CN103544570A - Data management system and method based on PLM system and TDM system - Google Patents
Data management system and method based on PLM system and TDM system Download PDFInfo
- Publication number
- CN103544570A CN103544570A CN201310526107.5A CN201310526107A CN103544570A CN 103544570 A CN103544570 A CN 103544570A CN 201310526107 A CN201310526107 A CN 201310526107A CN 103544570 A CN103544570 A CN 103544570A
- Authority
- CN
- China
- Prior art keywords
- module
- data
- test program
- program data
- sending
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a data management system and method based on a PLM system and a TDM system. The data management system comprises an extraction module (1), a sending module (2), a receiving module (4), a display module (6), a service bus (3), a control module (7), a read-in module (5) and an inquiry module (8), wherein the extraction module (1) is used for extracting testing schedule data, the sending module (2) is used for sending the testing schedule data to the service bus (3), the receiving module (4) is used for obtaining the testing schedule data and for sending data fed back for successfully obtaining the testing schedule data to the service bus (3), the display module (6) is used for displaying the testing schedule data and test result data to a user, the service bus (3) is used for sending the data fed back for successfully obtaining the testing schedule data to a PLM system and for sending the test result data to the display module (6), the control module (7) is used for sending read-in instruction data to a read-in module (5) and for sending inquiry instruction data to the inquiry module (8), and the inquiry module (8) is used for inquiring testing result data and sending the data to the service bus (3).
Description
Technical field
The present invention relates to data management system and method and technology field, particularly a kind of data management system and method thereof based on PLM (Production Lifecycle Management) system and TDM (data Management) system.
Background technology
At present, equipments manufacture enterprises is widely used PLM system and TDM system is carried out data management.PLM system, as main design class system, is managed important product data, is one of core data of enterprise information system.TDM system is as important trial system, and the test relevant information Ye Shi enterprise of its management designs the important reference frame of R&D work.PLM system, in carrying out the process of product design, need to be tested the product of its design, to verify the feasibility of product design; TDM system, before testing, also needs to obtain the product information of test, to generate test findings.
In actual applications, PLM system and TDM system adhere to different departments separately, independent operating separately, and between two systems, transmission of information all imports and derives by user is manual, and it is ageing poor, thereby causes experiment work to lag behind design effort.In this case, TDM system cannot provide test findings to PLM system in time, cause designer cannot according to test findings, correct or revise in time the mistake in design effort.
Summary of the invention
One of object of the present invention is to provide a kind of data management system based on PLM system and TDM system.
Two of object of the present invention is to provide a kind of data managing method based on PLM system and TDM system.
Data management system based on PLM system and TDM system provided by the invention comprises:
Extraction module, for extracting test program data and send it to sending module from PLM system;
Sending module, for being sent to service bus by the test program data from extraction module;
Receiver module, for obtaining test program data and it being sent to respectively to writing module and display module, also for sending and obtain the successful feedback data of test program data to service bus from service bus;
Display module, for showing test program data, also for show test findings data to user to user;
Service bus, for being sent to PLM system through sending module and extraction module successively by the successful feedback data of test program data of obtaining from receiver module, also for the test findings data from enquiry module are sent to display module through receiver module;
Control module, for sending and write director data to writing module, also for sending query statement data to enquiry module;
Writing module, writes TDM system for the director data that writes responding from control module by test program data; And
Enquiry module, is also sent to service bus by these test findings data for the query statement data that respond from control module from TDM system queries test findings data.
Data managing method based on PLM system and TDM system provided by the invention adopts described data management system, and this data managing method comprises the steps:
S1: extraction module extracts test program data and the test program data of acquisition are sent to sending module from PLM system;
S2: sending module is sent to service bus by the test program data from extraction module;
S3: receiver module obtains test program data and these test program data are sent to respectively to writing module and display module from service bus, and receiver module sends and obtains the successful feedback data of test program data to service bus;
S4: service bus is sent to PLM system through sending module and extraction module successively by the successful feedback data of test program data of obtaining from receiver module;
S5: display module shows test program data to user, judges whether test program data to write TDM system for user;
S6: user is sent and writes director data to writing module by control module;
S7: writing module response writes TDM system from the director data that writes of control module by test program data;
S8: user sends query statement data by control module to enquiry module;
S9: enquiry module response is also sent to service bus by these test findings data from the query statement data of control module from TDM system queries test findings data;
S10: service bus is sent to display module by the test findings data from enquiry module through receiver module;
S11: display module shows test findings data to user.
Preferably, in the time need to revising the test program data of TDM system, repeating said steps S1-S7 writes TDM system by new test program data, and makes the original test program data of new test program data replacement.
The present invention has following beneficial effect:
Data management system of the present invention and data managing method by PLM system together with the TDM system integration, realized the data real-time exchange between PLM system and TDM system, improved the ageing of PLM system and the exchange of TDM data among systems, thereby guaranteed that designer can correct or revise the mistake in design effort in time according to test findings.
Accompanying drawing explanation
The structural drawing of the data management system based on PLM system and TDM system that Fig. 1 provides for the embodiment of the present invention.
Embodiment
Below in conjunction with drawings and Examples, summary of the invention of the present invention is further described.
As shown in Figure 1, the data management system based on PLM system and TDM system that the present embodiment provides comprises extraction module 1, sending module 2, service bus 3, receiver module 4, writing module 5, display module 6, control module 7 and enquiry module 8.
Extraction module 1 is for extracting test program data and the test program data of acquisition are sent to sending module 2 from PLM system.Sending module 2 is for being sent to service bus 3 by the test program data from extraction module 1.Receiver module 4 is for obtaining test program data from service bus 3 and these test program data being sent to respectively to writing module 5 and display module 6, and receiver module 4 is also for sending and obtain the successful feedback data of test program data to service bus 3.Service bus 3 is for being sent to PLM system through sending module 2 and extraction module 1 successively by the successful feedback data of test program data of obtaining from receiver module 4.Display module 6, for show test program data to user, judges whether test program data to write TDM system for user.Control module 7 is for sending and write director data to writing module 5, and control module 7 is also for sending query statement data to enquiry module 8.Writing module 5 writes TDM system for the director data that writes responding from control module 7 by test program data.After TDM system acceptance test outline data, according to test program, carry out and test and obtain test findings data.Enquiry module 8 is also sent to service bus 3 by these test findings data for the query statement data that respond from control module 7 from TDM system queries test findings data.Service bus 3 is also for being sent to display module 6 by the test findings data from enquiry module 8 through receiver module 4.Display module 6 is also for showing test findings data to user.
The data managing method based on PLM system and TDM system that the present embodiment provides comprises the steps:
S1: extraction module 1 extracts test program data and the test program data of acquisition are sent to sending module 2 from PLM system;
S2: sending module 2 is sent to service bus 3 by the test program data from extraction module 1;
S3: receiver module 4 obtains test program data and these test program data are sent to respectively to writing module 5 and display module 6 from service bus 3, and receiver module 4 sends and obtains the successful feedback data of test program data to service bus 3;
S4: service bus 3 is sent to PLM system through sending module 2 and extraction module 1 successively by the successful feedback data of test program data of obtaining from receiver module 4;
S5: display module 6 shows test program data to user, judges whether test program data to write TDM system for user;
S6: user is sent and writes director data to writing module 5 by control module 7;
S7: writing module 5 responses write TDM system from the director data that writes of control module 7 by test program data;
S8: user sends query statement data by control module 7 to enquiry module 8;
S9: enquiry module 8 responses are also sent to service bus 3 by these test findings data from the query statement data of control module 7 from TDM system queries test findings data;
S10: service bus 3 is sent to display module 6 by the test findings data from enquiry module 8 through receiver module 4;
S11: display module 6 shows test findings data to user.
When user need to revise the test program data of TDM system, repeat above-mentioned steps S1-S7 new test program data are write to TDM system, and make the original test program data of new test program data replacement.
Should be appreciated that the above detailed description of technical scheme of the present invention being carried out by preferred embodiment is illustrative and not restrictive.Those of ordinary skill in the art modifies reading the technical scheme that can record each embodiment on the basis of instructions of the present invention, or part technical characterictic is wherein equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (3)
1. the data management system based on PLM system and TDM system, is characterized in that, this data management system comprises:
Extraction module (1), for extracting test program data and send it to sending module (2) from PLM system;
Sending module (2), for being sent to service bus (3) by the test program data from extraction module (1);
Receiver module (4), for obtaining test program data and it be sent to respectively to writing module (5) and display module (6) from service bus (3), also for sending and obtain the successful feedback data of test program data to service bus (3);
Display module (6), for showing test program data, also for show test findings data to user to user;
Service bus (3), for being sent to PLM system through sending module (2) and extraction module (1) successively from the successful feedback data of test program data of obtaining of receiver module (4), also for the test findings data from enquiry module (8) are sent to display module (6) through receiver module (4);
Control module (7), for sending and write director data to writing module (5), also for sending query statement data to enquiry module (8);
Writing module (5), writes TDM system for the director data that writes responding from control module (7) by test program data; And
Enquiry module (8), for response from the query statement data of control module (7) from TDM system queries test findings data and send it to service bus (3).
2. the data managing method based on PLM system and TDM system, this data managing method adopts data management system claimed in claim 1, it is characterized in that, and this data managing method comprises the steps:
S1: extraction module (1) extracts test program data and the test program data of acquisition are sent to sending module (2) from PLM system;
S2: sending module (2) is sent to service bus (3) by the test program data from extraction module (1);
S3: receiver module (4) obtains test program data and these test program data are sent to respectively to writing module (5) and display module (6) from service bus (3), and receiver module (4) sends and obtains the successful feedback data of test program data to service bus (3);
S4: service bus (3) will be sent to PLM system through sending module (2) and extraction module (1) successively from the successful feedback data of test program data of obtaining of receiver module (4);
S5: display module (6) shows test program data to user, judges whether test program data to write TDM system for user;
S6: user is sent and writes director data to writing module (5) by control module (7);
S7: writing module (5) response writes TDM system from the director data that writes of control module (7) by test program data;
S8: user sends query statement data by control module (7) to enquiry module (8);
S9: enquiry module (8) response is also sent to service bus (3) by these test findings data from the query statement data of control module (7) from TDM system queries test findings data;
S10: service bus (3) is sent to display module (6) by the test findings data from enquiry module (8) through receiver module (4);
S11: display module (6) shows test findings data to user.
3. the data managing method based on PLM system and TDM system according to claim 2, it is characterized in that, in the time need to revising the test program data of TDM system, repeating said steps S1-S7 writes TDM system by new test program data, and makes the original test program data of new test program data replacement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310526107.5A CN103544570B (en) | 2013-10-30 | 2013-10-30 | A kind of based on PLM system and the data management system of TDM system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310526107.5A CN103544570B (en) | 2013-10-30 | 2013-10-30 | A kind of based on PLM system and the data management system of TDM system and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103544570A true CN103544570A (en) | 2014-01-29 |
CN103544570B CN103544570B (en) | 2016-09-21 |
Family
ID=49968003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310526107.5A Active CN103544570B (en) | 2013-10-30 | 2013-10-30 | A kind of based on PLM system and the data management system of TDM system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103544570B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046629A (en) * | 2019-12-16 | 2020-04-21 | 北大方正集团有限公司 | Outline display method, device and equipment |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040162741A1 (en) * | 2003-02-07 | 2004-08-19 | David Flaxer | Method and apparatus for product lifecycle management in a distributed environment enabled by dynamic business process composition and execution by rule inference |
CN101419689A (en) * | 2008-12-10 | 2009-04-29 | 武汉奋进电力技术有限公司 | Full lofe cycle management system of electric power tools |
CN101458709A (en) * | 2008-12-19 | 2009-06-17 | 中国运载火箭技术研究院 | Complex test data retroactive method |
CN102855187A (en) * | 2012-07-31 | 2013-01-02 | 许继集团有限公司 | Relay protection device software defect tracking management system and method |
-
2013
- 2013-10-30 CN CN201310526107.5A patent/CN103544570B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040162741A1 (en) * | 2003-02-07 | 2004-08-19 | David Flaxer | Method and apparatus for product lifecycle management in a distributed environment enabled by dynamic business process composition and execution by rule inference |
CN101419689A (en) * | 2008-12-10 | 2009-04-29 | 武汉奋进电力技术有限公司 | Full lofe cycle management system of electric power tools |
CN101458709A (en) * | 2008-12-19 | 2009-06-17 | 中国运载火箭技术研究院 | Complex test data retroactive method |
CN102855187A (en) * | 2012-07-31 | 2013-01-02 | 许继集团有限公司 | Relay protection device software defect tracking management system and method |
Non-Patent Citations (1)
Title |
---|
沈建新,周儒荣: ""产品全生命周期管理系统框架及关键技术研究"", 《南京航空航天大学学报》, vol. 35, no. 5, 31 October 2003 (2003-10-31), pages 565 - 571 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111046629A (en) * | 2019-12-16 | 2020-04-21 | 北大方正集团有限公司 | Outline display method, device and equipment |
CN111046629B (en) * | 2019-12-16 | 2022-03-01 | 北大方正集团有限公司 | Outline display method, device and equipment |
Also Published As
Publication number | Publication date |
---|---|
CN103544570B (en) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MX2023000186A (en) | Systems and methods for creating a universal record. | |
CN104216961B (en) | A kind of data processing method and device | |
CN102970373B (en) | A kind of method of data synchronization, Apparatus and system | |
CN106095376B (en) | A kind of implementation method of quick configuration monitoring picture | |
CN103927338A (en) | Log information storage processing method and log information storage processing device | |
CN105450705A (en) | Service data processing method and apparatus | |
CN103605664A (en) | Massive dynamic data fast query method meeting different time granularity requirements | |
CN102857949A (en) | Method and device for planning data consistency guarantees | |
CN104268234A (en) | Method and device for synchronizing data based on SQL statements | |
CN104200300A (en) | Packaging and printing enterprise production cost estimation system | |
CN103218238A (en) | Method of classifying application programs based on operating system | |
CN104318459A (en) | Automatic market analysis method based on multi-mode learning | |
CN103440197B (en) | A kind of method automatically generating difference test report based on contrast test | |
CN104517014A (en) | Automatic product assembly design system based on Pro/E and assembly processing algorithm thereof | |
CN114925072A (en) | Data management method, apparatus, system, device, medium, and program product | |
CN104463264A (en) | Dynamic generation and display system for two-dimensional code and control method of dynamic generation and display system | |
CN104063545A (en) | Method and system for dynamically displaying process tracing diagram | |
CN104809126A (en) | Business process engine system | |
CN103425490B (en) | Based on the management method running object data in crm system | |
CN103544570A (en) | Data management system and method based on PLM system and TDM system | |
CN103605806A (en) | Implementation method for configurable structural data organization mode | |
CN105740365B (en) | A kind of data warehouse method for quickly querying and device | |
CN204331731U (en) | A kind of product automatic assembly design system based on Pro/E | |
CN103310304A (en) | Method and device for managing process model | |
CN112734404B (en) | Iterative man-hour statistical method and device in research and development process and computer equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |