causam Energy, Inc. Systems and methods for advanced energy settlements, network-based messaging, and applications supporting the same on a blockchain platform
US10938236B2 (en) 2012-07-31 2021-03-02 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10985609B2 (en) 2012-07-31 2021-04-20 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10998764B2 (en) 2012-07-31 2021-05-04 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US10996706B2 (en) 2012-07-31 2021-05-04 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11307602B2 (en) 2012-07-31 2022-04-19 Causam Enterprises, Inc. System, method, and data packets for messaging for electric power grid elements over a secure internet protocol network
US11095151B2 (en) 2012-07-31 2021-08-17 Causam Enterprises, Inc. System, method, and apparatus for electric power grid and network management of grid elements
US9704206B2 (en) 2012-10-24 2017-07-11 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9786020B2 (en) 2012-10-24 2017-10-10 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11263710B2 (en) 2012-10-24 2022-03-01 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11270392B2 (en) 2012-10-24 2022-03-08 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11288755B2 (en) 2012-10-24 2022-03-29 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11823292B2 (en) 2012-10-24 2023-11-21 Causam Enterprises, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US10529037B2 (en) 2012-10-24 2020-01-07 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US10521868B2 (en) 2012-10-24 2019-12-31 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US10497074B2 (en) 2012-10-24 2019-12-03 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US10497073B2 (en) 2012-10-24 2019-12-03 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9799084B2 (en) 2012-10-24 2017-10-24 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11195239B2 (en) 2012-10-24 2021-12-07 Causam Enterprises, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9779461B2 (en) 2012-10-24 2017-10-03 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US9418393B2 (en) 2012-10-24 2016-08-16 Causam Energy, Inc System, method, and apparatus for settlement for participation in an electric power grid
US9070173B2 (en) 2012-10-24 2015-06-30 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US8996419B2 (en) 2012-10-24 2015-03-31 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US8996418B2 (en) 2012-10-24 2015-03-31 Causam Energy, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11798103B2 (en) 2012-10-24 2023-10-24 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11803921B2 (en) 2012-10-24 2023-10-31 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11816744B2 (en) 2012-10-24 2023-11-14 Causam Exchange, Inc. System, method, and apparatus for settlement for participation in an electric power grid
US11004160B2 (en) 2015-09-23 2021-05-11 Causam Enterprises, Inc. Systems and methods for advanced energy network

Also Published As

Publication number Publication date
MX2009006239A (en) 2010-02-11
KR20090119831A (en) 2009-11-20
MX2009006236A (en) 2010-02-11
CA2672454A1 (en) 2008-06-19
WO2008073453A1 (en) 2008-06-19
BRPI0720301A2 (en) 2014-02-04
KR20100014304A (en) 2010-02-10
MX2009006238A (en) 2010-02-11
WO2008073474A3 (en) 2008-08-07
WO2008073470A2 (en) 2008-06-19
EP2102028A1 (en) 2009-09-23
WO2008143653A2 (en) 2008-11-27
BRPI0719998A2 (en) 2014-03-18
BRPI0720300A2 (en) 2014-02-04
EP2099639A2 (en) 2009-09-16
EP2097289A2 (en) 2009-09-09
WO2008073476A2 (en) 2008-06-19
BRPI0719999A2 (en) 2014-03-18
WO2008073476A3 (en) 2008-08-07
WO2008073474A2 (en) 2008-06-19
CA2672508A1 (en) 2008-11-27
CA2672422A1 (en) 2008-06-19
WO2008073477A3 (en) 2008-08-07
KR20090119832A (en) 2009-11-20
CN101678774A (en) 2010-03-24
EP2115686A2 (en) 2009-11-11
IL199293A0 (en) 2010-03-28
WO2008073472A2 (en) 2008-06-19
JP2010512727A (en) 2010-04-22
KR20090119833A (en) 2009-11-20
IL199291A0 (en) 2010-03-28
KR20090119754A (en) 2009-11-19
WO2008143653A3 (en) 2009-04-16
BRPI0720002A2 (en) 2013-12-17
WO2008073472A3 (en) 2008-08-07
MX2009006240A (en) 2010-02-11
WO2008073470A3 (en) 2008-08-21
MX2009006237A (en) 2010-02-11
CA2672424A1 (en) 2008-06-19

Similar Documents

Publication Publication Date Title
US10892639B2 (en) Connection locator in a power aggregation system for distributed electric resources
US7747739B2 (en) Connection locator in a power aggregation system for distributed electric resources
US7844370B2 (en) Scheduling and control in a power aggregation system for distributed electric resources
US7949435B2 (en) User interface and user control in a power aggregation system for distributed electric resources
US10279698B2 (en) Power aggregation system for distributed electric resources
WO2008073477A2 (en) Connection locator in a power aggregation system for distributed electric resources
US20090043519A1 (en) Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources
US20080039979A1 (en) Smart Islanding and Power Backup in a Power Aggregation System for Distributed Electric Resources
US20080052145A1 (en) Power Aggregation System for Distributed Electric Resources
US20080040296A1 (en) Electric Resource Power Meter in a Power Aggregation System for Distributed Electric Resources
US20080040223A1 (en) Electric Resource Module in a Power Aggregation System for Distributed Electric Resources
US20090066287A1 (en) Business Methods in a Power Aggregation System for Distributed Electric Resources
US20080040295A1 (en) Power Aggregation System for Distributed Electric Resources
US20090043520A1 (en) User Interface and User Control in a Power Aggregation System for Distributed Electric Resources
US20080040263A1 (en) Business Methods in a Power Aggregation System for Distributed Electric Resources

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 07867731

Country of ref document: EP

Kind code of ref document: A2

WWE Wipo information: entry into national phase

Ref document number: 2672424

Country of ref document: CA

Ref document number: MX/A/2009/006239

Country of ref document: MX

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 1020097014279

Country of ref document: KR

WWE Wipo information: entry into national phase

Ref document number: 2007867731

Country of ref document: EP

ENP Entry into the national phase

Ref document number: PI0719998

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20090612