US20110112971A1 - Multi-team immersive integrated collaboration workspace - Google Patents
Multi-team immersive integrated collaboration workspace Download PDFInfo
- Publication number
- US20110112971A1 US20110112971A1 US13/006,313 US201113006313A US2011112971A1 US 20110112971 A1 US20110112971 A1 US 20110112971A1 US 201113006313 A US201113006313 A US 201113006313A US 2011112971 A1 US2011112971 A1 US 2011112971A1
- Authority
- US
- United States
- Prior art keywords
- project
- user
- schedule
- meeting
- projects
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Definitions
- This invention pertains to collaboration, and more particularly to providing an integrated collaboration workspace for teams of users.
- teams of users may be distributed around the world. For example, one team member might be located in Oregon, another in Australia, a third in Israel, and a fourth in Russia. That team members may be scattered around the world introduces new complications into coordinating team efforts.
- coordinating video- or tele-conferencing may be just as complex. For example, there is a 10-hour time difference between the Oregon and Israel. When it is 9:00 AM in Oregon, it is 7:00 PM in Israel. Factor in team members in other parts of the world, and it may be impossible to find a time to hold the meeting that is convenient to everyone's work schedule. As a result, some participants are forced to conference in to meetings at very awkward times.
- SharePoint is a document management system. It allows members of a team to share documents and other information. But SharePoint provides no way to connect multiple projects. For example, if a user wants to share a document across three different projects, the user has to connect to each project individually and add the documents to the project. In addition, the copies of the documents are not connected.
- SharePoint is also a hierarchical software package: using SharePoint requires working from the “top” of the software down to the desired functionality.
- Microsoft Office is a set of software programs, including Word, Excel, and Outlook® among others, for performing various tasks.
- Microsoft NetMeeting® is software that provides for network conferencing. (Microsoft, SharePoint, Outlook, and NetMeeting are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries.)
- Groove Networks®, Inc. offers software that allows real-time peer-to-peer interaction. Groove Networks software allows users to set up groups, but is otherwise outside not workflow oriented. Groove Networks software provides no interoperability, and no structure.
- Documentum, Inc. offers eRoom, which is a document management system, but it is little more than a document drop. eRoom does not provide for teamwork or multiple teams, and any functionality other than document management is an add-on to the basic eRoom software. (Documentum and eRoom are either trademarks or registered trademarks of Documentum, Inc.)
- ThinkDeskTM by Outhink, Inc., is a workflow tool. It acknowledges that users are sometimes involved in multiple projects simultaneously, and offers a drag-and-drop interface. But it does not allow users to see all of their projects at once. It does not allow users to be able to locate other team members, easily schedule and manage meetings, or in general engage in activities that involve the entire team.
- the program does offer a way to e-mail an appointment so that, upon acceptance by the recipient, the appointment is completely scheduled in the recipient's calendar. But to send the appointment requires digging through menus within the program in a non-intuitive manner for a rather buried feature.
- FIGS. 1A-1C show systems for using in a collaborative workspace, according to embodiments of the invention.
- FIG. 2 shows software used to implement the collaborative workspace in the system of FIGS. 1A-1C , according to an embodiment of the invention.
- FIG. 3 shows a collaborative workspace as used in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- FIG. 4 shows details about the avatars of the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 5 shows details of a deliverable list for a project in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 6 shows details of a project schedule in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 7 shows details of a data repository in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 8 shows details of a tool palette in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 9 shows details of a meeting list in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIG. 10 shows details of links to other projects in the collaborative workspace of FIG. 3 , according to an embodiment of the invention.
- FIGS. 11A-11E show a meeting room as used in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- FIG. 12 shows a personal workspace as used in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- FIG. 13 shows details of a personal deliverable list in the personal workspace of FIG. 12 , according to an embodiment of the invention.
- FIG. 14A shows details of a personal schedule in the personal workspace of FIG. 12 , according to an embodiment of the invention.
- FIG. 14B shows the personal schedule of FIG. 14A rolled up, according to an embodiment of the invention.
- FIGS. 15A-15C show an embodiment of the invention as used in the systems of FIGS. 1A-1C propagating changes across projects and creating conflicts, according to an embodiment of the invention.
- FIG. 16 shows an embodiment of the invention as used in the systems of FIGS. 1A-1C resolving conflicts by prioritization, according to an embodiment of the invention.
- FIGS. 17A-17B show a flowchart of the procedure for propagating changes across projects in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- FIGS. 18A-18B show a flowchart of the procedure for rolling up two or more schedules in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- FIG. 19 shows a flowchart of the procedure for using an architecture in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- the hardware and software used to implement an embodiment of the invention may operate in accord with a client-server model.
- the client hardware may be any variety of computer located convenient to the user.
- the client may be a desktop computer, a laptop computer, a personal digital assistant (PDA), or even a terminal (with no local computing ability).
- PDA personal digital assistant
- the server hardware may be any variety of computer as well, although if the client is a terminal, the server would provide the processing power for the terminal.
- the software on the client and server implement the embodiments of the invention described above.
- the server stores information about the project (and, by extension, about other projects, possibly including projects to which the user is not a member). Projects are also sometimes called collaborative workspaces.
- “web services” type technology may be utilized to coordinate client and server participation in a project.
- “Web services,” as the phase is used herein, describes a standardized way of describing, discovering, and integrating network applications, services and resources using open standards, such as World Wide Web Consortium (W3C) and Internet Engineering Task Force (IETF) standards, including XML (Extensible Markup Language), SOAP (Simple Object Access Protocol), WSDL (Web Services Description Language), UDDI, UPnP (Universal Plug and Play), etc., over a network, such as the Internet or other network. Accordingly, these or other technologies may be used to describe and/or discover various components that may comprise one or more embodiments of the invention.
- W3C World Wide Web Consortium
- IETF Internet Engineering Task Force
- the server stores any information that should be centralized. For example, users may be members of multiple projects, and so the user's schedule may affect multiple projects. Thus, the user's schedule should be centralized. Similarly, documents that any team member may edit are stored on the server. On the other hand, data that does not change or that is pertinent to a single user only may be stored on the client, although it will be appreciated that the server may be used to cache or backup a client's data. A person skilled in the art will recognize which data typically are stored on the server and which are stored on the client. The client and server communicate as needed to keep the user up-to-date on projects.
- the client stores the software to carry out any commands requested by the user (although carrying out the commands may involve retrieving data from the server).
- the client sends messages to the server to update data on the server. For example, if the user blocks out some time in his or her schedule, the client communicates this information to the server, so that the server may propagate this change to other projects and users as needed. Similarly, the server communicates with the client as needed. For example, if a change is to be propagated to the user, the server notifies the client about the change, so that the client may notify the user.
- the client and server are connected via some communications mechanism.
- the communications mechanism is a network, although a person skilled in the art will recognize that the client and server may communicate in other ways: for example, by being directly connected in some manner.
- the network may be any variety of network: for example, Ethernet (either Megabit or Gigabit Ethernet) or a wireless network utilizing Bluetooth or any of the IEEE 802.11a/b/g standards, among others.
- the Bluetooth standard may be found at “http:##www.bluetooth.com#dev#specifications.asp,” and the IEEE 802.11a/b/g standards may be found online at “http:##standards.ieee.org#catalog#olis#lanman.html” (to avoid inadvertent hyperlinks, forward slashes (“/”) in the preceding uniform resource locator (URL) have been replaced with pound signs (“#”)).
- the hardware and software used to implement embodiments of the invention may be offer a peer-to-peer communication model.
- all information typically is distributed: there is no centralized location where data is stored.
- the computers are networked in any manner desired, similar to the network described above for the client-server model.
- the client computers communicate with each other directly, requesting data as needed.
- the peer-to-peer network may include a server, instead of being limited to client-client communication.
- the server may act as a central hub through which communications between the clients pass, or it may act as a central repository, providing a centralized backup of data otherwise stored on the clients.
- a person skilled in the art will recognize other ways in which a server may be used in a peer-to-peer network.
- a user wants to schedule a meeting, his or her computer sends a request to all other computers in the network, requesting the schedules of users. Once all schedules are received, the user's computer then shows everyone's schedules, allowing the user to schedule the meeting at a time convenient to everyone. Once scheduled, notice of the meeting is forwarded to all the other computers, so that the other team members are notified about the meeting.
- information may be sent without warning to a computer in the peer-to-peer network. For example, suppose a user has completed an action in a project. That user's computer sends notice that the action was completed to the other computers in the peer-to-peer network. Other team members on that project may then be notified that the action occurred.
- FIGS. 1A-1C show three computers connected according to embodiments of the invention.
- computers 105 , 110 , and 115 are directly connected.
- the embodiment of FIG. 1A may be representative of a peer-to-peer configuration where the computers are connected by a network.
- FIG. 1B shows computers 105 , 110 , and 115 connected via network 120 .
- FIG. 1B may be representative of a peer-to-peer configuration using a network.
- server 125 acts as a centralized location through which the collaborative workspace operates.
- server 125 may be connected to network 120 of FIG. 1B , that there may be fewer or more than three computers, and other ways in which computers 105 , 110 , and 115 may be connected.
- FIG. 2 shows software used to implement the collaborative workspace in the system of FIGS. 1A-1C , according to an embodiment of the invention.
- server 125 is shown, suggesting the client-server model of FIG. 1C , but a person skilled in the art will recognize that any of computers 105 , 110 , and 115 may be substituted for server 125 in other embodiments.
- Server 125 is shown including project workspaces 205 and 210 , and may include more project workspaces as needed.
- Project workspaces 205 and 210 are places where users may work together on projects.
- Server 125 also includes personal workspaces 215 and 220 , which are places where users may monitor their projects and maintain things of personal interest.
- Server 125 includes schedule combiner 225 , which is responsible for rolling schedules together. As will be discussed further with reference to FIGS. 14A-14B below, multiple schedules may be rolled together to present a combined view to a user.
- Server 125 also includes propagation arrangement 230 , which is responsible for propagating changes across projects.
- Propagation arrangement 230 includes determiner 235 , which determines user/project combinations and whether any conflicts exist, schedule changer 240 , which changes schedules as needed when conflicts arise, and prioritizer 245 , which determines relative priority between two projects to resolve conflicts.
- An embodiment of the invention is a collaborative workspace in which individual users may keep track of all of the projects on which they are working, and in which individual users may see the progress of the project as a whole.
- the embodiments of the invention enable team members to be easily found and to become organized. Work on the project is coordinated from a single work environment.
- the collaborative workspace enables interaction with remote colleagues without necessitating communicating at awkward times. Team members may easily determine who is currently available, what the schedules of the individual team members look like, and who has done what on the project.
- An embodiment of the invention includes project space 205 , as shown in FIG. 3 .
- Project space 205 provides a mechanism by which the members of a single project may (for example, visually) track progress in working on the project, keep track of the other team members, and coordinate work and communication, among other functions.
- the project space may include avatars 305 of individual users, a place to drop deliverables 310 , a team schedule 315 , a data repository 320 , a link to a meeting room 325 , and a tool set 330 .
- FIG. 3 also shows meeting list 335 , links 340 to other projects, link 345 to a user's personal workspace, and link 350 to the project space.
- meeting list 335 links 340 to other projects
- link 345 to a user's personal workspace
- link 350 to the project space.
- Avatars 305 represent the individual members (sometimes called “team members”) of the project.
- avatar 405 represents Alice Abrams
- avatar 410 represents Brian Barker.
- the avatars let individual team members know about the other members of the team.
- the avatars are customizable, so that each team member may include the information he or she wants to include.
- an avatar includes a picture of the team member, information about the team member's location, and the local day and time at the team member's location.
- avatar 405 includes picture 415 , and location, local day, and local time 420 . Location, day, and time information may be useful in keeping track of schedules as the earth rotates around its axis. When it is 3:00 PM in Oregon, it is 11:00 PM in Israel. Thus, Alice knows that unless Brian is working an unusual schedule, he probably asleep at this time.
- the avatars may also include any additional information the user wants to make available to team members.
- an avatar may include a video or audio segment of the team member, so that other team members may get a better feel for whom the team member is.
- the avatar may include a link to photos from the user's most recent vacation.
- avatar 405 includes link 425 .
- the avatar may also include a (iconic) mood indicator, letting other team members know how the team member is currently feeling. For example, if the team member is in his or her office and everything is fine, the avatar may include an icon showing a smiley face. Mood indicator 430 shows everything is currently fine for Alice. But if the team member is sick, the avatar may include an icon showing a sad face, with a thermometer in its mouth and a hot water bag on its head. Or if the team member is currently asleep (for example, if the current local time is between 10:00 PM and 6:00 AM), the avatar may include an icon with eyes shut and “Zzz”s overhead, as shown in mood indicator 435 in avatar 410 for Brian.
- a (iconic) mood indicator letting other team members know how the team member is currently feeling. For example, if the team member is in his or her office and everything is fine, the avatar may include an icon showing a smiley face. Mood indicator 430 shows everything is currently fine for Alice. But if the team member is sick, the avatar may
- the mood indicator may be changed by the user according to his or her current mood
- the mood indicator may also be predictive.
- a predictive mood indicator attempts to guess at the user's current mood, without the user actually indicating the mood directly.
- the mood indicator may predict that the user is asleep outside of normal working hours (whatever is considered “normal” for the user, given his or her current location and typical work hours, among other factors).
- the mood indicator may identify the user as traveling, if the user's current schedule shows him or her as traveling.
- the mood indicator may predict the user as being in a poor mood (or just plain angry) if the user's schedule shows him or her as having work due in a short frame of time.
- the mood indicator may also show gradations of anger, depending on how much work the user has due, and how short the time frame is for completing the work.
- mood indicator may also show gradations of anger, depending on how much work the user has due, and how short the time frame is for completing the work.
- horoscopes for example, horoscopes, biorhythms, and analysis of the language used in e-mails sent by the user.
- FIG. 4 shows the team member's location in avatars 405 and 410 using a simple text listing (in text), the avatar might include a projection of the earth, with the team member's location at the center of the projection.
- the team member's availability i.e., whether the user is currently at work
- the mood indicator described above is described as iconic, the avatar could also present the user's mood textually.
- the avatars (and, indeed, all components of the project space) may be responsive to events, so that, for example, the passage of the mouse over an avatar may change the information displayed in the avatar.
- a person skilled in the art will recognize other ways in which avatar information may be presented to team members.
- avatars used to represent users are different from the standard concept of “avatar” as used for on-line gaming.
- an avatar is present only when the player is connected to the game, to let others know about the player's presence.
- the avatar is present only when the player is absent, so that the avatar may act as an agent on behalf of the (absent) player.
- the two models of on-line gaming avatars do not coexist: that is, avatars are not used to both represent the player's presence and to act as an agent in the player's absence.
- the avatars of an embodiment of the invention represent the user at all times, even when absent, but do not act as an agent for the user when he or she is absent.
- FIG. 5 shows deliverables drop 310 with five document deliverables.
- Documents 505 and 510 have already been placed in deliverables drop 310 ; documents 515 , 520 , and 525 remain to be completed.
- different projects will have different deliverables, in terms of both numbers of documents and their types. For example, one project might include three Microsoft Word documents, whereas another project might include one Microsoft Excel document.
- the particular locations within the deliverables drop for each document may be templated, so that only a document of the correct type is placed in that drop. Templating deliverable drops may help ensure that the correct file is placed in the correct slot.
- a template indicates that document 515 is a Microsoft Word document: if any other type of document is placed in that slot, the project space may alert the user to the fact that the wrong document type was placed in deliverables drop 310 .
- the deliverables drop may be color-coded, to make it easy for team members to see what has been completed and what remains to be completed.
- deliverables that have been placed in the deliverables drop 310 such as documents 505 and 510
- deliverables that have yet to be placed in the deliverables drop may be colored red, to indicate the need to complete the documents.
- red may be reserved for documents that are behind schedule, with some other color (or no color at all) used to indicate documents that have yet to be delivered but are not yet due.
- document 515 is behind schedule, and colored red, represented by the crosshatch fill pattern.
- Documents 520 and 525 although not yet in deliverables drop 310 , are not yet due, and are not colored. A person skilled in the art will recognize other color schemes that may be used to facilitate document identification as well as monitoring associated actions, if any.
- This color-coding makes it easy for users to quickly find out the status of any deliverables. For example, suppose that one team member is responsible for preparing a requirements document for the project, but another team member is responsible for the actual development of the product. The product may not (in theory) be developed until after the requirements are determined. So, the team member responsible for development waits until he or she sees that the requirements document has been added to the deliverables drop. This lets the development team member know that the requirements are “finalized,” and that he or she may proceed with development.
- the documents in the deliverables drop may also be linked. For example, suppose that the time has passed to complete the development of the product, but the requirements document remains unfinished. Since the product may not be developed (in theory) until the requirements are defined, it accomplishes little to let everyone know that the development document is overdue (except, perhaps, to further motivate the team member responsible for the requirements document). Thus, the development document, even though overdue, might not be color-coded as overdue, as it depends on the as-yet-incomplete requirements document.
- the team schedule shown in greater detail in FIG. 6 , as suggested by the name, provides a schedule for the team.
- Information in the team schedule may be organized in several different ways. The first, and most intuitive way, is to show each team member's schedule as it relates to the project. (That individual users might be involved in multiple projects, and therefore not available during times not scheduled for the project, is discussed below.) For each team member, the time(s) he or she has worked and will work on the project are shown. This information may also be marked to identify work status: that is, work that has been completed and work that is pending. Additional work status information may include work that is urgent versus work that is low-priority (or even, perhaps, optional).
- the work may be divided into different types of work: for example, meetings, travel, and “real” work.
- color codes may be used to identify the different types of work and the status of the work, similar to the color codes used for the deliverables drop, as described above.
- the team schedule may also display the state of different work phases. For example, there may be an initial stage, a requirements analysis phase, a development phase, and a testing phase. Each phase may be assigned different time periods on the schedule, according to the projected schedule for the project. Work phase schedules, like the schedules of individual users, may be color-coded.
- Schedule 315 of FIG. 6 shows both of these alternatives.
- Phases 605 show the various phases of work, and names 610 identifies the particular team members, along with the intervals when they are working on the project.
- Shading, as an alternative to color, in FIG. 6 represents different types of activities occurring in schedule 315 .
- interval 615 represents a time span spent on a particular phase of work
- interval 620 represents a period when a team member (in this case, Alice Abrams) is actually working.
- Schedule 315 also reflects action items. As discussed above with reference to FIG. 5 , color may be used to differentiate completed, overdue, and future action items. For example, action item 625 is completed, action item 630 is overdue, and action item 635 is due in the future.
- the data repository 320 acts as a central location where documents may be stored when not actively needed. For example, if the project has passed the requirements analysis phase and has begun development, the requirements analysis document may be stored in the data repository 320 . Of course, if the requirements analysis needs to change to reflect a reality not anticipated before development, the document may be retrieved from the data repository 320 , edited, and then returned to the data repository 320 . (If needed, the document may also be retrieved from the deliverables drop, so that the deliverables drop includes the most current version of the document.
- the document in the deliverables drop is linked to the document in the data repository 320 , so that changes made to either document are automatically reflected in the other.
- the data repository 320 may be represented as having different “drawers,” such as drawers 705 , 710 , 715 , and 720 , each drawer acting like a folder.
- the tool palette 330 is a set of tools that may be used by the team members. Shown in greater detail in FIG. 8 , the tool palette may include tool such as a chat or instant messaging tool, an e-mail tool, a search tool, a meeting scheduling tool, and a contacts list. Each of these tools acts generally as the name implies, although the search tool does more than search just documents. For example, the search tool may enable team members to search for other users (which causes the located user's avatar to appear in the project space), or to search within playbacks of document changes from the meeting room for what changes were made by particular users (which lists documents changed by the desired user).
- search tool may enable team members to search for other users (which causes the located user's avatar to appear in the project space), or to search within playbacks of document changes from the meeting room for what changes were made by particular users (which lists documents changed by the desired user).
- the meeting scheduling tool lists all currently scheduled meetings, so that the user may view details about the meetings, and allows the user to schedule a new meeting.
- These tools may be implemented as an Application Program Interface (API), which provides users with access to the tools and allows for a way to modify the tool set (allowing for new combinations as new tools are added).
- API Application Program Interface
- the meeting scheduling tool may include a meeting list 335 , shown in FIG. 9 .
- the meeting list 335 shows all currently scheduled meetings and provides a link 905 to the meeting scheduling tool.
- the meeting list 335 may be displayed in the project space as another component of the project space.
- Completed meetings are indicated in FIG. 9 with a check mark, and other symbols are used to represent important points.
- document icon 910 indicates that a document is attached to the meeting
- tape icon 915 indicates there is an audio presentation
- video icon 920 indicates there is a video presentation. Selecting these icons may open the related document, presentation, etc.
- FIG. 10 shows more detail about links 340 .
- the project space lets users keep an eye on other projects as well. For example, an individual user might be involved in several projects at one time. Although the user might be working on one project, he or she might be interested in knowing about things happening on other projects. When something important happens in one of the other projects in the background of the project space, the user may be alerted to this fact. For example, the link 1005 to the other project may flash briefly on screen to catch the user's attention, then a pop-up may inform the user about what has happened.
- the links to other projects also provides a quick way for users to switch between projects (i.e., to exchange which project is in the foreground). Rather than closing out the currently open project and then finding and opening another project, the user may simply select the link to the other project. This one act simultaneously moves the current project into the background, and brings the selected project to the foreground.
- links 340 depend on the individual team member viewing the project space. Since each team member sees links to other projects of which they are members, and not other projects, each team member sees different links 340 , even within the project space.
- Link 1010 identifies the open project.
- Links 1005 and 1015 identify background projects.
- Link 1020 is currently unassigned. A person skilled in the art will recognize that there may be fewer or more than four links, and that they may be used, left blank, hidden, etc. as desired by the user.
- the meeting room shown in FIGS. 11A-11E acts as a place where documents in active use are stored.
- the team members, all of whom have access to the meeting room, may all access and change the documents in the meeting room at any time.
- Documents in the meeting room are persistent: that is, as users enter and leave the meeting room the documents remain, capturing work as it progresses.
- the meeting room may play back changes as a document progressed from an earlier state to the current state.
- This playback may show not only the actual changes made to the document (such as insertions and deletions of text, insertions and deletions of graphics, and annotations), but also which user was responsible for each change, and from which locations and at what times the changes were made.
- This playback enables users to see the complete progression of the document, and gives them some feel for what the other team members are thinking, since the changes may be traced back to the individual users that made the changes.
- a user may press one of buttons 1105 to move forward or backward through time in showing changes in the meeting room.
- the meeting room shows only document 1110 .
- the first change (in FIG. 11B ) is that team member Alice added picture 1115 to document 1110 .
- Information about the change such as the name of the user and the date and time of the change, are shown in information box 1120 .
- the user's avatar 1125 may also flash, to give the user a graphical indication of who was responsible for the change.
- FIG. 11C Charles Cooper moves picture 1115 to the other side of the page.
- Information box 1130 shows the date and time of the change (which may be local to the viewing user), and avatar 1135 flashes.
- FIG. 11D Elizabeth Edwards drops note 120 onto the document. The date and time of the change are shown in information box 1140 , and avatar 1145 flashes.
- FIG. 11E Alice updates responds with note 1150 , and adds another note 1155 .
- Information box 1160 indicates the date and time, an avatar 1125 flashes.
- Another feature of the meeting room is the ability to post “action required” messages to other users. For example, a user may drag a document from the meeting room onto a user's avatar. This lets the selected user know that they need to act on the document. This information may be sent to the user immediately (if the user is currently using the system), or may be saved until the user next accesses the system (as a log-in message). (Dragging of a document onto the avatar posts an “action required” message using object-oriented technology, as described below.)
- dragging and dropping documents may be generalized beyond the use described above within the meeting room.
- a user may create a document on his or her personal computer, and drag that document into the meeting room. This adds the document to the data repository and places the document in the meeting room, so that other team members may view the document and update it, if desired.
- the meeting room provides for the possibility of asynchronous meetings.
- team members may be scattered all around the world. Scheduling a meeting at a time that is convenient to some users may be inconvenient to other users. Instead of scheduling synchronous meetings (that is, meetings that all team members attend), the meeting room supports the possibility of asynchronous meetings. Users that may attend the meeting at its scheduled time do so. Other users attend at a time that is convenient to them, even if not coincident in time with other users. The meeting is not closed until all users have made their contributions to the meeting.
- a meeting may be scheduled for 9:00 AM-10:00 AM PDT. All users that are available attend the meeting via the meeting room at that time. The meeting room captures the various contributions of the available team members. Then, team members in other time zones, that were not able to attend the meeting at its scheduled time, review the comments and contributions of the attendees and add their own thoughts. Eventually, all team members will have made their contributions to the meeting, at which time the meeting may be closed.
- the personal workspace 215 is similar to the project space, including a similar feature set. The difference is that, whereas the project space presents information about a project (and all of the project's team members), the personal workspace presents information about the user, across all of his or her projects. For example, the avatars 305 shown might identify other users with whom the user has personal relationships.
- the deliverables drop 1205 shows all deliverables for which the user has responsibility.
- the individual schedule 1210 shows the schedule for the user across all of his or her projects. Rolling-up the schedule shows a timeline of the user's planned activities across all projects.
- the data repository 1215 provides access to all files on which the user works.
- the meeting list 1220 shows all meetings (across all projects) of which the user is a participant. A person skilled in the art will recognize other ways in which the personal workspace differs from the project space.
- FIG. 13 the personal workspace deliverables drop 1205 in greater detail. Similar to the project deliverables drop discussed above with reference to FIG. 5 , the personal deliverables drop 1205 includes places for deliverables for various projects for which the team member is responsible. Thus, documents 1305 and 1310 have been delivered, document 1315 (with a template indicating document 1315 is a Microsoft Word document) is overdue, and document 1320 has not yet come due.
- FIG. 14A shows the user's schedule 1210 split across three projects 1405 .
- color or shading may be used to represent different activities.
- the shading for block 1410 may indicate a scheduled meeting
- the shading for block 1415 may indicate work (other than a meeting)
- the shading for block 1420 may indicate a period of time spent traveling.
- Merge button 1425 causes schedule 1210 to roll up. After being selected, the schedule looks as shown in FIG. 14B . The three schedules are combined into a single schedule, showing the user's complete schedule in a consolidated view. The user may also select unmerge button 1430 , to revert back to the original three-project schedule view.
- the various components of the project space and personal space are implemented using an object-oriented structure. That is, the components displayed in the project space are instances of objects. (Although every effort has been made to carefully distinguish between objects and object instances in this discussion, it should be clear from context which term is intended, in case the word “instance” is unintentionally omitted.)
- a user object which is defined to represent the avatar.
- an instance of the user object is created. The instance is then populated with the appropriate data for the user, and the instance is added to the project space.
- objects include properties and methods.
- Properties are fields that store data.
- Methods are functions and/or procedures that operate on the properties of the object instance. By virtue of their invocation, a method implicitly operates on the properties of the instance to which the invoked method is attached.
- the project space is constructed to allow users to connect any two (or conceivably more) object instances, causing the instances to interact. This connection is typically accomplished by dragging the instance of one object onto the instance of the second object. For example, the user may drag an avatar instance onto the e-mail tool instance. Behind the scenes, what happens is that a method associated with the e-mail tool instance is invoked, and receives as a parameter the instance of the avatar. By identifying the avatar that is passed as a parameter to the method of the e-mail tool instance, the project space determines that the user desired to send an e-mail message to the selected user. The invoked method then creates a new e-mail message, and fills the new e-mail message with data from the avatar instance. The project space then displays the new e-mail message, addressed it to the selected user.
- each object has properties. All values that may be easily predicted may be drawn directly from either (or both) of the selected objects, leaving the user to complete only the values that may not be predicted. For example, suppose the user selects to create a new meeting and drags that new meeting onto the team schedule. The project space may infer that the user wants to schedule a new team meeting. The meeting instance that is created may then include all team members, may access the individual schedules of all of the team members, and may present to the user a list, either textually or (preferably) graphically, of all available time slots for the meeting. All the user has to do is include a topic for the meeting, select an available time slot, and indicate the meeting's expected duration. Once done, the meeting is automatically added to the team schedule, and to the individual schedules of all team members.
- the integration of the objects is part of the design of the architecture of the embodiments of the invention. Any objects added to the system have to integrate with all the other objects. By being tightly integrated, the objects are all capable of interacting with each other, simplifying user operation.
- integration may extend to software written by others, and software written for other hardware platforms. So long as the software being used is designed to integrate with other software (which means that interfaces and messages all conform to an agreed-upon format/design), integration is not limited to any particular software vendor or hardware architecture.
- the user wants to add a non-team member to the just-scheduled meeting.
- the user may locate the non-team member's avatar (perhaps using the search tool), and drags the avatar instance onto the newly defined meeting. This automatically adds the non-team member as a participant in the meeting, and incorporates the non-team member's schedule information to the meeting, so that the meeting may be scheduled at a time convenient to all participants.
- connecting object instances does not have to be limited to one-way connections. That is, instead of the user dragging an avatar instance to the e-mail tool, the user might drag the e-mail tool onto the avatar instance. Reversing this connection accomplishes the same thing: it generates an e-mail to the other user. And the user may drag multiple object instances to another object instance, to generalize the concept. For example, the user might select and drag several avatar instances to the e-mail tool (to send an e-mail message to all of the selected users) or to the meeting scheduling tool (to schedule a meeting with a subset of the team members). But if the order of selection of object instances may have a different result, then the results of the commands would not be symmetric.
- Another feature of the project space is the ability to propagate changes between projects.
- Project 1 and project 2 Project 1 involves two users: Alice and Brian.
- Project 2 also involves two users: Brian and Charles. (Note that Brian is common to both projects).
- schedule 1505 is for project 1
- schedule 1510 is for project 2 .
- all three users are at the same location, so that there are no concerns about differing time zones.
- Alice and Charles are each trying to schedule project meetings (meetings requiring the attendance of all team members) for projects 1 and 2 , respectively.
- the project space examines the change, and determines what the change impacts.
- the change affects user schedules, but a person skilled in the art will recognize that other types of changes are possible.
- a user's project space may alert the user when actions occur on background projects: in this case, the change is the action in the background project.
- prioritizer 245 is shown taking information 1605 and 1610 about the conflict from each of the projects, and determining the priority of project 2 's meeting 1515 to be lower than that of project l′s meeting 1535 .
- Prioritizer 245 then changes the meeting time for project 2 's meeting 1515 to one for which both participants are available but does not conflict with project's meeting 1535 , as shown in rescheduled meetings 1615 and 1620 .
- Or Charles (the user who scheduled the meeting in the first place) may be notified that Brian is no longer available at the scheduled time, and that Charles has to reschedule the meeting. (Of course, if project 1 has higher priority than project 2 , the project space would probably not reschedule the meeting for project 2 automatically, but would force Charles to take some action to resolve the conflict: for example, to find another time for the meeting.)
- a user receives an e-mail, inviting him to join a project. If the user drags the e-mail into his personal workspace (discussed below), several things happen automatically. First, the user is added as a member of the team. This means that his schedule is added to the project space, the project is added to his personal workspace, and his avatar is added to the project space of other users, among other things. Any currently scheduled meetings are added to the user's schedule and any conflicts are highlighted (and potentially resolved automatically). Documents are added to his workspace, so that the user may review documents relating to the project. A person skilled in the art will recognize other consequences of the user accepting membership in the project.
- One feature of described embodiments of the invention is that the project does not need to include a lead member.
- Embodiments of the invention encourage self-motivation. As team members see what other users have accomplished, the members are encouraged to pull their weight in the team. One user completing his or her work on time encourages other users to do the same.
- FIGS. 17A-17B show a flowchart of the procedure for propagating changes across projects in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- the system receives a change to a project.
- the system determines whether there are any members of the changed project that have not yet been considered. If there are, then at block 1715 , the system determines a user who is member of the project.
- the system determines other projects of which that user is a member.
- the system decides whether or not the change affects any of the other projects. If so, then at block 1730 , the change is propagated to the affected projects. At block 1735 , the system determines whether the propagated change creates a conflict between the changed project and any of the affected projects. If so, then at block 1740 , the system determines a relative priority between the projects, and at block 1745 , the system resolves the conflict using the relative priorities.
- blocks 1740 and 1745 represent but one way of resolving conflicts, and that other techniques (such as those described above with reference to FIGS. 15C and 16 ) may be used to resolve conflicts.
- FIGS. 18A-18B show a flowchart of the procedure for rolling up two or more schedules in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- the system identifies two or more user/project combinations.
- the system checks whether there are any items to roll up in a combined schedule.
- the system If there are any items to display in a combined schedule, then at block 1815 ( FIG. 18B ) the system generates a combined schedule. At block 1820 , the system identifies an item from one of the user/project combinations. At block 1825 , the system inserts the item into the combined schedule. At block 1830 , the system checks to see if there are any remaining items to roll up. If so, then processing returns to block 1820 . Otherwise, at block 1835 , the system displays the combined schedule. (As indicated by dashed arrow 1840 , block 1835 may be omitted.)
- FIG. 19 shows a flowchart of the procedure for using an architecture in the systems of FIGS. 1A-1C , according to an embodiment of the invention.
- a project is brought to the foreground.
- the system displays instances of objects, the instances representing various components of the project space.
- the system displays a link to another project.
- the system receives a notice about an action in the other project.
- the system displays information about the action in the other project to the user.
- the system flashes the link to the other project, as an alert to the user.
- the system permits the user to use an instance of one object with a method of another object, perhaps by dragging the first object onto the other object (block 1940 ).
- blocks 1915 - 1935 may be omitted, if desired.
- blocks 1935 - 1940 may be repeated, as often as desired.
- the machine includes a system bus to which is attached processors, memory, e.g., random access memory (RAM), read-only memory (ROM), or other state preserving medium, storage devices, a video interface, and input/output interface ports.
- the machine may be controlled, at least in part, by input from conventional input devices, such as keyboards, mice, etc., as well as by directives received from another machine, interaction with a virtual reality (VR) environment, biometric feedback, or other input signal.
- VR virtual reality
- the term “machine” is intended to broadly encompass a single machine, or a system of communicatively coupled machines or devices operating together. Exemplary machines include computing devices such as personal computers, workstations, servers, portable computers, handheld devices, telephones, tablets, etc., as well as transportation devices, such as private or public transportation, e.g., automobiles, trains, cabs, etc.
- the machine may include embedded controllers, such as programmable or non-programmable logic devices or arrays, Application Specific Integrated Circuits, embedded computers, smart cards, and the like.
- the machine may utilize one or more connections to one or more remote machines, such as through a network interface, modem, or other communicative coupling.
- Machines may be interconnected by way of a physical and/or logical network, such as an intranet, the Internet, local area networks, wide area networks, etc.
- network communication may utilize various wired and/or wireless short range or long range carriers and protocols, including radio frequency (RF), satellite, microwave, Institute of Electrical and Electronics Engineers (IEEE)802.11, Bluetooth, optical, infrared, cable, laser, etc.
- RF radio frequency
- IEEE Institute of Electrical and Electronics Engineers
- Associated data may be stored in, for example, the volatile and/or non-volatile memory, e.g., RAM, ROM, etc., or in other storage devices and their associated storage media, including hard-drives, floppy-disks, optical storage, tapes, flash memory, memory sticks, digital video disks, biological storage, etc.
- Associated data may be delivered over transmission environments, including the physical and/or logical network, in the form of packets, serial data, parallel data, propagated signals, etc., and may be used in a compressed or encrypted format.
- Associated data may be used in a distributed environment, and stored locally and/or remotely for machine access.
Abstract
A collaborate workspace offers a set of integrated components. Within a project, users may view avatars representing other team members, view the current schedule, add or change meetings, update documents, complete deliverables, and interact with team members around the world. Other projects are shown in the background, enabling users to easily and quickly switch between projects and be informed about actions occurring in the background tasks.
Description
- This application is a divisional of co-pending U.S. patent application Ser. No. 10/753,217, filed Dec. 23, 2003, now allowed, which claims the benefit of U.S. Provisional Patent Application Ser. No. 60/480,895, filed Jun. 23, 2003.
- This invention pertains to collaboration, and more particularly to providing an integrated collaboration workspace for teams of users.
- In today's global economy, teams of users may be distributed around the world. For example, one team member might be located in Oregon, another in Australia, a third in Israel, and a fourth in Russia. That team members may be scattered around the world introduces new complications into coordinating team efforts.
- The most obvious complication is that team members may not sit down together in a single room without extensive traveling. Although theoretically possible for occasional use, arranging for all team members to travel to a single location to meet is often expensive, in money and especially in time. The cost of arranging travel for each team member may be prohibitive, and the time needed for travel and to allow the team members to acclimate to the local time zone may often run into days. For projects with relatively short deadlines, the time cost involved in travel may often be the more prohibitive factor against travel.
- But because the earth is divided into multiple time zones, coordinating video- or tele-conferencing may be just as complex. For example, there is a 10-hour time difference between the Oregon and Israel. When it is 9:00 AM in Oregon, it is 7:00 PM in Israel. Factor in team members in other parts of the world, and it may be impossible to find a time to hold the meeting that is convenient to everyone's work schedule. As a result, some participants are forced to conference in to meetings at very awkward times.
- The physical separation of team members has other affects beyond the inconvenience of scheduling meetings. This is isolating: limiting interaction to e-mail and telephone conversations does not let team members get to know one another. This lack of knowledge about other team members may have an impact on individual and team performance, which costs money. It is important the team members know one another: for example, their strengths and weaknesses, their work habits, and their culture.
- Further complicating everything is that users are often working on more than one project at a time. Studies have shown that, on average, users participate in 3-10 projects at one time. Even if it is possible for a user to interact with team members of one project, such interaction comes at the expense of interaction with team members on other projects.
- Some tools exist to attempt to address the problem of dispersed team members. For example, Instant messaging tools provide ways to quickly communicate one user to another. Microsoft® offers several software products, including SharePoint™, Office, and NetMeeting®. SharePoint is a document management system. It allows members of a team to share documents and other information. But SharePoint provides no way to connect multiple projects. For example, if a user wants to share a document across three different projects, the user has to connect to each project individually and add the documents to the project. In addition, the copies of the documents are not connected. SharePoint is also a hierarchical software package: using SharePoint requires working from the “top” of the software down to the desired functionality. Microsoft Office is a set of software programs, including Word, Excel, and Outlook® among others, for performing various tasks. And Microsoft NetMeeting® is software that provides for network conferencing. (Microsoft, SharePoint, Outlook, and NetMeeting are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries.)
- Groove Networks®, Inc. offers software that allows real-time peer-to-peer interaction. Groove Networks software allows users to set up groups, but is otherwise outside not workflow oriented. Groove Networks software provides no interoperability, and no structure.
- Documentum, Inc. offers eRoom, which is a document management system, but it is little more than a document drop. eRoom does not provide for teamwork or multiple teams, and any functionality other than document management is an add-on to the basic eRoom software. (Documentum and eRoom are either trademarks or registered trademarks of Documentum, Inc.)
- Finally, ThinkDesk™ by Outhink, Inc., is a workflow tool. It acknowledges that users are sometimes involved in multiple projects simultaneously, and offers a drag-and-drop interface. But it does not allow users to see all of their projects at once. It does not allow users to be able to locate other team members, easily schedule and manage meetings, or in general engage in activities that involve the entire team.
- As may be seen, all of these solutions are flawed. Some, like instant messaging, Microsoft NetMeeting, and the software offered by Groove Networks, Inc., are dedicated to individual tasks, and do not address the problem as a whole, or are entirely outside the space of the problem. Others, like Microsoft SharePoint, Documentum eRoom, and Outhink ThinkDesk, are designed around a single core strength of the business offering the product. The other functionalities have poor designs and do not integrate well with the core product. Microsoft Office includes several different software programs, all of which were designed and implemented separately, without any concern for integration. Although offered now as a suite and capable of exchanging information between the individual software programs, the individual software programs were not originally designed to work together. Offering the individual software programs as a suite required creating “glue code” to allow them to work together. Except for Outhink ThinkDesk, none of these solutions acknowledges that users may be working on multiple projects simultaneously. And even Outhink ThinkDesk, while acknowledging the possibility of multiple projects, does not let users work in all projects simultaneously.
- As an example of the lack of integration, consider the situation where a user receives an e-mail message about a meeting. In Microsoft Outlook, if the user drags the e-mail message onto the calendar tool, Microsoft Outlook will obligingly open a new appointment, for the meeting. But no fields of the new appointment are filled in: the user has to manually search the message to find the relevant information and manually schedule the meeting.
- In fairness to Microsoft Outlook, the program does offer a way to e-mail an appointment so that, upon acceptance by the recipient, the appointment is completely scheduled in the recipient's calendar. But to send the appointment requires digging through menus within the program in a non-intuitive manner for a rather buried feature.
- In addition, when a user is working with one tool, it completely dominates the user's attention. The user has no easy way to access other tools without completely diverting attention away from the dominant tool. The user also has no way to find out about actions occurring on other projects.
- These products all assume that a user works on only one project at a time. The products offer no easy way to switch between projects, or even recognize that a user might be involved in more than one project.
- Finally, these products, to the limited extent that they offer any sort of integration, are limited to integration with their own tools. There is no way for these products to interact properly with software written by others, or running on a different hardware architecture.
-
FIGS. 1A-1C show systems for using in a collaborative workspace, according to embodiments of the invention. -
FIG. 2 shows software used to implement the collaborative workspace in the system ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIG. 3 shows a collaborative workspace as used in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIG. 4 shows details about the avatars of the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 5 shows details of a deliverable list for a project in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 6 shows details of a project schedule in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 7 shows details of a data repository in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 8 shows details of a tool palette in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 9 shows details of a meeting list in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIG. 10 shows details of links to other projects in the collaborative workspace ofFIG. 3 , according to an embodiment of the invention. -
FIGS. 11A-11E show a meeting room as used in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIG. 12 shows a personal workspace as used in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIG. 13 shows details of a personal deliverable list in the personal workspace ofFIG. 12 , according to an embodiment of the invention. -
FIG. 14A shows details of a personal schedule in the personal workspace ofFIG. 12 , according to an embodiment of the invention. -
FIG. 14B shows the personal schedule ofFIG. 14A rolled up, according to an embodiment of the invention. -
FIGS. 15A-15C show an embodiment of the invention as used in the systems ofFIGS. 1A-1C propagating changes across projects and creating conflicts, according to an embodiment of the invention. -
FIG. 16 shows an embodiment of the invention as used in the systems ofFIGS. 1A-1C resolving conflicts by prioritization, according to an embodiment of the invention. -
FIGS. 17A-17B show a flowchart of the procedure for propagating changes across projects in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIGS. 18A-18B show a flowchart of the procedure for rolling up two or more schedules in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. -
FIG. 19 shows a flowchart of the procedure for using an architecture in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. - The hardware and software used to implement an embodiment of the invention may operate in accord with a client-server model. The client hardware may be any variety of computer located convenient to the user. For example, the client may be a desktop computer, a laptop computer, a personal digital assistant (PDA), or even a terminal (with no local computing ability). The server hardware may be any variety of computer as well, although if the client is a terminal, the server would provide the processing power for the terminal.
- The software on the client and server implement the embodiments of the invention described above. The server stores information about the project (and, by extension, about other projects, possibly including projects to which the user is not a member). Projects are also sometimes called collaborative workspaces. There may also be several servers, each storing information about different projects, and as will be appreciated by one skilled in the art, the servers may be used for other purposes as well. Additional servers may also act as backup servers to the primary, to ensure redundant copies of project information in case the primary server fails or to provide additional processing power in case the primary server is overloaded. If there are multiple servers, each managing different projects, then typically there is a “telephone directory” somewhere, identifying which project is stored on which server. This enables the client to communicate with each server about projects stored on that server.
- It will be appreciated that various technologies may be used to implement the “telephone directory” or various embodiments of the invention. For example, “web services” type technology may be utilized to coordinate client and server participation in a project. “Web services,” as the phase is used herein, describes a standardized way of describing, discovering, and integrating network applications, services and resources using open standards, such as World Wide Web Consortium (W3C) and Internet Engineering Task Force (IETF) standards, including XML (Extensible Markup Language), SOAP (Simple Object Access Protocol), WSDL (Web Services Description Language), UDDI, UPnP (Universal Plug and Play), etc., over a network, such as the Internet or other network. Accordingly, these or other technologies may be used to describe and/or discover various components that may comprise one or more embodiments of the invention.
- The server stores any information that should be centralized. For example, users may be members of multiple projects, and so the user's schedule may affect multiple projects. Thus, the user's schedule should be centralized. Similarly, documents that any team member may edit are stored on the server. On the other hand, data that does not change or that is pertinent to a single user only may be stored on the client, although it will be appreciated that the server may be used to cache or backup a client's data. A person skilled in the art will recognize which data typically are stored on the server and which are stored on the client. The client and server communicate as needed to keep the user up-to-date on projects.
- The client stores the software to carry out any commands requested by the user (although carrying out the commands may involve retrieving data from the server). The client sends messages to the server to update data on the server. For example, if the user blocks out some time in his or her schedule, the client communicates this information to the server, so that the server may propagate this change to other projects and users as needed. Similarly, the server communicates with the client as needed. For example, if a change is to be propagated to the user, the server notifies the client about the change, so that the client may notify the user.
- The client and server are connected via some communications mechanism. Often, the communications mechanism is a network, although a person skilled in the art will recognize that the client and server may communicate in other ways: for example, by being directly connected in some manner. The network may be any variety of network: for example, Ethernet (either Megabit or Gigabit Ethernet) or a wireless network utilizing Bluetooth or any of the IEEE 802.11a/b/g standards, among others. (The Bluetooth standard may be found at “http:##www.bluetooth.com#dev#specifications.asp,” and the IEEE 802.11a/b/g standards may be found online at “http:##standards.ieee.org#catalog#olis#lanman.html” (to avoid inadvertent hyperlinks, forward slashes (“/”) in the preceding uniform resource locator (URL) have been replaced with pound signs (“#”)).
- In another embodiment of the invention, the hardware and software used to implement embodiments of the invention may be offer a peer-to-peer communication model. In such a model, all information typically is distributed: there is no centralized location where data is stored. The computers are networked in any manner desired, similar to the network described above for the client-server model. In such an embodiment of the invention, the client computers communicate with each other directly, requesting data as needed. But a person skilled in the art will recognize that the peer-to-peer network may include a server, instead of being limited to client-client communication. The server may act as a central hub through which communications between the clients pass, or it may act as a central repository, providing a centralized backup of data otherwise stored on the clients. A person skilled in the art will recognize other ways in which a server may be used in a peer-to-peer network.
- For example, if a user wants to schedule a meeting, his or her computer sends a request to all other computers in the network, requesting the schedules of users. Once all schedules are received, the user's computer then shows everyone's schedules, allowing the user to schedule the meeting at a time convenient to everyone. Once scheduled, notice of the meeting is forwarded to all the other computers, so that the other team members are notified about the meeting.
- In a similar manner, information may be sent without warning to a computer in the peer-to-peer network. For example, suppose a user has completed an action in a project. That user's computer sends notice that the action was completed to the other computers in the peer-to-peer network. Other team members on that project may then be notified that the action occurred.
-
FIGS. 1A-1C show three computers connected according to embodiments of the invention. InFIG. 1A ,computers FIG. 1A may be representative of a peer-to-peer configuration where the computers are connected by a network. In contrast,FIG. 1B showscomputers network 120.FIG. 1B may be representative of a peer-to-peer configuration using a network. Finally, inFIG. 1C ,server 125 acts as a centralized location through which the collaborative workspace operates. A person skilled in the art will recognize thatserver 125 may be connected to network 120 ofFIG. 1B , that there may be fewer or more than three computers, and other ways in whichcomputers -
FIG. 2 shows software used to implement the collaborative workspace in the system ofFIGS. 1A-1C , according to an embodiment of the invention. InFIG. 2 ,server 125 is shown, suggesting the client-server model ofFIG. 1C , but a person skilled in the art will recognize that any ofcomputers server 125 in other embodiments. -
Server 125 is shown includingproject workspaces Project workspaces Server 125 also includespersonal workspaces -
Server 125 includesschedule combiner 225, which is responsible for rolling schedules together. As will be discussed further with reference toFIGS. 14A-14B below, multiple schedules may be rolled together to present a combined view to a user.Server 125 also includespropagation arrangement 230, which is responsible for propagating changes across projects.Propagation arrangement 230 includesdeterminer 235, which determines user/project combinations and whether any conflicts exist,schedule changer 240, which changes schedules as needed when conflicts arise, andprioritizer 245, which determines relative priority between two projects to resolve conflicts. - An embodiment of the invention is a collaborative workspace in which individual users may keep track of all of the projects on which they are working, and in which individual users may see the progress of the project as a whole. The embodiments of the invention enable team members to be easily found and to become organized. Work on the project is coordinated from a single work environment. The collaborative workspace enables interaction with remote colleagues without necessitating communicating at awkward times. Team members may easily determine who is currently available, what the schedules of the individual team members look like, and who has done what on the project.
- An embodiment of the invention includes
project space 205, as shown inFIG. 3 .Project space 205 provides a mechanism by which the members of a single project may (for example, visually) track progress in working on the project, keep track of the other team members, and coordinate work and communication, among other functions. Among other elements, the project space may includeavatars 305 of individual users, a place to dropdeliverables 310, ateam schedule 315, adata repository 320, a link to ameeting room 325, and atool set 330.FIG. 3 also showsmeeting list 335,links 340 to other projects, link 345 to a user's personal workspace, and link 350 to the project space. Each of these elements is discussed in turn below. -
Avatars 305, shown in greater detail inFIG. 4 , represent the individual members (sometimes called “team members”) of the project. For example,avatar 405 represents Alice Abrams, whereasavatar 410 represents Brian Barker. The avatars let individual team members know about the other members of the team. The avatars are customizable, so that each team member may include the information he or she wants to include. Typically, at a minimum an avatar includes a picture of the team member, information about the team member's location, and the local day and time at the team member's location. For example,avatar 405 includespicture 415, and location, local day, andlocal time 420. Location, day, and time information may be useful in keeping track of schedules as the earth rotates around its axis. When it is 3:00 PM in Oregon, it is 11:00 PM in Israel. Thus, Alice knows that unless Brian is working an unusual schedule, he probably asleep at this time. - The avatars may also include any additional information the user wants to make available to team members. For example, an avatar may include a video or audio segment of the team member, so that other team members may get a better feel for whom the team member is. Or the avatar may include a link to photos from the user's most recent vacation. For example,
avatar 405 includeslink 425. - The avatar may also include a (iconic) mood indicator, letting other team members know how the team member is currently feeling. For example, if the team member is in his or her office and everything is fine, the avatar may include an icon showing a smiley face.
Mood indicator 430 shows everything is currently fine for Alice. But if the team member is sick, the avatar may include an icon showing a sad face, with a thermometer in its mouth and a hot water bag on its head. Or if the team member is currently asleep (for example, if the current local time is between 10:00 PM and 6:00 AM), the avatar may include an icon with eyes shut and “Zzz”s overhead, as shown inmood indicator 435 inavatar 410 for Brian. - Although the mood indicator may be changed by the user according to his or her current mood, the mood indicator may also be predictive. A predictive mood indicator attempts to guess at the user's current mood, without the user actually indicating the mood directly. For example, the mood indicator may predict that the user is asleep outside of normal working hours (whatever is considered “normal” for the user, given his or her current location and typical work hours, among other factors). The mood indicator may identify the user as traveling, if the user's current schedule shows him or her as traveling. The mood indicator may predict the user as being in a poor mood (or just plain angry) if the user's schedule shows him or her as having work due in a short frame of time. (The mood indicator may also show gradations of anger, depending on how much work the user has due, and how short the time frame is for completing the work.) And there are other, less scientific ways to predict mood that may be used: for example, horoscopes, biorhythms, and analysis of the language used in e-mails sent by the user.
- This information may be presented in many ways. Although
FIG. 4 shows the team member's location inavatars - Although the term “avatar” has been used above, it should be understood that the avatars used to represent users are different from the standard concept of “avatar” as used for on-line gaming. In some forms of on-line gaming, an avatar is present only when the player is connected to the game, to let others know about the player's presence. In other forms of on-line gaming, the avatar is present only when the player is absent, so that the avatar may act as an agent on behalf of the (absent) player. The two models of on-line gaming avatars do not coexist: that is, avatars are not used to both represent the player's presence and to act as an agent in the player's absence. In contrast, the avatars of an embodiment of the invention represent the user at all times, even when absent, but do not act as an agent for the user when he or she is absent.
- As documents are completed and ready to be delivered according to the project, they are placed in a deliverables drop 310, shown in
FIG. 5 . The deliverables drop includes a place for each document to be delivered according to the project.FIG. 5 shows deliverables drop 310 with five document deliverables.Documents documents document 515 is a Microsoft Word document: if any other type of document is placed in that slot, the project space may alert the user to the fact that the wrong document type was placed in deliverables drop 310. - The deliverables drop may be color-coded, to make it easy for team members to see what has been completed and what remains to be completed. For example, deliverables that have been placed in the deliverables drop 310, such as
documents FIG. 5 with a diagonal fill pattern), to indicate that the deliverables have been completed, whereas deliverables that have yet to be placed in the deliverables drop may be colored red, to indicate the need to complete the documents. Alternatively, red may be reserved for documents that are behind schedule, with some other color (or no color at all) used to indicate documents that have yet to be delivered but are not yet due. InFIG. 5 ,document 515 is behind schedule, and colored red, represented by the crosshatch fill pattern.Documents - This color-coding makes it easy for users to quickly find out the status of any deliverables. For example, suppose that one team member is responsible for preparing a requirements document for the project, but another team member is responsible for the actual development of the product. The product may not (in theory) be developed until after the requirements are determined. So, the team member responsible for development waits until he or she sees that the requirements document has been added to the deliverables drop. This lets the development team member know that the requirements are “finalized,” and that he or she may proceed with development. In addition, since presumably the development team member would have been checking the deliverables drop regularly, if the requirements document were late being added to the deliverables drop, the fact that the requirements document had been added to the deliverables drop would give the development team member incentive to begin development: he or she could delay no longer.
- The documents in the deliverables drop may also be linked. For example, suppose that the time has passed to complete the development of the product, but the requirements document remains unfinished. Since the product may not be developed (in theory) until the requirements are defined, it accomplishes little to let everyone know that the development document is overdue (except, perhaps, to further motivate the team member responsible for the requirements document). Thus, the development document, even though overdue, might not be color-coded as overdue, as it depends on the as-yet-incomplete requirements document.
- The team schedule, shown in greater detail in
FIG. 6 , as suggested by the name, provides a schedule for the team. Information in the team schedule may be organized in several different ways. The first, and most intuitive way, is to show each team member's schedule as it relates to the project. (That individual users might be involved in multiple projects, and therefore not available during times not scheduled for the project, is discussed below.) For each team member, the time(s) he or she has worked and will work on the project are shown. This information may also be marked to identify work status: that is, work that has been completed and work that is pending. Additional work status information may include work that is urgent versus work that is low-priority (or even, perhaps, optional). In addition, the work may be divided into different types of work: for example, meetings, travel, and “real” work. In a typical embodiment of the invention, color codes may be used to identify the different types of work and the status of the work, similar to the color codes used for the deliverables drop, as described above. - As an alternative, or as a supplement, to team member's schedules, the team schedule may also display the state of different work phases. For example, there may be an initial stage, a requirements analysis phase, a development phase, and a testing phase. Each phase may be assigned different time periods on the schedule, according to the projected schedule for the project. Work phase schedules, like the schedules of individual users, may be color-coded.
-
Schedule 315 ofFIG. 6 shows both of these alternatives.Phases 605 show the various phases of work, andnames 610 identifies the particular team members, along with the intervals when they are working on the project. Shading, as an alternative to color, inFIG. 6 represents different types of activities occurring inschedule 315. For example,interval 615 represents a time span spent on a particular phase of work, whereas interval 620 (with different shading) represents a period when a team member (in this case, Alice Abrams) is actually working. -
Schedule 315 also reflects action items. As discussed above with reference toFIG. 5 , color may be used to differentiate completed, overdue, and future action items. For example,action item 625 is completed,action item 630 is overdue, andaction item 635 is due in the future. - The
data repository 320, shown in detail inFIG. 7 , acts as a central location where documents may be stored when not actively needed. For example, if the project has passed the requirements analysis phase and has begun development, the requirements analysis document may be stored in thedata repository 320. Of course, if the requirements analysis needs to change to reflect a reality not anticipated before development, the document may be retrieved from thedata repository 320, edited, and then returned to thedata repository 320. (If needed, the document may also be retrieved from the deliverables drop, so that the deliverables drop includes the most current version of the document. In a typical embodiment of the invention, the document in the deliverables drop is linked to the document in thedata repository 320, so that changes made to either document are automatically reflected in the other.) Thedata repository 320 may be represented as having different “drawers,” such asdrawers - The
tool palette 330, as the name implies, is a set of tools that may be used by the team members. Shown in greater detail inFIG. 8 , the tool palette may include tool such as a chat or instant messaging tool, an e-mail tool, a search tool, a meeting scheduling tool, and a contacts list. Each of these tools acts generally as the name implies, although the search tool does more than search just documents. For example, the search tool may enable team members to search for other users (which causes the located user's avatar to appear in the project space), or to search within playbacks of document changes from the meeting room for what changes were made by particular users (which lists documents changed by the desired user). And the meeting scheduling tool lists all currently scheduled meetings, so that the user may view details about the meetings, and allows the user to schedule a new meeting. These tools may be implemented as an Application Program Interface (API), which provides users with access to the tools and allows for a way to modify the tool set (allowing for new combinations as new tools are added). - Because meetings are typically a regular occurrence, the meeting scheduling tool may include a
meeting list 335, shown inFIG. 9 . Themeeting list 335 shows all currently scheduled meetings and provides alink 905 to the meeting scheduling tool. Themeeting list 335 may be displayed in the project space as another component of the project space. Completed meetings are indicated inFIG. 9 with a check mark, and other symbols are used to represent important points. For example,document icon 910 indicates that a document is attached to the meeting,tape icon 915 indicates there is an audio presentation, andvideo icon 920 indicates there is a video presentation. Selecting these icons may open the related document, presentation, etc. - Another feature of the project space is the inclusion of links to other projects.
FIG. 10 shows more detail aboutlinks 340. Rather than limiting the user's view to the current project, the project space lets users keep an eye on other projects as well. For example, an individual user might be involved in several projects at one time. Although the user might be working on one project, he or she might be interested in knowing about things happening on other projects. When something important happens in one of the other projects in the background of the project space, the user may be alerted to this fact. For example, thelink 1005 to the other project may flash briefly on screen to catch the user's attention, then a pop-up may inform the user about what has happened. - The links to other projects also provides a quick way for users to switch between projects (i.e., to exchange which project is in the foreground). Rather than closing out the currently open project and then finding and opening another project, the user may simply select the link to the other project. This one act simultaneously moves the current project into the background, and brings the selected project to the foreground.
- Although shown in
FIG. 3 to be part of the project space, a person skilled in the art will recognize theselinks 340 depend on the individual team member viewing the project space. Since each team member sees links to other projects of which they are members, and not other projects, each team member seesdifferent links 340, even within the project space. - In
FIG. 10 , four links are shown.Link 1010 identifies the open project.Links Link 1020 is currently unassigned. A person skilled in the art will recognize that there may be fewer or more than four links, and that they may be used, left blank, hidden, etc. as desired by the user. - In contrast to the data repository, the meeting room shown in
FIGS. 11A-11E acts as a place where documents in active use are stored. The team members, all of whom have access to the meeting room, may all access and change the documents in the meeting room at any time. Documents in the meeting room are persistent: that is, as users enter and leave the meeting room the documents remain, capturing work as it progresses. - On feature of the meeting room is the presentation of all recent changes to documents. At a command, the meeting room may play back changes as a document progressed from an earlier state to the current state. This playback may show not only the actual changes made to the document (such as insertions and deletions of text, insertions and deletions of graphics, and annotations), but also which user was responsible for each change, and from which locations and at what times the changes were made. This playback enables users to see the complete progression of the document, and gives them some feel for what the other team members are thinking, since the changes may be traced back to the individual users that made the changes.
- For example, a user may press one of
buttons 1105 to move forward or backward through time in showing changes in the meeting room. At the start (inFIG. 11A ), the meeting room shows only document 1110. The first change (inFIG. 11B ) is that team member Alice addedpicture 1115 todocument 1110. Information about the change, such as the name of the user and the date and time of the change, are shown ininformation box 1120. In addition, the user'savatar 1125 may also flash, to give the user a graphical indication of who was responsible for the change. - In
FIG. 11C , Charles Cooper movespicture 1115 to the other side of the page.Information box 1130 shows the date and time of the change (which may be local to the viewing user), andavatar 1135 flashes. InFIG. 11D , Elizabeth Edwards dropsnote 120 onto the document. The date and time of the change are shown ininformation box 1140, andavatar 1145 flashes. Finally, inFIG. 11E , Alice updates responds withnote 1150, and adds anothernote 1155.Information box 1160 indicates the date and time, anavatar 1125 flashes. - Another feature of the meeting room is the ability to post “action required” messages to other users. For example, a user may drag a document from the meeting room onto a user's avatar. This lets the selected user know that they need to act on the document. This information may be sent to the user immediately (if the user is currently using the system), or may be saved until the user next accesses the system (as a log-in message). (Dragging of a document onto the avatar posts an “action required” message using object-oriented technology, as described below.)
- As should be apparent to one skilled in the art, the idea of dragging and dropping documents may be generalized beyond the use described above within the meeting room. For example, a user may create a document on his or her personal computer, and drag that document into the meeting room. This adds the document to the data repository and places the document in the meeting room, so that other team members may view the document and update it, if desired.
- The meeting room provides for the possibility of asynchronous meetings. As discussed earlier, team members may be scattered all around the world. Scheduling a meeting at a time that is convenient to some users may be inconvenient to other users. Instead of scheduling synchronous meetings (that is, meetings that all team members attend), the meeting room supports the possibility of asynchronous meetings. Users that may attend the meeting at its scheduled time do so. Other users attend at a time that is convenient to them, even if not coincident in time with other users. The meeting is not closed until all users have made their contributions to the meeting.
- As an example, a meeting may be scheduled for 9:00 AM-10:00 AM PDT. All users that are available attend the meeting via the meeting room at that time. The meeting room captures the various contributions of the available team members. Then, team members in other time zones, that were not able to attend the meeting at its scheduled time, review the comments and contributions of the attendees and add their own thoughts. Eventually, all team members will have made their contributions to the meeting, at which time the meeting may be closed.
- Typically, the team members that are unable to “attend” the meeting at its scheduled time do so at their earliest opportunity. This means that meetings may be closed after approximately 24 hours under typical circumstances. But under unusual circumstances (e.g., meetings on Friday, or before holidays observed by some team member), meetings may be kept open for longer, until all team members have had a chance to contribute.
- Another embodiment of the invention is the personal workspace, shown in
FIG. 12 . Thepersonal workspace 215 is similar to the project space, including a similar feature set. The difference is that, whereas the project space presents information about a project (and all of the project's team members), the personal workspace presents information about the user, across all of his or her projects. For example, theavatars 305 shown might identify other users with whom the user has personal relationships. The deliverables drop 1205 shows all deliverables for which the user has responsibility. Theindividual schedule 1210 shows the schedule for the user across all of his or her projects. Rolling-up the schedule shows a timeline of the user's planned activities across all projects. Thedata repository 1215 provides access to all files on which the user works. Themeeting list 1220 shows all meetings (across all projects) of which the user is a participant. A person skilled in the art will recognize other ways in which the personal workspace differs from the project space. -
FIG. 13 the personal workspace deliverables drop 1205 in greater detail. Similar to the project deliverables drop discussed above with reference toFIG. 5 , the personal deliverables drop 1205 includes places for deliverables for various projects for which the team member is responsible. Thus,documents template indicating document 1315 is a Microsoft Word document) is overdue, anddocument 1320 has not yet come due. -
FIG. 14A shows the user'sschedule 1210 split across threeprojects 1405. As with the project schedule discussed above with reference toFIG. 6 , color or shading may be used to represent different activities. For example, the shading forblock 1410 may indicate a scheduled meeting, the shading forblock 1415 may indicate work (other than a meeting), and the shading forblock 1420 may indicate a period of time spent traveling. -
Merge button 1425 causesschedule 1210 to roll up. After being selected, the schedule looks as shown inFIG. 14B . The three schedules are combined into a single schedule, showing the user's complete schedule in a consolidated view. The user may also select unmerge button 1430, to revert back to the original three-project schedule view. - In an embodiment of the invention, the various components of the project space and personal space are implemented using an object-oriented structure. That is, the components displayed in the project space are instances of objects. (Although every effort has been made to carefully distinguish between objects and object instances in this discussion, it should be clear from context which term is intended, in case the word “instance” is unintentionally omitted.) For example, there is a user object, which is defined to represent the avatar. When a particular user is to be displayed in the project space, an instance of the user object is created. The instance is then populated with the appropriate data for the user, and the instance is added to the project space.
- One reason for using objects is that objects include properties and methods. Properties are fields that store data. Methods are functions and/or procedures that operate on the properties of the object instance. By virtue of their invocation, a method implicitly operates on the properties of the instance to which the invoked method is attached.
- The project space is constructed to allow users to connect any two (or conceivably more) object instances, causing the instances to interact. This connection is typically accomplished by dragging the instance of one object onto the instance of the second object. For example, the user may drag an avatar instance onto the e-mail tool instance. Behind the scenes, what happens is that a method associated with the e-mail tool instance is invoked, and receives as a parameter the instance of the avatar. By identifying the avatar that is passed as a parameter to the method of the e-mail tool instance, the project space determines that the user desired to send an e-mail message to the selected user. The invoked method then creates a new e-mail message, and fills the new e-mail message with data from the avatar instance. The project space then displays the new e-mail message, addressed it to the selected user.
- To achieve this operation requires the embodiment of the invention be tightly integrated. As indicated above, each object has properties. All values that may be easily predicted may be drawn directly from either (or both) of the selected objects, leaving the user to complete only the values that may not be predicted. For example, suppose the user selects to create a new meeting and drags that new meeting onto the team schedule. The project space may infer that the user wants to schedule a new team meeting. The meeting instance that is created may then include all team members, may access the individual schedules of all of the team members, and may present to the user a list, either textually or (preferably) graphically, of all available time slots for the meeting. All the user has to do is include a topic for the meeting, select an available time slot, and indicate the meeting's expected duration. Once done, the meeting is automatically added to the team schedule, and to the individual schedules of all team members.
- The integration of the objects is part of the design of the architecture of the embodiments of the invention. Any objects added to the system have to integrate with all the other objects. By being tightly integrated, the objects are all capable of interacting with each other, simplifying user operation.
- In addition, the integration may extend to software written by others, and software written for other hardware platforms. So long as the software being used is designed to integrate with other software (which means that interfaces and messages all conform to an agreed-upon format/design), integration is not limited to any particular software vendor or hardware architecture.
- As a further example, suppose that the user wants to add a non-team member to the just-scheduled meeting. The user may locate the non-team member's avatar (perhaps using the search tool), and drags the avatar instance onto the newly defined meeting. This automatically adds the non-team member as a participant in the meeting, and incorporates the non-team member's schedule information to the meeting, so that the meeting may be scheduled at a time convenient to all participants.
- A person skilled in the art will recognize that connecting object instances does not have to be limited to one-way connections. That is, instead of the user dragging an avatar instance to the e-mail tool, the user might drag the e-mail tool onto the avatar instance. Reversing this connection accomplishes the same thing: it generates an e-mail to the other user. And the user may drag multiple object instances to another object instance, to generalize the concept. For example, the user might select and drag several avatar instances to the e-mail tool (to send an e-mail message to all of the selected users) or to the meeting scheduling tool (to schedule a meeting with a subset of the team members). But if the order of selection of object instances may have a different result, then the results of the commands would not be symmetric.
- Another feature of the project space is the ability to propagate changes between projects. Consider the situation where there are two projects:
project 1 andproject 2.Project 1 involves two users: Alice and Brian.Project 2 also involves two users: Brian and Charles. (Note that Brian is common to both projects). This situation is shown inFIG. 15A :schedule 1505 is forproject 1, andschedule 1510 is forproject 2. Assume that all three users are at the same location, so that there are no concerns about differing time zones. Coincidentally, Alice and Charles are each trying to schedule project meetings (meetings requiring the attendance of all team members) forprojects - As shown in
FIG. 15B , Charles happens to schedule ameeting 1515 forproject 2 on Mar. 18, 2003, from 4:00 PM to 6:00 PM, as shown inschedule 1520. This obviously has the first effect of changing Brian's schedule, since he is no longer available on March 18 between 4:00 PM and 6:00 PM. But in addition, once the meeting forproject 2 is scheduled, Brian is not available during that interval for the meeting forproject 1. Thus, as soon as themeeting 1515 forproject 2 is scheduled, Alice sees the change in Brian's availability on March 18, from 4:00 PM to 6:00 PM, in schedule 1525 (note the inclusion of block 1530). - To effect this propagation of changes, in one embodiment, the project space examines the change, and determines what the change impacts. In the situation described above, the change affects user schedules, but a person skilled in the art will recognize that other types of changes are possible. For example, as described above, a user's project space may alert the user when actions occur on background projects: in this case, the change is the action in the background project.
- Returning to the explanation of how changes are propagated, once the project space knows what the change impacts, the affected objects are examined. If the affected objects are linked to yet further objects, the change is reported to the other objects. In this manner, a change may ripple through all projects, affecting objects that might otherwise be considered totally disconnected from the change.
- It may happen that the change creates a conflict. For example, in
FIG. 15C , Alice schedules theproject meeting 1535 forproject 1 on March 18, from 5:00 PM to 6:00 PM, as shown inschedule 1540. Obviously, this conflicts with the meeting forproject 2. (Although Alice would know, from the team schedule, that Brian was not available at the time selected for the meeting, Alice might have selected the meeting time anyway, for lack of any non-conflicting alternative.) This conflict may be resolved in several different ways. For example, Brian may be notified of the scheduling conflict (perhaps with an urgent pop-up in his project space or personal workspace). Then, Brian may update the scheduling for the meeting forproject 1 to a different time. - Another way to resolve the conflict is to assign priorities to projects. Assuming that
project 1 has a higher priority thanproject 2, a prioritizer might automatically reschedule the meeting forproject 2 to a different time, when all participants are available. For example, inFIG. 16 ,prioritizer 245 is shown takinginformation project 2'smeeting 1515 to be lower than that of project l′smeeting 1535.Prioritizer 245 then changes the meeting time forproject 2'smeeting 1515 to one for which both participants are available but does not conflict with project'smeeting 1535, as shown in rescheduledmeetings project 1 has higher priority thanproject 2, the project space would probably not reschedule the meeting forproject 2 automatically, but would force Charles to take some action to resolve the conflict: for example, to find another time for the meeting.) - Consider yet another example of an advantage offered by the integrated environment of embodiments of the invention. A user receives an e-mail, inviting him to join a project. If the user drags the e-mail into his personal workspace (discussed below), several things happen automatically. First, the user is added as a member of the team. This means that his schedule is added to the project space, the project is added to his personal workspace, and his avatar is added to the project space of other users, among other things. Any currently scheduled meetings are added to the user's schedule and any conflicts are highlighted (and potentially resolved automatically). Documents are added to his workspace, so that the user may review documents relating to the project. A person skilled in the art will recognize other consequences of the user accepting membership in the project.
- One feature of described embodiments of the invention is that the project does not need to include a lead member. In the prior art, projects included someone who would have the responsibility of “motivating” the other team members. For this to work, either the lead member had to have more authority (either from his or her position within the business or superimposed for purposes of the lead member position). But having an individual be responsible for “encouraging” performance by others is a poor model. It is better for employees to be self-motivated. Embodiments of the invention encourage self-motivation. As team members see what other users have accomplished, the members are encouraged to pull their weight in the team. One user completing his or her work on time encourages other users to do the same.
-
FIGS. 17A-17B show a flowchart of the procedure for propagating changes across projects in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. InFIG. 17A , atblock 1705, the system receives a change to a project. Atblock 1710, the system determines whether there are any members of the changed project that have not yet been considered. If there are, then atblock 1715, the system determines a user who is member of the project. Atblock 1720, the system determines other projects of which that user is a member. - At block 1725 (
FIG. 17B ), the system decides whether or not the change affects any of the other projects. If so, then atblock 1730, the change is propagated to the affected projects. Atblock 1735, the system determines whether the propagated change creates a conflict between the changed project and any of the affected projects. If so, then atblock 1740, the system determines a relative priority between the projects, and atblock 1745, the system resolves the conflict using the relative priorities. - A person skilled in the art will recognize that
blocks FIGS. 15C and 16 ) may be used to resolve conflicts. -
FIGS. 18A-18B show a flowchart of the procedure for rolling up two or more schedules in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. InFIG. 18A , atblock 1805, the system identifies two or more user/project combinations. Atblock 1810, the system checks whether there are any items to roll up in a combined schedule. - If there are any items to display in a combined schedule, then at block 1815 (
FIG. 18B ) the system generates a combined schedule. Atblock 1820, the system identifies an item from one of the user/project combinations. Atblock 1825, the system inserts the item into the combined schedule. Atblock 1830, the system checks to see if there are any remaining items to roll up. If so, then processing returns to block 1820. Otherwise, atblock 1835, the system displays the combined schedule. (As indicated by dashedarrow 1840, block 1835 may be omitted.) -
FIG. 19 shows a flowchart of the procedure for using an architecture in the systems ofFIGS. 1A-1C , according to an embodiment of the invention. Atblock 1905, a project is brought to the foreground. (A person skilled in the art will recognize thatblock 1905 is equally applicable to the personal workspace or the meeting room as well.) Atblock 1910, the system displays instances of objects, the instances representing various components of the project space. Atblock 1915, the system displays a link to another project. Atblock 1920, the system receives a notice about an action in the other project. Atblock 1925, the system displays information about the action in the other project to the user. Atblock 1930, the system flashes the link to the other project, as an alert to the user. Atblock 1935, the system permits the user to use an instance of one object with a method of another object, perhaps by dragging the first object onto the other object (block 1940). - As shown by dashed
arrows FIG. 19 , some or all of blocks 1915-1935 may be omitted, if desired. In addition, as shown by dashedarrow 1960, blocks 1935-1940 may be repeated, as often as desired. - The following discussion is intended to provide a brief, general description of a suitable machine in which certain aspects of the invention may be implemented. Typically, the machine includes a system bus to which is attached processors, memory, e.g., random access memory (RAM), read-only memory (ROM), or other state preserving medium, storage devices, a video interface, and input/output interface ports. The machine may be controlled, at least in part, by input from conventional input devices, such as keyboards, mice, etc., as well as by directives received from another machine, interaction with a virtual reality (VR) environment, biometric feedback, or other input signal. As used herein, the term “machine” is intended to broadly encompass a single machine, or a system of communicatively coupled machines or devices operating together. Exemplary machines include computing devices such as personal computers, workstations, servers, portable computers, handheld devices, telephones, tablets, etc., as well as transportation devices, such as private or public transportation, e.g., automobiles, trains, cabs, etc.
- The machine may include embedded controllers, such as programmable or non-programmable logic devices or arrays, Application Specific Integrated Circuits, embedded computers, smart cards, and the like. The machine may utilize one or more connections to one or more remote machines, such as through a network interface, modem, or other communicative coupling. Machines may be interconnected by way of a physical and/or logical network, such as an intranet, the Internet, local area networks, wide area networks, etc. One skilled in the art will appreciated that network communication may utilize various wired and/or wireless short range or long range carriers and protocols, including radio frequency (RF), satellite, microwave, Institute of Electrical and Electronics Engineers (IEEE)802.11, Bluetooth, optical, infrared, cable, laser, etc.
- The invention may be described by reference to or in conjunction with associated data including functions, procedures, data structures, application programs, etc. which when accessed by a machine results in the machine performing tasks or defining abstract data types or low-level hardware contexts. Associated data may be stored in, for example, the volatile and/or non-volatile memory, e.g., RAM, ROM, etc., or in other storage devices and their associated storage media, including hard-drives, floppy-disks, optical storage, tapes, flash memory, memory sticks, digital video disks, biological storage, etc. Associated data may be delivered over transmission environments, including the physical and/or logical network, in the form of packets, serial data, parallel data, propagated signals, etc., and may be used in a compressed or encrypted format. Associated data may be used in a distributed environment, and stored locally and/or remotely for machine access.
- Having described and illustrated the principles of the invention with reference to illustrated embodiments, it will be recognized that the illustrated embodiments may be modified in arrangement and detail without departing from such principles. And, though the foregoing discussion has focused on particular embodiments, other configurations are contemplated. In particular, even though expressions such as “in one embodiment” or the like are used herein, these phrases are meant to generally reference embodiment possibilities, and are not intended to limit the invention to particular embodiment configurations. As used herein, these terms may reference the same or different embodiments that are combinable into other embodiments.
- Consequently, in view of the wide variety of permutations to the embodiments described herein, this detailed description and accompanying material is intended to be illustrative only, and should not be taken as limiting the scope of the invention. What is claimed as the invention, therefore, is all such modifications as may come within the scope and spirit of the following claims and equivalents thereto.
Claims (11)
1. A system for use by at least a first user, comprising:
a first project including the first user as a member;
a second project;
a change to the first project; and
propagation arrangement for propagating the change to the second project.
2. A system according to claim 1 , wherein the propagation arrangement includes:
a first determiner for determining that the first user is a member of the first project; and
a second determiner for determining if the first user is a member of the second project.
3. A system according to claim 1 , wherein:
the change includes a scheduled time during which the first user is working on the first project; and
the propagation arrangement includes a schedule changer for changing a schedule of the second project to reflect that the first user is unavailable.
4. A system according to claim 1 , wherein:
the change includes a first date for a first deliverable of the first project;
the second project includes a second date for a second deliverable of the second project; and
the propagation arrangement includes a third determiner for determining a conflict between the first date for the first deliverable and the second date for the second deliverable.
5. A system according to claim 4 , wherein:
the first project includes a first priority;
the second project includes a second priority; and
the propagation arrangement includes a prioritizer to resolve the conflict.
6. A method for propagating changes across projects, comprising:
receiving a change to a first project;
determining at least a first user who is a member of the first project;
determining at least a second project of which the first user is a member; and
determining if the change to the first project affects the second project.
7. A method according to claim 6 , further comprising, if the change to the first project affects the second project, propagating the change to the second project.
8. A method according to claim 7 , wherein propagating the change includes:
determining that a conflict exists between a schedule of the first project and a schedule of the second project;
determining a relative priority between the first project and the second project; and
resolving the conflict using the relative priority.
9. An article comprising a machine-accessible media having associated data, wherein the data, when accessed, results in a machine performing:
receiving a change to a first project;
determining at least a first user who is a member of the first project;
determining at least a second project of which the first user is a member; and
determining if the change to the first project affects the second project.
10. An article according to claim 9 , wherein the machine-accessible media further includes data, when accessed, results in the machine performing, if the change to the first project affects the second project, propagating the change to the second project.
11. An article according to claim 10 , wherein propagating the change includes:
determining that a conflict exists between a schedule of the first project and a schedule of the second project;
determining a relative priority between the first project and the second project; and
resolving the conflict using the relative priority.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US13/006,313 US20110112971A1 (en) | 2003-06-23 | 2011-01-13 | Multi-team immersive integrated collaboration workspace |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US48089503P | 2003-06-23 | 2003-06-23 | |
US10/753,217 US7904323B2 (en) | 2003-06-23 | 2003-12-23 | Multi-team immersive integrated collaboration workspace |
US13/006,313 US20110112971A1 (en) | 2003-06-23 | 2011-01-13 | Multi-team immersive integrated collaboration workspace |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/753,217 Division US7904323B2 (en) | 2003-06-23 | 2003-12-23 | Multi-team immersive integrated collaboration workspace |
Publications (1)
Publication Number | Publication Date |
---|---|
US20110112971A1 true US20110112971A1 (en) | 2011-05-12 |
Family
ID=33519525
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/753,217 Active 2029-12-30 US7904323B2 (en) | 2003-06-23 | 2003-12-23 | Multi-team immersive integrated collaboration workspace |
US13/006,313 Abandoned US20110112971A1 (en) | 2003-06-23 | 2011-01-13 | Multi-team immersive integrated collaboration workspace |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US10/753,217 Active 2029-12-30 US7904323B2 (en) | 2003-06-23 | 2003-12-23 | Multi-team immersive integrated collaboration workspace |
Country Status (1)
Country | Link |
---|---|
US (2) | US7904323B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100332980A1 (en) * | 2009-06-26 | 2010-12-30 | Xerox Corporation | Managing document interactions in collaborative document environments of virtual worlds |
US20130067549A1 (en) * | 2011-09-09 | 2013-03-14 | Microsoft Corporation | Cloud-Based Broker Service for Digital Assistants |
US20140343982A1 (en) * | 2013-05-14 | 2014-11-20 | Landmark Graphics Corporation | Methods and systems related to workflow mentoring |
US20140359529A1 (en) * | 2013-06-03 | 2014-12-04 | Microsoft Corporation | Launch Surface Control |
US20240070333A1 (en) * | 2022-08-30 | 2024-02-29 | Hexagon Technology Center Gmbh | Virtual environment for large-scale capital projects |
Families Citing this family (129)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6826729B1 (en) | 2001-06-29 | 2004-11-30 | Microsoft Corporation | Gallery user interface controls |
US9715678B2 (en) * | 2003-06-26 | 2017-07-25 | Microsoft Technology Licensing, Llc | Side-by-side shared calendars |
WO2005004014A2 (en) * | 2003-06-30 | 2005-01-13 | Sap Aktiengesellschaft | Configurable process scheduling |
US7707255B2 (en) * | 2003-07-01 | 2010-04-27 | Microsoft Corporation | Automatic grouping of electronic mail |
US8799808B2 (en) | 2003-07-01 | 2014-08-05 | Microsoft Corporation | Adaptive multi-line view user interface |
US20050015293A1 (en) * | 2003-07-16 | 2005-01-20 | International Business Machines Corporation | Collaboration enhanced workflow system |
US20050165935A1 (en) * | 2004-01-22 | 2005-07-28 | Moody Paul B. | Method and system for providing information regarding recently accessed documents of a remote user through an awareness client program |
US7991636B1 (en) * | 2004-02-11 | 2011-08-02 | Aol Inc. | Buddy list-based calendaring |
US7383308B1 (en) * | 2004-02-11 | 2008-06-03 | Aol Llc, A Delaware Limited Liability Company | Buddy list-based sharing of electronic content |
US8499248B1 (en) | 2004-04-29 | 2013-07-30 | Paul Erich Keel | Methods and apparatus for managing and exchanging information using information objects |
WO2006008847A1 (en) * | 2004-07-20 | 2006-01-26 | Fujitsu Limited | Electronic document management system |
US7487471B2 (en) * | 2004-07-23 | 2009-02-03 | Sap Ag | User interface for conflict resolution management |
US8117542B2 (en) | 2004-08-16 | 2012-02-14 | Microsoft Corporation | User interface for displaying selectable software functionality controls that are contextually relevant to a selected object |
US7703036B2 (en) | 2004-08-16 | 2010-04-20 | Microsoft Corporation | User interface for displaying selectable software functionality controls that are relevant to a selected object |
US8146016B2 (en) | 2004-08-16 | 2012-03-27 | Microsoft Corporation | User interface for displaying a gallery of formatting options applicable to a selected object |
US7895531B2 (en) | 2004-08-16 | 2011-02-22 | Microsoft Corporation | Floating command object |
US9015621B2 (en) | 2004-08-16 | 2015-04-21 | Microsoft Technology Licensing, Llc | Command user interface for displaying multiple sections of software functionality controls |
US8255828B2 (en) | 2004-08-16 | 2012-08-28 | Microsoft Corporation | Command user interface for displaying selectable software functionality controls |
US7747966B2 (en) * | 2004-09-30 | 2010-06-29 | Microsoft Corporation | User interface for providing task management and calendar information |
US20060101022A1 (en) * | 2004-10-25 | 2006-05-11 | Microsoft Corporation | System and process for providing an interactive, computer network-based, virtual team worksite |
US7099798B2 (en) * | 2004-10-25 | 2006-08-29 | Microsoft Corporation | Event-based system and process for recording and playback of collaborative electronic presentations |
US11568365B2 (en) | 2004-11-08 | 2023-01-31 | Open Text Corporation | Systems and methods for management of networked collaboration |
US9009582B2 (en) | 2004-11-19 | 2015-04-14 | Google Inc. | Converting spreadsheet applications to web-based applications |
US7856483B2 (en) * | 2004-12-10 | 2010-12-21 | Microsoft Corporation | Information management systems with time zone information, including event scheduling processes |
JP2006185316A (en) * | 2004-12-28 | 2006-07-13 | Fujitsu Ltd | Business analysis support program, device and method |
US20060212452A1 (en) * | 2005-03-18 | 2006-09-21 | Cornacchia Louis G Iii | System and method for remotely inputting and retrieving records and generating reports |
US7886290B2 (en) | 2005-06-16 | 2011-02-08 | Microsoft Corporation | Cross version and cross product user interface |
US8239882B2 (en) | 2005-08-30 | 2012-08-07 | Microsoft Corporation | Markup based extensibility for user interfaces |
US8689137B2 (en) | 2005-09-07 | 2014-04-01 | Microsoft Corporation | Command user interface for displaying selectable functionality controls in a database application |
US9542667B2 (en) | 2005-09-09 | 2017-01-10 | Microsoft Technology Licensing, Llc | Navigating messages within a thread |
US8627222B2 (en) | 2005-09-12 | 2014-01-07 | Microsoft Corporation | Expanded search and find user interface |
US20070208587A1 (en) * | 2005-12-08 | 2007-09-06 | Arun Sitaraman | Systems, software, and methods for communication-based business process messaging |
JP4832086B2 (en) * | 2006-01-16 | 2011-12-07 | 株式会社ソニー・コンピュータエンタテインメント | Information providing system, provided information updating method, information terminal, information terminal control method, information update server, information update server control method and program |
US20070226604A1 (en) * | 2006-03-22 | 2007-09-27 | Chalasani Nanchariah R | System and method for merging a sub-document into a collaboratively authored master document |
US7506805B1 (en) * | 2006-03-31 | 2009-03-24 | Rearden Commerce, Inc. | Method and system for unified presentation of event booking systems |
US8307119B2 (en) * | 2006-03-31 | 2012-11-06 | Google Inc. | Collaborative online spreadsheet application |
US7757176B2 (en) * | 2006-05-03 | 2010-07-13 | Sanjay Vakil | Method and system for collective calendaring |
US9727989B2 (en) | 2006-06-01 | 2017-08-08 | Microsoft Technology Licensing, Llc | Modifying and formatting a chart using pictorially provided chart elements |
US8605090B2 (en) | 2006-06-01 | 2013-12-10 | Microsoft Corporation | Modifying and formatting a chart using pictorially provided chart elements |
US8407670B2 (en) * | 2006-06-02 | 2013-03-26 | Microsoft Corporation | Collaborative code conflict detection, notification and resolution |
US7703048B2 (en) * | 2006-06-27 | 2010-04-20 | International Business Machines Corporation | Managing flexible events within an electronic calendar |
US20080005235A1 (en) * | 2006-06-30 | 2008-01-03 | Microsoft Corporation | Collaborative integrated development environment using presence information |
US8112550B2 (en) * | 2006-09-19 | 2012-02-07 | Tacoda Llc | System and method for preserving consumer choice |
US7747458B2 (en) * | 2006-10-11 | 2010-06-29 | International Business Machines Corporation | Electronic calendar auto event resolution system and method |
US7765119B2 (en) * | 2006-10-16 | 2010-07-27 | Rearden Commerce, Inc. | System and method for predictive booking of reservations based on historical aggregation and events |
US20080098067A1 (en) * | 2006-10-20 | 2008-04-24 | O'sullivan Patrick Joseph | Method and system for eliminating time lost in initial stages of a web conference due to participants not being in-place on-time |
US7822738B2 (en) * | 2006-11-30 | 2010-10-26 | Microsoft Corporation | Collaborative workspace context information filtering |
US20080148155A1 (en) * | 2006-12-18 | 2008-06-19 | Kogan Sandra L | Real-time monitor integrated activity thread snippets |
US20080154688A1 (en) * | 2006-12-22 | 2008-06-26 | Sap Ag | Groupware assistance tool providing regular appointments overview |
US20080201197A1 (en) * | 2007-02-16 | 2008-08-21 | Rearden Commerce, Inc. | System and Method for Peer Person- And Situation-Based Recommendations |
US20080222649A1 (en) * | 2007-03-06 | 2008-09-11 | Williamson Industries, Inc. | Method and computer program for managing man hours of multiple individuals working one or more tasks |
US8677270B2 (en) | 2007-05-04 | 2014-03-18 | Microsoft Corporation | Live companion user interface |
US20080288322A1 (en) * | 2007-05-10 | 2008-11-20 | Kevin Kennedy & Associates, Inc. | Methods and systems for project management |
US20080294483A1 (en) * | 2007-05-25 | 2008-11-27 | Oriana Jeannette Williams | Free time priority for calendar schedulers |
US8352554B2 (en) * | 2007-05-31 | 2013-01-08 | International Business Machines Corporation | System and method for sharing data |
US10296588B2 (en) * | 2007-05-31 | 2019-05-21 | Red Hat, Inc. | Build of material production system |
US9230228B2 (en) * | 2007-06-12 | 2016-01-05 | International Business Machines Corporation | Method and system for providing a bi-directional feedback loop between project management and personal calendar systems |
US8954507B2 (en) * | 2007-06-22 | 2015-02-10 | Microsoft Corporation | Gathering and using awareness information |
US8201103B2 (en) | 2007-06-29 | 2012-06-12 | Microsoft Corporation | Accessing an out-space user interface for a document editor program |
US8484578B2 (en) | 2007-06-29 | 2013-07-09 | Microsoft Corporation | Communication between a document editor in-space user interface and a document editor out-space user interface |
US8762880B2 (en) | 2007-06-29 | 2014-06-24 | Microsoft Corporation | Exposing non-authoring features through document status information in an out-space user interface |
US20090049108A1 (en) * | 2007-07-17 | 2009-02-19 | Gridiron Software Inc. | Method and apparatus for workflow versioning |
US20090030769A1 (en) * | 2007-07-27 | 2009-01-29 | Rearden Commerce, Inc. | System and Method for Latency Management Assistant |
US20090030609A1 (en) * | 2007-07-27 | 2009-01-29 | Rearden Commerce, Inc. | System and Method for Proactive Agenda Management |
US20090043621A1 (en) * | 2007-08-09 | 2009-02-12 | David Kershaw | System and Method of Team Performance Management Software |
US20090063239A1 (en) * | 2007-08-30 | 2009-03-05 | Ibm Corporation | Method and Apparatus for Providing an Electronic Calendar with an Indication of Timeslot Availability Dependent on the Importance of a Requester |
US8239775B2 (en) * | 2007-12-14 | 2012-08-07 | International Business Machines Corporation | Method and apparatus for a computer simulated environment |
US10395187B2 (en) * | 2008-02-11 | 2019-08-27 | Clearshift Corporation | Multilevel assignment of jobs and tasks in online work management system |
US9588781B2 (en) | 2008-03-31 | 2017-03-07 | Microsoft Technology Licensing, Llc | Associating command surfaces with multiple active components |
US20090313074A1 (en) * | 2008-06-11 | 2009-12-17 | International Business Machines Corporation | Enhanced viewing/updating of calendar entries based upon relationships between a viewer and a calendar owner and a relative importance value of the calendar entries |
US9665850B2 (en) | 2008-06-20 | 2017-05-30 | Microsoft Technology Licensing, Llc | Synchronized conversation-centric message list and message reading pane |
US8402096B2 (en) | 2008-06-24 | 2013-03-19 | Microsoft Corporation | Automatic conversation techniques |
US20090327019A1 (en) * | 2008-06-25 | 2009-12-31 | International Business Machines Corporation | Meeting scheduling system |
US20100088382A1 (en) * | 2008-08-27 | 2010-04-08 | Lee G Roger | Document manager integration |
US9741147B2 (en) * | 2008-12-12 | 2017-08-22 | International Business Machines Corporation | System and method to modify avatar characteristics based on inferred conditions |
US20100158232A1 (en) * | 2008-12-23 | 2010-06-24 | Nortel Networks Limited | Accessing recorded conference content |
US9046983B2 (en) | 2009-05-12 | 2015-06-02 | Microsoft Technology Licensing, Llc | Hierarchically-organized control galleries |
US20110054968A1 (en) * | 2009-06-04 | 2011-03-03 | Galaviz Fernando V | Continuous performance improvement system |
US20110010640A1 (en) * | 2009-07-10 | 2011-01-13 | Novell, Inc. | Intelligent co-browsing and co-editing |
US20110029904A1 (en) * | 2009-07-30 | 2011-02-03 | Adam Miles Smith | Behavior and Appearance of Touch-Optimized User Interface Elements for Controlling Computer Function |
US8910058B2 (en) * | 2009-09-29 | 2014-12-09 | International Business Machines Corporation | Performing interactive collaboration within a virtual world |
US8427521B2 (en) * | 2009-10-21 | 2013-04-23 | At&T Intellectual Property I, L.P. | Method and apparatus for providing a collaborative workspace |
US20110153380A1 (en) * | 2009-12-22 | 2011-06-23 | Verizon Patent And Licensing Inc. | Method and system of automated appointment management |
US20110246340A1 (en) * | 2010-04-02 | 2011-10-06 | Tracelink, Inc. | Method and system for collaborative execution of business processes |
US10853744B2 (en) | 2010-06-17 | 2020-12-01 | Figure Eight Technologies, Inc. | Distributing a task to multiple workers over a network for completion while providing quality control |
US11023859B2 (en) | 2010-06-17 | 2021-06-01 | CrowdFlower, Inc. | Using virtual currency to compensate workers in a crowdsourced task |
US11087247B2 (en) | 2011-03-23 | 2021-08-10 | Figure Eight Technologies, Inc. | Dynamic optimization for data quality control in crowd sourcing tasks to crowd labor |
US9858552B2 (en) * | 2011-06-15 | 2018-01-02 | Sap Ag | Systems and methods for augmenting physical media from multiple locations |
US8626545B2 (en) * | 2011-10-17 | 2014-01-07 | CrowdFlower, Inc. | Predicting future performance of multiple workers on crowdsourcing tasks and selecting repeated crowdsourcing workers |
US20120209694A1 (en) * | 2011-11-05 | 2012-08-16 | The Swap Hub LLC | Virtual communication platform |
US8745057B1 (en) | 2011-11-28 | 2014-06-03 | Google Inc. | Creating and organizing events in an activity stream |
US11568334B2 (en) | 2012-03-01 | 2023-01-31 | Figure Eight Technologies, Inc. | Adaptive workflow definition of crowd sourced tasks and quality control mechanisms for multiple business applications |
US9286597B2 (en) * | 2012-03-30 | 2016-03-15 | Microsoft Technology Licensing, Llc | Tracking co-authoring conflicts using document comments |
US10275727B2 (en) * | 2012-04-18 | 2019-04-30 | International Business Machines Corporation | Dynamic location-aware coordination method and system |
US9525986B2 (en) | 2012-09-05 | 2016-12-20 | Nokia Technologies Oy | Method and apparatus for providing triggered-presentation of a participant message associated with a multi-party communication session |
US20140096036A1 (en) * | 2012-09-28 | 2014-04-03 | Avaya Inc. | Transporting avatars and meeting materials into virtual reality meeting rooms |
US20140101571A1 (en) * | 2012-10-04 | 2014-04-10 | Lucid Dream Software, Inc. | Shared collaborative environment |
DE102013109779A1 (en) * | 2012-10-18 | 2014-04-30 | Avaya Inc. | TRANSPORTING AVATARS AND CONFERENCE MATERIALS IN VIRTUAL REALITY CONFERENCE ROOMS |
US9128516B1 (en) * | 2013-03-07 | 2015-09-08 | Pixar | Computer-generated imagery using hierarchical models and rigging |
US9274687B1 (en) | 2013-10-11 | 2016-03-01 | Google Inc. | Managing schedule changes for correlated calendar events |
US20150154566A1 (en) * | 2013-12-03 | 2015-06-04 | Vmware, Inc. | Productivity based meeting scheduler |
US20150186850A1 (en) * | 2013-12-30 | 2015-07-02 | Microsoft Corporation | Smart Meeting Creation and Management |
US9531651B1 (en) | 2014-02-13 | 2016-12-27 | Google Inc. | Methods for displaying notifications |
US10664772B1 (en) | 2014-03-07 | 2020-05-26 | Steelcase Inc. | Method and system for facilitating collaboration sessions |
US9716861B1 (en) | 2014-03-07 | 2017-07-25 | Steelcase Inc. | Method and system for facilitating collaboration sessions |
US20150271221A1 (en) * | 2014-03-20 | 2015-09-24 | Brigham Young University | Selection triggered collaborative cax editing |
US9766079B1 (en) | 2014-10-03 | 2017-09-19 | Steelcase Inc. | Method and system for locating resources and communicating within an enterprise |
US9955318B1 (en) | 2014-06-05 | 2018-04-24 | Steelcase Inc. | Space guidance and management system and method |
US9380682B2 (en) | 2014-06-05 | 2016-06-28 | Steelcase Inc. | Environment optimization for space based on presence and activities |
US11744376B2 (en) | 2014-06-06 | 2023-09-05 | Steelcase Inc. | Microclimate control systems and methods |
US10433646B1 (en) | 2014-06-06 | 2019-10-08 | Steelcaase Inc. | Microclimate control systems and methods |
US10062045B2 (en) * | 2014-06-12 | 2018-08-28 | International Business Machines Corporation | Project workspace prioritization |
US20160004741A1 (en) * | 2014-07-01 | 2016-01-07 | Encompass Corporation Pty Ltd. | Method and apparatus for managing corporate data |
US9852388B1 (en) | 2014-10-03 | 2017-12-26 | Steelcase, Inc. | Method and system for locating resources and communicating within an enterprise |
US10606859B2 (en) | 2014-11-24 | 2020-03-31 | Asana, Inc. | Client side system and method for search backed calendar user interface |
US10360287B2 (en) | 2015-05-22 | 2019-07-23 | Microsoft Technology Licensing, Llc | Unified messaging platform and interface for providing user callouts |
US20160344677A1 (en) | 2015-05-22 | 2016-11-24 | Microsoft Technology Licensing, Llc | Unified messaging platform for providing interactive semantic objects |
US10733371B1 (en) | 2015-06-02 | 2020-08-04 | Steelcase Inc. | Template based content preparation system for use with a plurality of space types |
US10915584B2 (en) * | 2015-09-22 | 2021-02-09 | Dropbox, Inc. | Event-related document generation |
US9921726B1 (en) | 2016-06-03 | 2018-03-20 | Steelcase Inc. | Smart workstation method and system |
AU2017265144B2 (en) | 2016-12-02 | 2022-04-14 | Encompass Corporation Pty Ltd | Information retrieval |
US10264213B1 (en) | 2016-12-15 | 2019-04-16 | Steelcase Inc. | Content amplification system and method |
US20180365783A1 (en) * | 2017-06-14 | 2018-12-20 | Chris Straley | ROI web based learning and training development solution |
US10977434B2 (en) | 2017-07-11 | 2021-04-13 | Asana, Inc. | Database model which provides management of custom fields and methods and apparatus therfor |
US10592234B2 (en) * | 2018-05-02 | 2020-03-17 | Microsoft Technology Licensing, Llc | Pending merge conflict notification |
WO2021150961A1 (en) * | 2020-01-22 | 2021-07-29 | Two Six Labs | System and method for live information construct and integrated and collaboration platform using the same |
US11282036B1 (en) * | 2020-07-28 | 2022-03-22 | Asana, Inc. | Systems and methods to generate agendas for group meetings |
US11627009B2 (en) * | 2021-01-22 | 2023-04-11 | Dell Products L.P. | Session management of content driven meeting summaries, action items, meeting context continuity, and segment audio-video (AV) replay for collaboration solutions |
US11792028B1 (en) | 2021-05-13 | 2023-10-17 | Asana, Inc. | Systems and methods to link meetings with units of work of a collaboration environment |
Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5548506A (en) * | 1994-03-17 | 1996-08-20 | Srinivasan; Seshan R. | Automated, electronic network based, project management server system, for managing multiple work-groups |
US5590269A (en) * | 1994-04-22 | 1996-12-31 | Minnesota Mining & Manufacturing Company | Resource assignment system providing mixed-initiative user interface updates |
US5923552A (en) * | 1996-12-31 | 1999-07-13 | Buildnet, Inc. | Systems and methods for facilitating the exchange of information between separate business entities |
US6014135A (en) * | 1997-04-04 | 2000-01-11 | Netscape Communications Corp. | Collaboration centric document processing environment using an information centric visual user interface and information presentation method |
US6119147A (en) * | 1998-07-28 | 2000-09-12 | Fuji Xerox Co., Ltd. | Method and system for computer-mediated, multi-modal, asynchronous meetings in a virtual space |
US20020085025A1 (en) * | 2000-06-29 | 2002-07-04 | Busis James R. | Universal electronic commerce platform combining browsing, buying and item registry |
US20030135565A1 (en) * | 2002-01-14 | 2003-07-17 | Julio Estrada | Electronic mail application with integrated collaborative space management |
US6769013B2 (en) * | 2002-02-02 | 2004-07-27 | E-Wings, Inc. | Distributed system for interactive collaboration |
US6791582B2 (en) * | 2000-12-29 | 2004-09-14 | International Business Machines Corporation | Method and system for identifying and displaying information that is new or has been updated in a place |
US6957395B1 (en) * | 2000-01-04 | 2005-10-18 | Apple Computer, Inc. | Computer interface having a single window mode of operation |
US6966061B1 (en) * | 2001-09-20 | 2005-11-15 | Bellsouth Intellectual Property Corp. | System and method for managing initiative delivery process |
US7030890B1 (en) * | 1999-11-02 | 2006-04-18 | Thomson Licensing S.A. | Displaying graphical objects |
US7065493B1 (en) * | 2000-04-06 | 2006-06-20 | International Business Machines Corporation | Workflow system and method |
US7082430B1 (en) * | 2000-04-17 | 2006-07-25 | Accenture Llp | Collaboration planning in a collaborative work tool architecture |
US7155435B1 (en) * | 2000-08-14 | 2006-12-26 | Ford Motor Company | Method for resolving issues within a team environment |
US7159178B2 (en) * | 2001-02-20 | 2007-01-02 | Communispace Corp. | System for supporting a virtual community |
US20080059570A1 (en) * | 2006-09-05 | 2008-03-06 | Aol Llc | Enabling an im user to navigate a virtual world |
US7360201B2 (en) * | 2002-12-09 | 2008-04-15 | International Business Machines Corporation | Automated analysis and identification of options in project management |
US7496886B2 (en) * | 2004-09-30 | 2009-02-24 | Microsoft Corporation | Method and system for providing cross project commitments |
US7634539B2 (en) * | 2004-08-02 | 2009-12-15 | Sap Ag | Relations between collaboration workspaces |
US20100205541A1 (en) * | 2009-02-11 | 2010-08-12 | Jeffrey A. Rapaport | social network driven indexing system for instantly clustering people with concurrent focus on same topic into on-topic chat rooms and/or for generating on-topic search results tailored to user preferences regarding topic |
US8019752B2 (en) * | 2005-11-10 | 2011-09-13 | Endeca Technologies, Inc. | System and method for information retrieval from object collections with complex interrelationships |
US8028051B2 (en) * | 2003-04-16 | 2011-09-27 | Fujitsu Limited | Apparatus for adjusting use resources of system and method thereof |
US8050953B2 (en) * | 2006-06-07 | 2011-11-01 | Ricoh Company, Ltd. | Use of a database in a network-based project schedule management system |
-
2003
- 2003-12-23 US US10/753,217 patent/US7904323B2/en active Active
-
2011
- 2011-01-13 US US13/006,313 patent/US20110112971A1/en not_active Abandoned
Patent Citations (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5548506A (en) * | 1994-03-17 | 1996-08-20 | Srinivasan; Seshan R. | Automated, electronic network based, project management server system, for managing multiple work-groups |
US5590269A (en) * | 1994-04-22 | 1996-12-31 | Minnesota Mining & Manufacturing Company | Resource assignment system providing mixed-initiative user interface updates |
US5923552A (en) * | 1996-12-31 | 1999-07-13 | Buildnet, Inc. | Systems and methods for facilitating the exchange of information between separate business entities |
US6014135A (en) * | 1997-04-04 | 2000-01-11 | Netscape Communications Corp. | Collaboration centric document processing environment using an information centric visual user interface and information presentation method |
US6119147A (en) * | 1998-07-28 | 2000-09-12 | Fuji Xerox Co., Ltd. | Method and system for computer-mediated, multi-modal, asynchronous meetings in a virtual space |
US7030890B1 (en) * | 1999-11-02 | 2006-04-18 | Thomson Licensing S.A. | Displaying graphical objects |
US6957395B1 (en) * | 2000-01-04 | 2005-10-18 | Apple Computer, Inc. | Computer interface having a single window mode of operation |
US7065493B1 (en) * | 2000-04-06 | 2006-06-20 | International Business Machines Corporation | Workflow system and method |
US7082430B1 (en) * | 2000-04-17 | 2006-07-25 | Accenture Llp | Collaboration planning in a collaborative work tool architecture |
US20020085025A1 (en) * | 2000-06-29 | 2002-07-04 | Busis James R. | Universal electronic commerce platform combining browsing, buying and item registry |
US7155435B1 (en) * | 2000-08-14 | 2006-12-26 | Ford Motor Company | Method for resolving issues within a team environment |
US6791582B2 (en) * | 2000-12-29 | 2004-09-14 | International Business Machines Corporation | Method and system for identifying and displaying information that is new or has been updated in a place |
US7159178B2 (en) * | 2001-02-20 | 2007-01-02 | Communispace Corp. | System for supporting a virtual community |
US6966061B1 (en) * | 2001-09-20 | 2005-11-15 | Bellsouth Intellectual Property Corp. | System and method for managing initiative delivery process |
US20030135565A1 (en) * | 2002-01-14 | 2003-07-17 | Julio Estrada | Electronic mail application with integrated collaborative space management |
US6769013B2 (en) * | 2002-02-02 | 2004-07-27 | E-Wings, Inc. | Distributed system for interactive collaboration |
US7360201B2 (en) * | 2002-12-09 | 2008-04-15 | International Business Machines Corporation | Automated analysis and identification of options in project management |
US8028051B2 (en) * | 2003-04-16 | 2011-09-27 | Fujitsu Limited | Apparatus for adjusting use resources of system and method thereof |
US7634539B2 (en) * | 2004-08-02 | 2009-12-15 | Sap Ag | Relations between collaboration workspaces |
US7496886B2 (en) * | 2004-09-30 | 2009-02-24 | Microsoft Corporation | Method and system for providing cross project commitments |
US8019752B2 (en) * | 2005-11-10 | 2011-09-13 | Endeca Technologies, Inc. | System and method for information retrieval from object collections with complex interrelationships |
US8050953B2 (en) * | 2006-06-07 | 2011-11-01 | Ricoh Company, Ltd. | Use of a database in a network-based project schedule management system |
US20080059570A1 (en) * | 2006-09-05 | 2008-03-06 | Aol Llc | Enabling an im user to navigate a virtual world |
US20100205541A1 (en) * | 2009-02-11 | 2010-08-12 | Jeffrey A. Rapaport | social network driven indexing system for instantly clustering people with concurrent focus on same topic into on-topic chat rooms and/or for generating on-topic search results tailored to user preferences regarding topic |
Non-Patent Citations (1)
Title |
---|
Yammer Intros Ticker for Enterprise. (2011, November). Wireless News. Retrieved June 27, 2012, from ProQuest Computing. (Document ID: 2510853521) * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100332980A1 (en) * | 2009-06-26 | 2010-12-30 | Xerox Corporation | Managing document interactions in collaborative document environments of virtual worlds |
US8615713B2 (en) * | 2009-06-26 | 2013-12-24 | Xerox Corporation | Managing document interactions in collaborative document environments of virtual worlds |
US20130067549A1 (en) * | 2011-09-09 | 2013-03-14 | Microsoft Corporation | Cloud-Based Broker Service for Digital Assistants |
US9195968B2 (en) * | 2011-09-09 | 2015-11-24 | Microsoft Technology Licensing, Llc | Cloud-based broker service for digital assistants |
US20160078405A1 (en) * | 2011-09-09 | 2016-03-17 | Microsoft Technology Licensing, Llc | Cloud-based broker service for digital assistants |
US9842316B2 (en) * | 2011-09-09 | 2017-12-12 | Microsoft Technology Licensing, Llc | Cloud-based broker service for digital assistants |
US20140343982A1 (en) * | 2013-05-14 | 2014-11-20 | Landmark Graphics Corporation | Methods and systems related to workflow mentoring |
US20140359529A1 (en) * | 2013-06-03 | 2014-12-04 | Microsoft Corporation | Launch Surface Control |
US9384013B2 (en) * | 2013-06-03 | 2016-07-05 | Microsoft Technology Licensing, Llc | Launch surface control |
US20240070333A1 (en) * | 2022-08-30 | 2024-02-29 | Hexagon Technology Center Gmbh | Virtual environment for large-scale capital projects |
Also Published As
Publication number | Publication date |
---|---|
US7904323B2 (en) | 2011-03-08 |
US20040261013A1 (en) | 2004-12-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7904323B2 (en) | Multi-team immersive integrated collaboration workspace | |
US10817572B2 (en) | Systems and methods for providing access to objects and searchable attributes of objects in a collaboration place | |
US11250355B2 (en) | Task based organizational management system and method | |
US7360164B2 (en) | Collaboration launchpad | |
Schlichter et al. | Workspace awareness for distributed teams | |
US7707249B2 (en) | Systems and methods for collaboration | |
US6363352B1 (en) | Automatic scheduling and formation of a virtual meeting over a computer network | |
US20160112476A1 (en) | Integrated real time collaboration experiences with online workspace | |
Tolone | Virtual situation rooms: connecting people across enterprises for supply-chain agility | |
Peña-Mora et al. | CAIRO: a concurrent engineering meeting environment for virtual design teams | |
US20080015922A1 (en) | Method and user interface for computer-assisted schedule coordination | |
US20060053195A1 (en) | Systems and methods for collaboration | |
US20060053194A1 (en) | Systems and methods for collaboration | |
US20060080432A1 (en) | Systems and methods for collaboration | |
CA2681355A1 (en) | Method and apparatus for sharing calendar information | |
JP2012048708A (en) | Communication support device and program | |
US10521737B2 (en) | Activity centric project management tool | |
Wiberg | Knowledge management in mobile CSCW: evaluation results of a mobile physical/virtual meeting support system | |
Wang et al. | Supporting virtual meetings in the overall business context | |
US20230245074A1 (en) | Meeting management apparatus, meeting management method, and meeting management system | |
Peña-Mora et al. | An integrated telepresence environment for collaboration in construction | |
Ferscha | Integrating pervasive information acquisition to enhance workspace awareness | |
Koch et al. | Awareness Information in Wide Area Network | |
Kammer et al. | Putting words to work: integrating conversation with workflow modeling | |
Xu et al. | Developing a Taxonomy of Characteristics and Features of Collaboration Tools for Teams in Distributed Environments |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: INTEL CORPORATION, OREGON Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:WYNN, ELEANOR H.;MEYERS, DON;PICKERING, CYNTHIA K.;AND OTHERS;SIGNING DATES FROM 20040120 TO 20040708;REEL/FRAME:025637/0471 |
|
STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |