EP0282126B1 - Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method - Google Patents

Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method Download PDF

Info

Publication number
EP0282126B1
EP0282126B1 EP88200378A EP88200378A EP0282126B1 EP 0282126 B1 EP0282126 B1 EP 0282126B1 EP 88200378 A EP88200378 A EP 88200378A EP 88200378 A EP88200378 A EP 88200378A EP 0282126 B1 EP0282126 B1 EP 0282126B1
Authority
EP
European Patent Office
Prior art keywords
building construction
metal band
guiding
guidings
construction section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP88200378A
Other languages
German (de)
French (fr)
Other versions
EP0282126A3 (en
EP0282126A2 (en
Inventor
Arie Oostwouder
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OOSTWOUDER SILO-SERVICE
Original Assignee
OOSTWOUDER SILO-SERVICE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OOSTWOUDER SILO-SERVICE filed Critical OOSTWOUDER SILO-SERVICE
Priority to AT88200378T priority Critical patent/ATE76151T1/en
Publication of EP0282126A2 publication Critical patent/EP0282126A2/en
Publication of EP0282126A3 publication Critical patent/EP0282126A3/en
Application granted granted Critical
Publication of EP0282126B1 publication Critical patent/EP0282126B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/02Containers for fluids or gases; Supports therefor
    • E04H7/04Containers for fluids or gases; Supports therefor mainly of metal
    • E04H7/06Containers for fluids or gases; Supports therefor mainly of metal with vertical axis
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/12Making tubes or metal hoses with helically arranged seams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H7/00Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
    • E04H7/22Containers for fluent solids, e.g. silos, bunkers; Supports therefor
    • E04H7/24Constructions, with or without perforated walls, depending on the use of specified materials
    • E04H7/30Constructions, with or without perforated walls, depending on the use of specified materials mainly of metal

Definitions

  • the invention relates to a method for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings, said method comprising the steps of:
  • This known method has a number of disadvantages.
  • the applied carrousel for winding the supplied metal band for obtaining a ring in principle can be used only for a limited number of diameters of cilindric building constructions to be constructed. If building constructions have to be constructed of which the diameter largely differs from the diameter of the carrousel a completely new carrousel has to be applied. Also the application of thicker materials offers problems in correctly shaping the material.
  • positioning the already constructed building construction section on top of the upper edge of an already constructed ring calls for a separate lifting device, whereas precise positioning the already constructed building construction section on top of the upper edge of the already constructed ring is very difficult. The reasons for this have to be sought in the low dimensional stability of the already constructed building construction section, the rather high mass thereof and the wind sensibility that can be very important at a building site.
  • the method according to the invention is characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards so far shortly before the beginning of the metal band reaches said guiding, that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
  • the building construction is lowered by synchronously lowering all guidings and is positioned onto support blocks whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means for removing the support blocks and wherein finally the building construction is lowered onto the ground.
  • the invention further relates to an apparatus as set out in the preamble of claim 3.
  • This apparatus is characterized as set out in the characterizing section of claim 3.
  • the apparatus according to the invention is very versatile, for the location of the liftings units always can be chosen corresponding with the diameter of the building construction to be constructed. Therefore the same apparatus can be used for constructing building constructions having every desired diameter. Only the number of applied lifting units should vary, wherein by building constructions having a very large diameter a larger number of lifting units should be applied.
  • the apparatus comprises at least a drive unit for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
  • said drive unit as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
  • the fig. 1 and 2 show an apparatus that can be used for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings.
  • fig. 1 it can be seen clearly that already a number of rings 1, 2 and 3 are positioned one on top of the other.
  • Fig. 2 shows the construction of a new ring 4.
  • a roof construction has to be positioned on top of the cylindric building construction this roof construction is mounted in a way known perse after the production of a first ring.
  • the apparatus comprises a number of lifting units 5 - 12 that are positioned corresponding to the diameter of the building construction to be constructed, or in the present case the diameter of the ring 4 to be constructed.
  • the number of lifting units amounts eight (see fig. 2), this number of lifting units can be varied dependent on the diameter of the building construction to be constructed.
  • the lifting units 5 - 12 are attached to a foundation constructed earlier, for example of concrete. It is possible too that, if the building construction to be constructed is a tank with a welded bottom, this bottom is firstly constructed whereafter the lifting units are positioned on top thereof. Especially when dealing with heavy and very high constructions it is necessary to support the lifting units for obtaining enough stability, but this is not shown in the fig. 1 and 2. Moreover it is important that the lifting units are leveled.
  • the lifting units 5 - 12 each comprise a guiding 13 that is connected to a carriage 16 that can be moved upwards and downwards along a guide track 14.
  • This upward and downward motion can be obtained by means of a motor 15 driving a screwed spindle or the like.
  • the upward and downward motion of the guidings 13 too can be obtained by any appropiate means, such as mechanical, electrical or hydraulic or pneumatic solutions.
  • the lifting units are activated such, that they all can move upwards and downwards synchronously, and that each lifting unit can be moved downwards independently and advantageously with an increased speed.
  • a metal band 17 is wound of a coil 18 and is supplied in a vertical position.
  • the metal band 17 firstly is shaped into the desired shape by means of a shaping device for shaping the ring four to be produced.
  • the shaping device in the present case comprises a stretching unit 19 for stretching the metal band wound of the coil 18 as well as a rolling machine 20 for rolling the metal band to the desired diameter. It is mentioned that by the application of a thicker material it is possible that this does not come from a coil 18 but that it exists of separate metal plates that are interconnected before reaching the rolling machine 20.
  • each guiding comprises a number of lower rolls combined with vertical guiding means.
  • the metal band 17 is led around the guidings 13 of the liftings units 5 - 12 like this the metal band 17 is, by means of a cutting device 22, cut off to a length that corresponds with the circumference of the ring 4 to be shaped.
  • This cutting device 22 can comprise a cutting torch, a plasma cutting device, a slitting disc, a pair of shears or the like. Finally the beginning and the end of the cut off metal band section are interconnected for producing a complete ring 4.
  • the guidings 13 of the lifting units 5 - 12 are synchronously moved upwards for which reason the motors 15 are activated.
  • the distance over which the guidings 13 are moved upwards equals the width of the supplied metal band 17. This stroke of the guidings 13 can be preset.
  • the metal band 17 is supplied again. If the forward end of this metal band 17 has reached the vicinity of the lifting unit 12 the guiding 13 of this lifting unit 12 is moved downwards, for example with an increased speed, such that the metal band 17 can pass above said guiding. As a result the upper edge of this metal band 17 contacts the lower edge of the already constructed building construction section, as appears clearly from fig. 1, in which the upper edge of the metal band 17 contacts the lower edge of ring 3. Next the mentioned upper edge can be attached to the mentioned lower edge, whereafter the already constructed building construction section is rotated synchronously with the supplied metal band 17.
  • a further drive unit 23 is applied for moving the metal band 17 and the already constructed building construction section.
  • This drive unit 23 is, as seen in the direction of motion, positioned shortly ahead of the location where the upper edge of the metal band 17 is attached to the lower edge of the already constructed building construction section.
  • the drive unit 23 comprises two pairs of drive rolls 24, 25 positioned one on top of the other.
  • the drive rolls 24 of the upper pair of drive rolls engage both sides of the lower edge of the already constructed building construction section, whereas the drive rolls 25 of the lower pair of drive rolls engage both sides of the upper edge of the metal band 17.
  • the drive rolls 24, 25 are inclined such that the rotation axes of the drive rolls positioned at one side of the building construction wall diverge into the direction of motion of the building construction. Consequently the driving force comprises a component forcing the metal band 17 and the already constructed building construction section towards each other.
  • each pair of drive rolls 24, 25 at least one roll is settable spring-loaded, so that an automatic setting is possible in reaction to several material gauges.
  • a variable circumferential velocity of the building construction is obliged.
  • the driving units 21 and 23 as well as the rolling device applied in this embodiment therefore have to be tuned with respect to their drive velocities.
  • an automatic welding device 26 is illustrated schematically, said welding device interconnecting the upper edge of the supplied metal band and the lower edge of the already constructed building construction section.
  • every other connecting method can be applied, for example the application of bolts or rivets.
  • welding constitutes a very simple but however safe connecting method.
  • guiding rolls 27 are shown for guiding and leading the metal band 17 as well as the already constructed building construction section at the welding device 26. These guiding rolls too can be settable for an adjustment to several material gauges.
  • the welding device comprises a device for single sided welding, in which at the side of the building construction wall facing away from the welding device a cooling unit is applied for cooling this side.
  • This cooling unit can be pushed resiliently against the welding seam for obtaining a smooth wall. Further than a change of the structure of the material and a possible reduction of the resistence against corrosion can be avoided as much as possible. Too the mechanical characteristics of the material, such as the tensile strength and the tensile limit are maintained better.
  • cooling unit By a number of materials to be used such a cooling unit is desirable if a double sided welding is applied. These cooling units are not shown in fig. 1 or 2.
  • an apparatus (not shown) is positioned for treating the edges to be welded, whereas behind the welding device 26 an apparatus for treating the welding seams can be applied.
  • the rolling machine 20 is positioned outside of the circumference of a constructed ring 4.
  • the separate rolling rolls of this rolling machine can be interconnected at their upper and lower sides in a way not shown in detail.
  • this rolling machine 20 too can roll very thick metal band 17 without moving apart the separate rolling rolls of this rolling machine 20.
  • this building construction After obtaining a building construction section with the desired height, thus a building construction section having enough rings positioned one on top of the other, this building construction has to be placed onto the ground. This can be achieved as represented schematically in the fig. 3 - 6.
  • Fig. 3 shows that it is not directly possible to place the lower ring 4 onto the ground by means of the guidings 13. Therefore, after the entire complete building construction is sligthly lifted, between the guidings 13 support blocks 28 are positioned (fig. 4), said support blocks 28 having such a height that the guidings 13, after lowering the complete building construction onto the support blocks 28, disengage the lower edge of the lower ring 4 if this lower egde rests on the support blocks 28. Next the guidings 13 are disassembled from the lifting units 5 - 12 and are removed from underneath the lower edge of the lower ring 4.
  • Fig. 5 shows the next phase, in which the guidings 13 are removed by auxiliary means 29, for example an angle plate with a locking lip.
  • auxiliary means 29 engage the lower edge of the ring 4 and lift the entire building construction by a synchronous activation of all lifting units 5 - 12.
  • the support blocks 28 are removed, whereafter the auxiliary means 29 are synchronously lowered until one or a number of said auxiliarly means nearly contacts the highest point of the ground, that mostly comprises concrete.
  • a number of filling plates are positioned underneath the building construction for filling up the space between the ground and the lower side of the constructed construction, and for leveling and unevennesses of the ground.
  • the auxiliary means 29 now can be lowered synchronously until the entire construction rests on the filling plates (fig. 6), whereafter the auxiliary means 29 and the lifting units 5 -12 can be disassembled. Next the complete construction can be anchored in the usual way and be sealed.
  • auxiliary means to the inner side and to the lower side of the ring 4 so that by means of specially designed auxiliary means the complete construction can be positioned directly onto the steel bottom.

Abstract

A method and an apparatus are provided for constructing a cylindric metal building construction, in which the building construction is supported by a number of guidings (5 - 12), such, that always a appropriate support is obtained without the need for additional lifting devices. According to the invention the guidings (5 - 12) are each separately or together movable upwards and downwards.

Description

  • The invention relates to a method for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings, said method comprising the steps of:
    • in a vertical position supplying the material for constructing the rings, such as metal band or metal plates to be assembled to a metal band, and shaping the material into the desired shape with a shaping device,
    • shaping the supplied material into a ring by means of appropriate guidings,
    • cutting the metal band or the metal plates assembled to a metal band to a length corresponding to the circumference of the corresponding ring to be shaped,
    • connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section,
    • entirely lifting the building construction section constructed like this and supplying further rings underneath until the building construction has reached the desired height, and
    • finally placing the building construction onto the ground.
  • In a known method of this type (see EP-A-136.581) the supplied metal band is continuously applied to a carrousel comprising a rotating platform of which the rotation velocity corresponds with the supply velocity of the band. When the length of a metal band section is obtained corresponding with the circumference of a ring the metal band is cut loose whereafter winding it onto the carrousel is completed. Next the building construction section that already has been constructed earlier is positioned on top of the ring just constructed and is connected thereto.
  • This known method has a number of disadvantages. The applied carrousel for winding the supplied metal band for obtaining a ring in principle can be used only for a limited number of diameters of cilindric building constructions to be constructed. If building constructions have to be constructed of which the diameter largely differs from the diameter of the carrousel a completely new carrousel has to be applied. Also the application of thicker materials offers problems in correctly shaping the material. As a further disadvantage of this method it can be mentioned that positioning the already constructed building construction section on top of the upper edge of an already constructed ring calls for a separate lifting device, whereas precise positioning the already constructed building construction section on top of the upper edge of the already constructed ring is very difficult. The reasons for this have to be sought in the low dimensional stability of the already constructed building construction section, the rather high mass thereof and the wind sensibility that can be very important at a building site.
  • It is an object of the invention to provide a method for constructing a cylindric metal building construction not having the mentioned disadvantages.
  • Therefore the method according to the invention is characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards so far shortly before the beginning of the metal band reaches said guiding, that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
  • In constrast with the known method an already constructed building construction section is no longer lifted entirely above a new ring to be constructed, but this already constructed building construction section initially rests totally on the guidings. During the progression of the production of a new ring the support of this already constructed building construction section is progressively taken over by the ring section positioned therebelow, said ring section being supported by the lowered guidings. Like this at each moment a safe and reliable support of the already constructed building construction section is provided wherein too a good positioning of this building construction section relative to the supplied metal band for shaping a new ring is accomplished.
  • In a preferred embodiment of the method according to the invention after completing the last, lowermost ring and connecting it to the already constructed building construction section, the building construction is lowered by synchronously lowering all guidings and is positioned onto support blocks whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means for removing the support blocks and wherein finally the building construction is lowered onto the ground.
  • Like this also during the last phase of the construction of the building construction, namely positioning it onto the ground, no additional hoisting unit or the like is necessary. The guidings that initially are positioned underneath the lower edge of the lowermost ring, can, if the building construction rests on the support blocks, be removed in an easy way, whereafter the building construction is finally positioned onto the ground by means of the auxiliary means.
  • The invention further relates to an apparatus as set out in the preamble of claim 3. This apparatus is characterized as set out in the characterizing section of claim 3. By the presence of a number of lifting units lifting the previously completed building construction section can be accomplished without additional means, whereas the apparatus according to the invention is very versatile, for the location of the liftings units always can be chosen corresponding with the diameter of the building construction to be constructed. Therefore the same apparatus can be used for constructing building constructions having every desired diameter. Only the number of applied lifting units should vary, wherein by building constructions having a very large diameter a larger number of lifting units should be applied.
  • In a handy embodiment of the apparatus according to the invention it comprises at least a drive unit for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section. Like this a synchronous motion of the building construction section and the metal band is obtained.
  • Hereafter the invention will be elucidated with reference to the drawing, in which an embodiment of the method and apparatus according to the invention is illustrated.
    • Fig. 1 shows schematically a side elevational view of an apparatus according to the invention for carrying out the method according to the invention;
    • Fig. 2 shows the apparatus of fig. 1 in a top plan view at an earlier moment but only showing the latest ring, and
    • Fig. 3 - 6 show a part of the apparatus during a number of successive steps of the method according to the invention.
  • The fig. 1 and 2 show an apparatus that can be used for constructing a cylindric metal building construction by positioning successive rings one on top of the other and interconnecting said rings. In fig. 1 it can be seen clearly that already a number of rings 1, 2 and 3 are positioned one on top of the other. Fig. 2 shows the construction of a new ring 4.
  • If a roof construction has to be positioned on top of the cylindric building construction this roof construction is mounted in a way known perse after the production of a first ring.
  • As appears from fig. 1 the apparatus comprises a number of lifting units 5 - 12 that are positioned corresponding to the diameter of the building construction to be constructed, or in the present case the diameter of the ring 4 to be constructed. Although in the shown embodiment the number of lifting units amounts eight (see fig. 2), this number of lifting units can be varied dependent on the diameter of the building construction to be constructed. The lifting units 5 - 12 are attached to a foundation constructed earlier, for example of concrete. It is possible too that, if the building construction to be constructed is a tank with a welded bottom, this bottom is firstly constructed whereafter the lifting units are positioned on top thereof. Especially when dealing with heavy and very high constructions it is necessary to support the lifting units for obtaining enough stability, but this is not shown in the fig. 1 and 2. Moreover it is important that the lifting units are leveled.
  • The lifting units 5 - 12 each comprise a guiding 13 that is connected to a carriage 16 that can be moved upwards and downwards along a guide track 14. This upward and downward motion can be obtained by means of a motor 15 driving a screwed spindle or the like. The upward and downward motion of the guidings 13 too can be obtained by any appropiate means, such as mechanical, electrical or hydraulic or pneumatic solutions.
  • Further it is possible that the lifting units are activated such, that they all can move upwards and downwards synchronously, and that each lifting unit can be moved downwards independently and advantageously with an increased speed.
  • During constructing a cylindric metal building construction a metal band 17 is wound of a coil 18 and is supplied in a vertical position. The metal band 17 firstly is shaped into the desired shape by means of a shaping device for shaping the ring four to be produced. As appears from fig. 2 the shaping device in the present case comprises a stretching unit 19 for stretching the metal band wound of the coil 18 as well as a rolling machine 20 for rolling the metal band to the desired diameter. It is mentioned that by the application of a thicker material it is possible that this does not come from a coil 18 but that it exists of separate metal plates that are interconnected before reaching the rolling machine 20.
  • During shaping the first ring of a metallic building construction to be constructed all guidings 13 of the lifting units 5 - 12 are in their lowermost position. The end of the metal band 17 that has passed the rolling machine 20 is moved onwards (clockwise as seen in fig. 2) by means of a drive unit 21 and is successively moved over the guidings 13 of the lifting units 5 - 12. For correctly guiding the metal band 17 the guidings each comprise a support wall with flanged edges. It is possible to apply lockings or additional guidings for holding the construction in case of a strong wind or the like.
  • In another embodiment of the guidings not shown each guiding comprises a number of lower rolls combined with vertical guiding means.
  • When the metal band 17 is led around the guidings 13 of the liftings units 5 - 12 like this the metal band 17 is, by means of a cutting device 22, cut off to a length that corresponds with the circumference of the ring 4 to be shaped. This cutting device 22 can comprise a cutting torch, a plasma cutting device, a slitting disc, a pair of shears or the like. Finally the beginning and the end of the cut off metal band section are interconnected for producing a complete ring 4.
  • After the first ring 4 has been formed the guidings 13 of the lifting units 5 - 12 are synchronously moved upwards for which reason the motors 15 are activated. The distance over which the guidings 13 are moved upwards equals the width of the supplied metal band 17. This stroke of the guidings 13 can be preset.
  • Next via the stretching unit 19, through the drive unit 21 and along the rolling unit 20 the metal band 17 is supplied again. If the forward end of this metal band 17 has reached the vicinity of the lifting unit 12 the guiding 13 of this lifting unit 12 is moved downwards, for example with an increased speed, such that the metal band 17 can pass above said guiding. As a result the upper edge of this metal band 17 contacts the lower edge of the already constructed building construction section, as appears clearly from fig. 1, in which the upper edge of the metal band 17 contacts the lower edge of ring 3. Next the mentioned upper edge can be attached to the mentioned lower edge, whereafter the already constructed building construction section is rotated synchronously with the supplied metal band 17. During said rotation always that guiding 13 that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band 17 is moved downwards so far, shortly before the beginning of the metal band 17 reaches said guiding 13, that the metal band 17 is moved over said guiding 13 and that the lower edge of the metal band 17 is supported by said guiding 13. In fig. 1 the situation is represented in which the guiding 13 of the lifting unit 5 is shortly before moving downwards towards the position of said guiding represented in dotted lines.
  • Like this the already constructed building construction section is always appropiately supported. After reaching the desired length of the metal band 17 this is cut off again by means of the cutting device 22, whereafter the ends are interconnected and whereafter the previously described steps are repeated until the desired hight of the building construction has been achieved.
  • For moving the metal band 17 and the already constructed building construction section a further drive unit 23 is applied. This drive unit 23 is, as seen in the direction of motion, positioned shortly ahead of the location where the upper edge of the metal band 17 is attached to the lower edge of the already constructed building construction section. As indicated in fig. 1 the drive unit 23 comprises two pairs of drive rolls 24, 25 positioned one on top of the other. The drive rolls 24 of the upper pair of drive rolls engage both sides of the lower edge of the already constructed building construction section, whereas the drive rolls 25 of the lower pair of drive rolls engage both sides of the upper edge of the metal band 17. Further the drive rolls 24, 25 are inclined such that the rotation axes of the drive rolls positioned at one side of the building construction wall diverge into the direction of motion of the building construction. Consequently the driving force comprises a component forcing the metal band 17 and the already constructed building construction section towards each other.
  • It is emphasized that it is not necessary to incline the drive rolls 24, 25 as indicated in the figures. Other solutions can be presented for correctly positioning and holding together the metal band 17 and the already constructed building construction section.
  • In constructing a metal building construction the gauge of the applied material often increases downwards from ring to ring. Therefore it is advantageous if of each pair of drive rolls 24, 25 at least one roll is settable spring-loaded, so that an automatic setting is possible in reaction to several material gauges. For automatically welding different materials having different gauges a variable circumferential velocity of the building construction is obliged. The driving units 21 and 23 as well as the rolling device applied in this embodiment therefore have to be tuned with respect to their drive velocities.
  • Further in fig. 2 an automatic welding device 26 is illustrated schematically, said welding device interconnecting the upper edge of the supplied metal band and the lower edge of the already constructed building construction section. Of course every other connecting method can be applied, for example the application of bolts or rivets. However, if materials such as steel, stainless steel, aluminum and the like are used, welding constitutes a very simple but however safe connecting method.
  • At both sides of the welding device 26 guiding rolls 27 are shown for guiding and leading the metal band 17 as well as the already constructed building construction section at the welding device 26. These guiding rolls too can be settable for an adjustment to several material gauges.
  • If a thin material is used, it is possible that the welding device comprises a device for single sided welding, in which at the side of the building construction wall facing away from the welding device a cooling unit is applied for cooling this side. This cooling unit can be pushed resiliently against the welding seam for obtaining a smooth wall. Further than a change of the structure of the material and a possible reduction of the resistence against corrosion can be avoided as much as possible. Too the mechanical characteristics of the material, such as the tensile strength and the tensile limit are maintained better.
  • By a number of materials to be used such a cooling unit is desirable if a double sided welding is applied. These cooling units are not shown in fig. 1 or 2.
  • Further it is possible that ahead of the welding device 26 an apparatus (not shown) is positioned for treating the edges to be welded, whereas behind the welding device 26 an apparatus for treating the welding seams can be applied.
  • Instead of the shown automatic welding device 26 it is possible however that the welding process is carried out manually.
  • As appears clearly from fig. 2 the rolling machine 20 is positioned outside of the circumference of a constructed ring 4. As a result the separate rolling rolls of this rolling machine can be interconnected at their upper and lower sides in a way not shown in detail. As a result this rolling machine 20 too can roll very thick metal band 17 without moving apart the separate rolling rolls of this rolling machine 20.
  • If a ring is completed it can be rotated along the guidings 13 before lifting the constructed building construction section. By a profile apparatus not shown reinforcement ridges can be pressed into the metal band thus offering the complete building construction a greater stiffness.
  • After obtaining a building construction section with the desired height, thus a building construction section having enough rings positioned one on top of the other, this building construction has to be placed onto the ground. This can be achieved as represented schematically in the fig. 3 - 6.
  • Fig. 3 shows that it is not directly possible to place the lower ring 4 onto the ground by means of the guidings 13. Therefore, after the entire complete building construction is sligthly lifted, between the guidings 13 support blocks 28 are positioned (fig. 4), said support blocks 28 having such a height that the guidings 13, after lowering the complete building construction onto the support blocks 28, disengage the lower edge of the lower ring 4 if this lower egde rests on the support blocks 28. Next the guidings 13 are disassembled from the lifting units 5 - 12 and are removed from underneath the lower edge of the lower ring 4.
  • Fig. 5 shows the next phase, in which the guidings 13 are removed by auxiliary means 29, for example an angle plate with a locking lip. These auxiliary means 29 engage the lower edge of the ring 4 and lift the entire building construction by a synchronous activation of all lifting units 5 - 12. The support blocks 28 are removed, whereafter the auxiliary means 29 are synchronously lowered until one or a number of said auxiliarly means nearly contacts the highest point of the ground, that mostly comprises concrete. After this, divided along the circumference, a number of filling plates are positioned underneath the building construction for filling up the space between the ground and the lower side of the constructed construction, and for leveling and unevennesses of the ground. The auxiliary means 29 now can be lowered synchronously until the entire construction rests on the filling plates (fig. 6), whereafter the auxiliary means 29 and the lifting units 5 -12 can be disassembled. Next the complete construction can be anchored in the usual way and be sealed.
  • If the completed building construction has to be mounted onto a prefabricated steel bottom it will be necessary to mount auxiliary means to the inner side and to the lower side of the ring 4 so that by means of specially designed auxiliary means the complete construction can be positioned directly onto the steel bottom.
  • The invention is not limited to the embodiment described before but can be varied widely within the scope of the invention, defined by the claims.

Claims (8)

  1. Method for constructing a cylindric metal building construction by positioning successive rings (1, 2, 3) one on top of the other and interconnecting said rings, said method comprising the steps of:
    - in a vertical position supplying the material for constructing the rings, such as metal band (17) or metal plates to be assembled to a metal band, and shaping the material into the desired shape with a shaping device (19, 20),
    - shaping the supplied material into a ring by means of appropriate guidings (13),
    - cutting the metal band or the metal plates assembled to a metal band to a length corresponding to the circumference of the corresponding ring to be shaped,
    - connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section,
    - entirely lifting the building construction section constructed like this and supplying further rings underneath until the building construction has reached the desired height, and
    - finally placing the building construction onto the ground
    characterized in that lifting the building construction already constructed is carried out by synchronously moving the guidings (13) upwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards shortly before the beginning of the metal band reaches said guiding, so that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
  2. Method according to claim 1, characterized in that after completing the last, lowermost ring (4) and connecting it to the already constructed building construction section, the building construction is lowered by synchronously lowering all guidings (13) and is positioned onto support blocks (28) whereafter the guidings are removed from under the lower edge of the lowermosts ring and wherein the building construction is slightly lifted by means of auxiliary means (29) for removing the support blocks (28) and wherein finally the building construction is lowered onto the ground.
  3. Apparatus for carrying out the method according to claim 1 or 2 comprising
    - a shaping device (19, 20) for shaping the material supplied for constructing the rings, such as metal band or metal plates, into the desired shape;
    - guidings (13) for shaping the supplied material into a ring;
    - means (22) for cutting the metal band or the metal plates to a length corresponding to the circumference of the corresponding ring to be shaped;
    - means (26) for connecting the upper edge of the metal band to the lower edge of an already constructed building construction section and interconnecting the beginning and the end of the cut-off metal band section, and
    - means (5-12) for lifting the building construction section constructed like this enabling further rings to be supplied underneath until the building construction has reached the desired height,
    characterized in that the means for lifting the building construction already constructed comprise lifting units (5-12) for moving the guidings (13) upwards and downwards, said guidings comprising supports engaging the lower edge of this building construction section, whereas always that guiding that in the circumferential direction of the building construction section is positioned ahead of the supplied metal band is moved downwards shortly before the beginning of the metal band reaches said guiding, so that the metal band is moved over said guiding and that the lower edge of the metal band is supported by said guiding.
  4. Apparatus according to claim 3, characterized in that each guiding is connected to a carriage (16) that can be moved upwards and downwards along a guide track (14).
  5. Apparatus according to claim 4, characterized in than each guiding comprises a support roll (13) that can be released from its carriage and can be replaced by an auxiliary means that is constructed as an angle plate (29) engaging the lower edge of the building construction.
  6. Apparatus according to one of the claims 3 - 5, with a rolling machine as shaping device, characterized in that the rolling machine (20) is positioned outside of the circumferential track of the rolled metal band as defined by the guidings.
  7. Apparatus according to one of the claims 3 - 6, characterized in that it comprises at least a drive unit (23) for circumferentially moving the already constructed building construction section wherein said drive unit, as seen in the direction of motion, is positioned shortly ahead of the location where the upper edge of the metal band is connected to the lower edge of the already constructed building construction section.
  8. Apparatus according to one of the claims 3 - 7, which is provided with a welding device (26) for interconnecting the metal band and the already constructed building construction section, characterized in that near to the welding device at least one pair of guide rolls (27) are provided for guiding the metal band and the building construction section.
EP88200378A 1987-03-09 1988-02-29 Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method Expired - Lifetime EP0282126B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AT88200378T ATE76151T1 (en) 1987-03-09 1988-02-29 METHOD OF MAKING METALLIC CYLINDRICAL BUILDINGS AND APPARATUS FOR APPLYING THE METHOD.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL8700554A NL8700554A (en) 1987-03-09 1987-03-09 METHOD FOR MANUFACTURING A CYLINDRICAL METAL BUILDING CONSTRUCTION AND APPARATUS FOR CARRYING OUT THIS METHOD
NL8700554 1987-03-09

Publications (3)

Publication Number Publication Date
EP0282126A2 EP0282126A2 (en) 1988-09-14
EP0282126A3 EP0282126A3 (en) 1989-03-01
EP0282126B1 true EP0282126B1 (en) 1992-05-13

Family

ID=19849675

Family Applications (1)

Application Number Title Priority Date Filing Date
EP88200378A Expired - Lifetime EP0282126B1 (en) 1987-03-09 1988-02-29 Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method

Country Status (6)

Country Link
EP (1) EP0282126B1 (en)
AT (1) ATE76151T1 (en)
DE (1) DE3870938D1 (en)
DK (1) DK168051B1 (en)
ES (1) ES2031994T3 (en)
NL (1) NL8700554A (en)

Cited By (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011009185A1 (en) 2009-07-24 2011-01-27 Dedini S/A. Indústrias De Base Jack for the construction of vertical cylindrical tanks
US8306021B2 (en) 2008-04-02 2012-11-06 Twilio, Inc. System and method for processing telephony sessions
US8315369B2 (en) 2009-03-02 2012-11-20 Twilio, Inc. Method and system for a multitenancy telephone network
US8416923B2 (en) 2010-06-23 2013-04-09 Twilio, Inc. Method for providing clean endpoint addresses
US8509415B2 (en) 2009-03-02 2013-08-13 Twilio, Inc. Method and system for a multitenancy telephony network
US8582737B2 (en) 2009-10-07 2013-11-12 Twilio, Inc. System and method for running a multi-module telephony application
US8601136B1 (en) 2012-05-09 2013-12-03 Twilio, Inc. System and method for managing latency in a distributed telephony network
US8638781B2 (en) 2010-01-19 2014-01-28 Twilio, Inc. Method and system for preserving telephony session state
US8649268B2 (en) 2011-02-04 2014-02-11 Twilio, Inc. Method for processing telephony sessions of a network
US8738051B2 (en) 2012-07-26 2014-05-27 Twilio, Inc. Method and system for controlling message routing
US8737962B2 (en) 2012-07-24 2014-05-27 Twilio, Inc. Method and system for preventing illicit use of a telephony platform
US8837465B2 (en) 2008-04-02 2014-09-16 Twilio, Inc. System and method for processing telephony sessions
US8938053B2 (en) 2012-10-15 2015-01-20 Twilio, Inc. System and method for triggering on platform usage
US8948356B2 (en) 2012-10-15 2015-02-03 Twilio, Inc. System and method for routing communications
US8964726B2 (en) 2008-10-01 2015-02-24 Twilio, Inc. Telephony web event system and method
US9001666B2 (en) 2013-03-15 2015-04-07 Twilio, Inc. System and method for improving routing in a distributed communication platform
US9137127B2 (en) 2013-09-17 2015-09-15 Twilio, Inc. System and method for providing communication platform metadata
US9160696B2 (en) 2013-06-19 2015-10-13 Twilio, Inc. System for transforming media resource into destination device compatible messaging format
US9210275B2 (en) 2009-10-07 2015-12-08 Twilio, Inc. System and method for running a multi-module telephony application
US9226217B2 (en) 2014-04-17 2015-12-29 Twilio, Inc. System and method for enabling multi-modal communication
US9225840B2 (en) 2013-06-19 2015-12-29 Twilio, Inc. System and method for providing a communication endpoint information service
US9240941B2 (en) 2012-05-09 2016-01-19 Twilio, Inc. System and method for managing media in a distributed communication network
US9246694B1 (en) 2014-07-07 2016-01-26 Twilio, Inc. System and method for managing conferencing in a distributed communication network
US9247062B2 (en) 2012-06-19 2016-01-26 Twilio, Inc. System and method for queuing a communication session
US9253254B2 (en) 2013-01-14 2016-02-02 Twilio, Inc. System and method for offering a multi-partner delegated platform
US9251371B2 (en) 2014-07-07 2016-02-02 Twilio, Inc. Method and system for applying data retention policies in a computing platform
US9282124B2 (en) 2013-03-14 2016-03-08 Twilio, Inc. System and method for integrating session initiation protocol communication in a telecommunications platform
US9325624B2 (en) 2013-11-12 2016-04-26 Twilio, Inc. System and method for enabling dynamic multi-modal communication
US9338280B2 (en) 2013-06-19 2016-05-10 Twilio, Inc. System and method for managing telephony endpoint inventory
US9338018B2 (en) 2013-09-17 2016-05-10 Twilio, Inc. System and method for pricing communication of a telecommunication platform
US9338064B2 (en) 2010-06-23 2016-05-10 Twilio, Inc. System and method for managing a computing cluster
US9336500B2 (en) 2011-09-21 2016-05-10 Twilio, Inc. System and method for authorizing and connecting application developers and users
US9344573B2 (en) 2014-03-14 2016-05-17 Twilio, Inc. System and method for a work distribution service
US9363301B2 (en) 2014-10-21 2016-06-07 Twilio, Inc. System and method for providing a micro-services communication platform
US9398622B2 (en) 2011-05-23 2016-07-19 Twilio, Inc. System and method for connecting a communication to a client
US9459925B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9459926B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9477975B2 (en) 2015-02-03 2016-10-25 Twilio, Inc. System and method for a media intelligence platform
US9483328B2 (en) 2013-07-19 2016-11-01 Twilio, Inc. System and method for delivering application content
US9495227B2 (en) 2012-02-10 2016-11-15 Twilio, Inc. System and method for managing concurrent events
US9516101B2 (en) 2014-07-07 2016-12-06 Twilio, Inc. System and method for collecting feedback in a multi-tenant communication platform
US9553799B2 (en) 2013-11-12 2017-01-24 Twilio, Inc. System and method for client communication in a distributed telephony network
US9590849B2 (en) 2010-06-23 2017-03-07 Twilio, Inc. System and method for managing a computing cluster
US9602586B2 (en) 2012-05-09 2017-03-21 Twilio, Inc. System and method for managing media in a distributed communication network

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2134107B1 (en) * 1996-06-14 2000-04-16 Del Campo Salvador Garcia INSTALLATION FOR THE CONSTRUCTION AND ASSEMBLY "IN SITU" OF TANKS WITH VERTICAL AXIS.
EP1464418A1 (en) * 2003-04-03 2004-10-06 Constructions Soudees Du Coteau Csc Method of constructing a cylindrical metal storage tank, and device for implementing this method
NL1023402C2 (en) * 2003-05-13 2004-11-16 Swilion B V Method and device for constructing a steel tower and a steel tower.
ITTO20090388A1 (en) * 2009-05-21 2010-11-22 Ct Metal S R L TRANSPORTABLE PROFILING PLANT
US20120208495A1 (en) 2010-06-23 2012-08-16 Twilio, Inc. System and method for monitoring account usage on a platform
US8838707B2 (en) 2010-06-25 2014-09-16 Twilio, Inc. System and method for enabling real-time eventing
AR077643A1 (en) * 2010-07-07 2011-09-14 Cantoni Gruas Y Montajes S R L METHOD OF CONSTRUCTION OF TANKS AND DEVICE TO CARRY OUT THE VIOLATION SPACE STAGE OF SUCH METHOD
AR077400A1 (en) * 2010-07-07 2011-08-24 Cantoni Gruas Y Montajes S R L SAFE DEVICE FOR ASSEMBLY AND MOLDING IN-SITU OF LARGE CONSTRUCTION PARTS AND ASSEMBLY ACCESSORY
US20140044123A1 (en) 2011-05-23 2014-02-13 Twilio, Inc. System and method for real time communicating with a client application
US9648006B2 (en) 2011-05-23 2017-05-09 Twilio, Inc. System and method for communicating with a client application
US10182147B2 (en) 2011-09-21 2019-01-15 Twilio Inc. System and method for determining and communicating presence information
US20120137623A1 (en) * 2011-10-05 2012-06-07 Balaji Haridasu Wind turbine tower section and method of assembling a wind turbine tower
CN103009027B (en) * 2012-12-04 2015-04-22 三一重工股份有限公司 Silo cutting method
US9274858B2 (en) 2013-09-17 2016-03-01 Twilio, Inc. System and method for tagging and tracking events of an application platform
US9774687B2 (en) 2014-07-07 2017-09-26 Twilio, Inc. System and method for managing media and signaling in a communication platform
US10419891B2 (en) 2015-05-14 2019-09-17 Twilio, Inc. System and method for communicating through multiple endpoints
US9948703B2 (en) 2015-05-14 2018-04-17 Twilio, Inc. System and method for signaling through data storage
EP3189906B1 (en) * 2016-01-11 2019-04-10 Xaver Lipp Device for making a cylindrical container with large diameter, in particular of a silo
US10659349B2 (en) 2016-02-04 2020-05-19 Twilio Inc. Systems and methods for providing secure network exchanged for a multitenant virtual private cloud
US10063713B2 (en) 2016-05-23 2018-08-28 Twilio Inc. System and method for programmatic device connectivity
US10686902B2 (en) 2016-05-23 2020-06-16 Twilio Inc. System and method for a multi-channel notification service
DK181492B1 (en) * 2022-08-18 2024-03-07 Stiesdal Offshore As Method of assembling a tubular floating structure and its use

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0136581A1 (en) * 1983-09-06 1985-04-10 Societe Nouvelle Des Constructions Soudees Du Coteau Process and installation for manufacturing large cylindrical metallic apparatuses

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2866261A (en) * 1956-09-19 1958-12-30 Kralovopolska Strojirna Method of erecting sheet plate casings having a cylindrical shape with vertical axis, by shifting the sheet plates along a helical line
US3182958A (en) * 1961-11-07 1965-05-11 Rodoverken Svenungson & Co Apparatus for erecting a vertically extending cylindrical casing
US4121747A (en) * 1976-02-09 1978-10-24 Anchortank, Inc. Storage tank construction procedures
DE2649839A1 (en) * 1976-10-29 1978-05-03 Garcia Salvador Garcia Method of mfr. of metal containers - has flat sheets welded together for feeding into circle of rollers to form cylinder
US4177915A (en) * 1978-06-19 1979-12-11 Wikstrom International Ab Method for manufacturing large tanks
JPS5691939A (en) * 1979-12-25 1981-07-25 Nippon Kokan Kk <Nkk> Production of circumferential barrel ring for construction of cylindrical storage tank

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0136581A1 (en) * 1983-09-06 1985-04-10 Societe Nouvelle Des Constructions Soudees Du Coteau Process and installation for manufacturing large cylindrical metallic apparatuses

Cited By (65)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8837465B2 (en) 2008-04-02 2014-09-16 Twilio, Inc. System and method for processing telephony sessions
US9306982B2 (en) 2008-04-02 2016-04-05 Twilio, Inc. System and method for processing media requests during telephony sessions
US8611338B2 (en) 2008-04-02 2013-12-17 Twilio, Inc. System and method for processing media requests during a telephony sessions
US8306021B2 (en) 2008-04-02 2012-11-06 Twilio, Inc. System and method for processing telephony sessions
US9596274B2 (en) 2008-04-02 2017-03-14 Twilio, Inc. System and method for processing telephony sessions
US9456008B2 (en) 2008-04-02 2016-09-27 Twilio, Inc. System and method for processing telephony sessions
US8755376B2 (en) 2008-04-02 2014-06-17 Twilio, Inc. System and method for processing telephony sessions
US9591033B2 (en) 2008-04-02 2017-03-07 Twilio, Inc. System and method for processing media requests during telephony sessions
US8964726B2 (en) 2008-10-01 2015-02-24 Twilio, Inc. Telephony web event system and method
US9407597B2 (en) 2008-10-01 2016-08-02 Twilio, Inc. Telephony web event system and method
US8570873B2 (en) 2009-03-02 2013-10-29 Twilio, Inc. Method and system for a multitenancy telephone network
US8737593B2 (en) 2009-03-02 2014-05-27 Twilio, Inc. Method and system for a multitenancy telephone network
US8995641B2 (en) 2009-03-02 2015-03-31 Twilio, Inc. Method and system for a multitenancy telephone network
US8509415B2 (en) 2009-03-02 2013-08-13 Twilio, Inc. Method and system for a multitenancy telephony network
US9357047B2 (en) 2009-03-02 2016-05-31 Twilio, Inc. Method and system for a multitenancy telephone network
US8315369B2 (en) 2009-03-02 2012-11-20 Twilio, Inc. Method and system for a multitenancy telephone network
WO2011009185A1 (en) 2009-07-24 2011-01-27 Dedini S/A. Indústrias De Base Jack for the construction of vertical cylindrical tanks
US9491309B2 (en) 2009-10-07 2016-11-08 Twilio, Inc. System and method for running a multi-module telephony application
US9210275B2 (en) 2009-10-07 2015-12-08 Twilio, Inc. System and method for running a multi-module telephony application
US8582737B2 (en) 2009-10-07 2013-11-12 Twilio, Inc. System and method for running a multi-module telephony application
US8638781B2 (en) 2010-01-19 2014-01-28 Twilio, Inc. Method and system for preserving telephony session state
US9459926B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9590849B2 (en) 2010-06-23 2017-03-07 Twilio, Inc. System and method for managing a computing cluster
US9338064B2 (en) 2010-06-23 2016-05-10 Twilio, Inc. System and method for managing a computing cluster
US8416923B2 (en) 2010-06-23 2013-04-09 Twilio, Inc. Method for providing clean endpoint addresses
US9459925B2 (en) 2010-06-23 2016-10-04 Twilio, Inc. System and method for managing a computing cluster
US9455949B2 (en) 2011-02-04 2016-09-27 Twilio, Inc. Method for processing telephony sessions of a network
US8649268B2 (en) 2011-02-04 2014-02-11 Twilio, Inc. Method for processing telephony sessions of a network
US9398622B2 (en) 2011-05-23 2016-07-19 Twilio, Inc. System and method for connecting a communication to a client
US9336500B2 (en) 2011-09-21 2016-05-10 Twilio, Inc. System and method for authorizing and connecting application developers and users
US9495227B2 (en) 2012-02-10 2016-11-15 Twilio, Inc. System and method for managing concurrent events
US9240941B2 (en) 2012-05-09 2016-01-19 Twilio, Inc. System and method for managing media in a distributed communication network
US9350642B2 (en) 2012-05-09 2016-05-24 Twilio, Inc. System and method for managing latency in a distributed telephony network
US9602586B2 (en) 2012-05-09 2017-03-21 Twilio, Inc. System and method for managing media in a distributed communication network
US8601136B1 (en) 2012-05-09 2013-12-03 Twilio, Inc. System and method for managing latency in a distributed telephony network
US9247062B2 (en) 2012-06-19 2016-01-26 Twilio, Inc. System and method for queuing a communication session
US9270833B2 (en) 2012-07-24 2016-02-23 Twilio, Inc. Method and system for preventing illicit use of a telephony platform
US8737962B2 (en) 2012-07-24 2014-05-27 Twilio, Inc. Method and system for preventing illicit use of a telephony platform
US8738051B2 (en) 2012-07-26 2014-05-27 Twilio, Inc. Method and system for controlling message routing
US8938053B2 (en) 2012-10-15 2015-01-20 Twilio, Inc. System and method for triggering on platform usage
US9319857B2 (en) 2012-10-15 2016-04-19 Twilio, Inc. System and method for triggering on platform usage
US9307094B2 (en) 2012-10-15 2016-04-05 Twilio, Inc. System and method for routing communications
US8948356B2 (en) 2012-10-15 2015-02-03 Twilio, Inc. System and method for routing communications
US9253254B2 (en) 2013-01-14 2016-02-02 Twilio, Inc. System and method for offering a multi-partner delegated platform
US9282124B2 (en) 2013-03-14 2016-03-08 Twilio, Inc. System and method for integrating session initiation protocol communication in a telecommunications platform
US9001666B2 (en) 2013-03-15 2015-04-07 Twilio, Inc. System and method for improving routing in a distributed communication platform
US9338280B2 (en) 2013-06-19 2016-05-10 Twilio, Inc. System and method for managing telephony endpoint inventory
US9160696B2 (en) 2013-06-19 2015-10-13 Twilio, Inc. System for transforming media resource into destination device compatible messaging format
US9240966B2 (en) 2013-06-19 2016-01-19 Twilio, Inc. System and method for transmitting and receiving media messages
US9225840B2 (en) 2013-06-19 2015-12-29 Twilio, Inc. System and method for providing a communication endpoint information service
US9483328B2 (en) 2013-07-19 2016-11-01 Twilio, Inc. System and method for delivering application content
US9137127B2 (en) 2013-09-17 2015-09-15 Twilio, Inc. System and method for providing communication platform metadata
US9338018B2 (en) 2013-09-17 2016-05-10 Twilio, Inc. System and method for pricing communication of a telecommunication platform
US9553799B2 (en) 2013-11-12 2017-01-24 Twilio, Inc. System and method for client communication in a distributed telephony network
US9325624B2 (en) 2013-11-12 2016-04-26 Twilio, Inc. System and method for enabling dynamic multi-modal communication
US9344573B2 (en) 2014-03-14 2016-05-17 Twilio, Inc. System and method for a work distribution service
US9226217B2 (en) 2014-04-17 2015-12-29 Twilio, Inc. System and method for enabling multi-modal communication
US9516101B2 (en) 2014-07-07 2016-12-06 Twilio, Inc. System and method for collecting feedback in a multi-tenant communication platform
US9246694B1 (en) 2014-07-07 2016-01-26 Twilio, Inc. System and method for managing conferencing in a distributed communication network
US9553900B2 (en) 2014-07-07 2017-01-24 Twilio, Inc. System and method for managing conferencing in a distributed communication network
US9588974B2 (en) 2014-07-07 2017-03-07 Twilio, Inc. Method and system for applying data retention policies in a computing platform
US9251371B2 (en) 2014-07-07 2016-02-02 Twilio, Inc. Method and system for applying data retention policies in a computing platform
US9509782B2 (en) 2014-10-21 2016-11-29 Twilio, Inc. System and method for providing a micro-services communication platform
US9363301B2 (en) 2014-10-21 2016-06-07 Twilio, Inc. System and method for providing a micro-services communication platform
US9477975B2 (en) 2015-02-03 2016-10-25 Twilio, Inc. System and method for a media intelligence platform

Also Published As

Publication number Publication date
NL8700554A (en) 1988-10-03
DK122588D0 (en) 1988-03-08
DK122588A (en) 1988-09-10
ES2031994T3 (en) 1993-01-01
DE3870938D1 (en) 1992-06-17
EP0282126A3 (en) 1989-03-01
DK168051B1 (en) 1994-01-24
EP0282126A2 (en) 1988-09-14
ATE76151T1 (en) 1992-05-15

Similar Documents

Publication Publication Date Title
EP0282126B1 (en) Method for constructing a cylindric metal building construction as well as apparatus for carrying out said method
US3945106A (en) Method of mounting a natural draft cooling tower
CN103465033B (en) Full-automatic reinforcing bar truss production line
RU2639403C2 (en) Process of tank erection and device for implementation of this process
US3863479A (en) Apparatus for the production of a tube
US3549077A (en) Apparatus for fabricating thin-walled steel cylinders
US4177915A (en) Method for manufacturing large tanks
GB1564983A (en) Storage tank construction procedures
CN113275720A (en) Construction method for manufacturing reinforcement cage by roll welding machine for highway engineering
US2993679A (en) Hoisting apparatus for cylindrical tanks
US4074847A (en) Welded storage tank construction including a structural fin
US4288277A (en) Molding system with retracting mold
US4432128A (en) Method and system for installing a layered vessel on location
CN113714435A (en) Special-shaped reinforcement framework forming welding equipment and construction method thereof
US4467633A (en) Trough, manufacturing process, and apparatus
US4606208A (en) Pipe forming apparatus
CN113172182B (en) Reinforcing cage production process of reinforced precast pile
US3018546A (en) Method of making a storage tank construction
CN216787815U (en) Slip form system suitable for variable cross-section vertical structure
GB2096227A (en) Method and apparatus for silo construction
US4632617A (en) Method and system for installing a layered vessel on location
JPS5832520A (en) Manufacture of cylindrical sheel having thin wall and large diameter and device thereof
CN220209807U (en) Cable laying mechanism
CN219598619U (en) Oil pipe lining pipe drawing machine
US4155541A (en) Installation for ramming the material constituting the refractory lining of a metallurgical vessel

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH DE ES FR GB IT LI NL SE

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH DE ES FR GB IT LI NL SE

17P Request for examination filed

Effective date: 19890824

17Q First examination report despatched

Effective date: 19901023

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB IT LI NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19920513

Ref country code: CH

Effective date: 19920513

Ref country code: AT

Effective date: 19920513

REF Corresponds to:

Ref document number: 76151

Country of ref document: AT

Date of ref document: 19920515

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3870938

Country of ref document: DE

Date of ref document: 19920617

ITF It: translation for a ep patent filed

Owner name: BUGNION S.P.A.

ET Fr: translation filed
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2031994

Country of ref document: ES

Kind code of ref document: T3

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
EAL Se: european patent in force in sweden

Ref document number: 88200378.3

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20030226

Year of fee payment: 16

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20030227

Year of fee payment: 16

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040301

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20040301

EUG Se: european patent has lapsed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050228

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20040301

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20060221

Year of fee payment: 19

Ref country code: GB

Payment date: 20060221

Year of fee payment: 19

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20060228

Year of fee payment: 19

REG Reference to a national code

Ref country code: FR

Ref legal event code: CD

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20070323

Year of fee payment: 20

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20070228

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20070901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070901

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070901

BE20 Be: patent expired

Owner name: *OOSTWOUDER SILO-SERVICE

Effective date: 20080229

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070228

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20070228

Year of fee payment: 20