CN102609818A - Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number - Google Patents

Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number Download PDF

Info

Publication number
CN102609818A
CN102609818A CN2012100341897A CN201210034189A CN102609818A CN 102609818 A CN102609818 A CN 102609818A CN 2012100341897 A CN2012100341897 A CN 2012100341897A CN 201210034189 A CN201210034189 A CN 201210034189A CN 102609818 A CN102609818 A CN 102609818A
Authority
CN
China
Prior art keywords
project
task
link
flow process
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100341897A
Other languages
Chinese (zh)
Inventor
曹武龙
王国圃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU YAXINFENG INFORMATION TECHNOLOGY Co Ltd
Original Assignee
SUZHOU YAXINFENG INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU YAXINFENG INFORMATION TECHNOLOGY Co Ltd filed Critical SUZHOU YAXINFENG INFORMATION TECHNOLOGY Co Ltd
Priority to CN2012100341897A priority Critical patent/CN102609818A/en
Publication of CN102609818A publication Critical patent/CN102609818A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number. The method describes a workflow circulating method based on sequence number by using a project as a circulating object, using the sequence number as a circulating method and using a data table as a circulating carrier; the method comprises the following steps: creating a project by using project identification (ID) as the unique key word; starting the project; carrying out flow circulation according to the sequence of tasks in a flow circulation table; adding task records in a task list; accepting task and then replying and updating the current task record of the task list according to the real-time state of the current task; next, acquiring the next link to be executed from a table corresponding to a flow link; generating a new task record in the task list; circulating in sequence till all the tasks are finished; ending the project. Through practical operation and test in the development and construction progresses, the implement effect of the circulating method based on sequence number is well embodied, and the accuracy of the method is verified.

Description

3G mobile communication O&M flow process circulation method based on sequence number
Technical field
The invention belongs to the mobile communication technology field, be specifically related to a kind of 3G mobile communication O&M flow process circulation method based on sequence number.
Background technology
Granting along with telecommunications reorganization and 3G license; Each big 3G operation commercial city is studied in the mechanism of change and the detailed rules for the implementation of setting about operation management; BPM is one of breach of 3G operator operation management lifting as the important component part of operation management.Yet the operation flow set up of each big 3G operator derives from the summary of working experience, the rational theoretical direction of lack of scientific, systems organization and standard mostly at present; And most process management systems are subject to software architecture and development approach thereof, can't flexibly and fast customize flow process, therefore can't adapt to the generation of new business.Along with 3G build like a raging fire, the requirement of operator's flow management is more and more urgent.
It is single that existing OSS system of 3G operator comprises that Service Activation System, NOC worker's single system (network failure processing service system), CNOC worker's single system (big customer's after-sale service system), the chain of command in production and network monitoring system are accepted different workers respectively, and each system adopts different techniques framework and implementation route.Thereby cause client's new business, inner new demand etc. can't to be ensured in time that all the phenomenon of " lead and start whole body " often appears in system variation, response cycle is long.The information island that each system builds formation has respectively also caused data to be difficult to share, and system applies and perceptibility are all lower.
Implement in the corporate strategy process of transition in each 3G operator; Be badly in need of building the OSS of Service Management and operation aspect; System's construction lays particular emphasis on quick response service and changes in demand; Adopt the Implementation Modes towards SOA on the framework, component development method is adopted in exploitation, and concrete Implementation Modes takes to set up earlier three basic platforms (unified flowsheet platform, unified portal platform, unified interface platform); Make up the pattern of four types of service application (service guarantee, production commander, operation management, integrated management) again; Thereby the system that makes had both ensured the change of front end client response and internal demands, had also ensured the robustness of system architecture itself, made the managing of system, controllability improve greatly.
Summary of the invention
Problems such as the object of the invention is to provide a kind of 3G mobile communication O&M flow process circulation method based on sequence number, has solved data and has been difficult to share, and system applies and perceptibility are all lower.
In order to solve these problems of the prior art, technical scheme provided by the invention is:
A kind of 3G mobile communication O&M flow process circulation method based on sequence number is characterized in that said method comprising the steps of:
(1) be that project created in unique key word with item id; Add-ins program recording in repertory; The task list of initialization respective item; And in flow config table, link allocation list, procedure links correspondence table, flow process circulation table the mission bit stream in configuration project information and the project flow process, and the sequencing in project of setting the tasks is initialized as " rough draft " state with the state of project;
(2) startup project is carried out the flow process circulation according to the task sequencing in the flow process circulation table, in task list, adds task record, and the project current state is revised as " enforcement " state, and current task is set to " not accepting " state;
(3) real-time status according to current task is " accepting " state with current task status modifier in the current task record of task list, the process of accepting of finishing the work;
(4) according to the real-time status of current task renewal replied in the current task record of task list; Submit with item id, link ID and three identifiers of flow process type I D then; From the procedure links correspondence table, obtain the next link of carrying out; In task list, produce new task record, circulate successively and all accomplish until all tasks, project finishes.
Preferably, flow config table comprises flow process ID and process name field in the said method; Said link allocation list comprises link ID and link title; Repertory comprises item id, flow process ID, project name and project current state field; Said task list comprises task ID, the link ID corresponding with task, affiliated item id, task current state, a last task ID field; Said procedure links correspondence table comprises corresponding relation sign ID, flow process ID, link ID and carries out sequence number field; Said flow process circulation table comprises the corresponding relation sign ID when the corresponding relation sign ID of prosomite, next link.
Preferably, said method item table and task list are as public information, and repertory is established the project data table outward in addition, carries out association through item id.
Preferably, carry out sequence number field described in the said method in the procedure links correspondence table and confirm link sequencing on stream; When walking abreast link, the value of carrying out sequence number field is identical.
Preferably, the link ID that carries out according to the next one in the said method step (4) produces new task record in task list after, when the prosomite status modifier is " replying " state, next link status modifier is " not accepting " state.
Preferably, when all tasks were all accomplished in all sub-projects in the said method step (4), current project status modifier was " filing " state, and project finishes.
The objective of the invention is to move the operation management flow process to 3G; Set up a kind of need not to revise code just can the flexible customization flow process; To satisfy the method for the flow change that to bring constantly appear in 3G new business; Circulate through simple sequence number and to realize serial and the concurrency relation in the workflow, realize accomplishing the flow process circulation, be convenient to the process management system user of service and conveniently dispose and use flow process according to sequence number by tables of data in the database.
With respect to scheme of the prior art, advantage of the present invention is:
The research of moving operation management flow process circulation method for 3G has very wide significance and using value.Mainly can be applied in: the workflow management of communication O&M, electronics O&M and management, flow process combing, analysis and optimization.What the 3G (Third Generation) Moblie O&M process management system of developing according to this method adopted is the B/S framework, and development platform is vs2005+oracle 9i, and the user can dispose needed any flow process as required easily.Sequential relationship (configuration sequence number) in only need disposing between configuration flow title, link title, link and the link in the flow process of system.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further described:
Fig. 1 is the status transition chart of project circulation, and the circulation definition of a project is become 11 states.
Fig. 2 is the logical relation between task list, flow config table, link allocation list, procedure links correspondence table, the repertory.
Embodiment
Below in conjunction with specific embodiment such scheme is further specified.Should be understood that these embodiment are used to the present invention is described and are not limited to limit scope of the present invention.The implementation condition that adopts among the embodiment can be done further adjustment according to the condition of concrete producer, and not marked implementation condition is generally the condition in the normal experiment.
Embodiment
Present embodiment carries out according to following steps based on the 3G mobile communication O&M flow process circulation method of sequence number:
(1) be that project created in unique key word with item id; Add-ins program recording in repertory; The task list of initialization respective item; And in flow config table, link allocation list, procedure links correspondence table, flow process circulation table the mission bit stream in configuration project information and the project flow process, and the sequencing in project of setting the tasks is initialized as " rough draft " state with the state of project;
(2) startup project is carried out the flow process circulation according to the task sequencing in the flow process circulation table, in task list, adds task record, and the project current state is revised as " enforcement " state, and current task is set to " not accepting " state;
(3) real-time status according to current task is " accepting " state with current task status modifier in the current task record of task list, the process of accepting of finishing the work;
(4) according to the real-time status of current task renewal replied in the current task record of task list; Submit with item id, link ID and three identifiers of flow process type I D then; From the procedure links correspondence table, obtain the next link of carrying out; In task list, produce new task record, circulate successively and all accomplish until all tasks, project finishes.
This flow process circulation method is convenient, fast, and has designed the algorithm of circulation.Flow process circulation method based on sequence number mainly comprises three parts.
First: the term to relating in the method carries out normalized definition.Comprise that mainly flow, link, project, task define.
(1) flow process: represent a series of activity or incidents relevant, that inner link is arranged, comprise the combination of a series of activities
(2) link: a task in the expression flow process, it is a flow process that a plurality of links combine.
(3) project: represent a concrete activity or incident
(4) task: represent the action in the incident.
Flow process, link belong to abstract, and project, task then are its concrete forms of expression.
Second portion: status change, circulation process to a 3G mobile communication operation management project are described.A project is from producing completion; Its state is defined as: rough draft, pending, audit not through, audit through, to be performed, implements, reject, hang up, treat concluding a research item, wait to file, file, transition and the circulation in these states is described method to project.
The circulation process of project generally comprises 11 states: rough draft, pending, audit not through, to be performed, reject, implement, be affiliated to, hang up, treat concluding a research item, concluding a research item, filing.Project specifically circulates process shown in accompanying drawing 1.
Can find out that from accompanying drawing 1 the establishment of item people at first drafts a project, this moment, project was in " rough draft " state, and the establishment of item people submits this project to audit, and the member of wait project audit group examines project, and this moment, the state of project was " pending ".If this project through audit, does not then change " audit is not passed through " state over to, if this project then changes " to be performed " state over to through audit.Under this state, the project management group membership carries out secondary to the master data of project and verifies, if not through audit, then this project changes " rejecting " state over to, verifies if this project has been passed through the secondary of project management group, then changes " enforcement " state over to.Under " enforcement " state, if this project can be waited for this project " hang-up " activate because some reason need be postponed and being carried out.Under " enforcement " state, if this project need wait the completion of sundry item just can proceed, can by the Project Manager with these project enterprises "affiliated to" public institutions on the project of treating in advance, wait the completion of project in advance to separate extension again.After the task that the Project Manager distributes has all been accomplished, submit the concluding a research item application to by the Project Manager, project changes " treating concluding a research item " state over to.The founder agrees concluding a research item, and this project success concluding a research item changes " waiting to file " state over to, " filing " work of waiting system keeper, and so far all data of project become read-only.After the project filing that the system manager will be to be filed, this project status becomes to be filed, and the data of this project have only through the filed data of special inquiry and just can check.So far, the whole circulation of project is accomplished.
Third part: with the project is the circulation object, is the circulation method with the sequence number, as the circulation carrier, describes the workflow circulation method based on sequence number with tables of data.This need realize by tables of data, has showed needed several tables of data and corresponding field.
1. flow process circulation data table related
The flow process circulation consists predominantly of two parts table in implementation procedure: allocation list and tables of data.
Allocation list is accomplished the configuration of flow process, link, and flow process and link are together in series;
Corresponding its flow data that comprises of tables of data, this mainly is meant the business datum relevant with this flow process, with the data required with respect to flow engine be not a lot, the redirect data when comprising this flow process redirect in addition.
5 tables have comprised needed list structure in the flow process circulation basically.Wherein t_prj_configure, t_prj_map_flow, 3 tables of t_task_configure are used for based on the flow process of sequence number circulation configuration, increase the t_pfj_nextflow allocation list during based on next step flow process circulation; T_prj_common, t_task_table are used for the tables of data of flow process circulation.Below specify:
2. the core field of using when flow process circulates
(1) t_prj_configure table: flow config table is mainly used in the configuration of flow process and satellite information.The required field that is used to circulate has
SubProjectTypeID: process identification ID, program is inner to be used
SubProjectTypeName: process name is used to appear use
(2) t_task_configure table: the link allocation list is mainly used in the operation of configuration link.The required field that is used to circulate has:
TaskTypeId: the inner use of link sign ID program
TaskTypeName: the link title is used to appear use
(3) t_prj_map_flow table: the procedure links correspondence table, be used for related flow process and link and use, through the corresponding relation of this table, accomplished the corresponding relation of 1-N between flow process, the link.The required field that is used to circulate has:
Sequence: corresponding sign ID, this field is important in the flow process circulation based on next step
SubProjectTypeID: flow process ID
FlowTypeId: link ID
ExecuteOrder: carry out sequence number, this sequence number is the foundation based on the sequence number redirect.Based on only using it to obtain first link in next step redirect, follow-up link is by obtaining among the t_prj_nextflow.
In t_task_configure and t_prj_map_flow table, all can the information of link be configured, but the effect that they reach is different.As the completion time limit of disposing this link: if this field is added among the t_task_configure, so as long as configuration once when the configuration link; And if be added in the t_prj_map_flow table, when adding a certain link for flow process so, must be set the completion time limit of its link.In t_task_configure, more save trouble comparatively speaking, and freer in t_prj_map_flow.
(4) t_prj_nextflow table: flow process circulation table is mainly used in the flow process circulation based on next step.Can accomplish very complicated flow process circulation function through this table.The main field of this table does
FlowSequence: as the Sequence of prosomite
FNSequence: the Swquence of next link
The Sequence of these two fields all corresponds to Sequence field in the t_prj_map_flow table.Through Sequence, can get access to all relevant information of link.Because two fields are the relation of N-N, be reflected in the link simultaneously, just this link also is the relation of multi-to-multi to next link, so can form complicated flow process circulation relation.
(5) t_prj_common table: repertory is used for the public part of project.
This table is main accomplishes two functions: be used for the flow process needed information that circulates, so just can professional relation with flow process is separated, and improved the dirigibility and the stability of flow process on the one hand, can follow on the other hand and be absorbed in the problem that business is correlated with.The needed public information of project.This public information belongs to the essential information of project, and use is more extensive, so just can unify the partial function operation.Reduce the exploitation amount, accelerate development efficiency.And the own information of project can generate a tables of data in addition, and is related therewith through unique ID, so just accomplished the incidence relation between business and the flow process.
The main field that this surface low journey is relevant has:
ProjectID: unique Id of project, each intermediate item also is through related its business datum of this field
SubProjectTypeID: flow process ID just associates the 1-N of flow process and project through this ID
ProjectName: project name is used to appear use
CurrentState: the current state of project.Rough draft, enforcement, filing etc.This state is judged in the flow process circulation, is in the rough draft state and can starts flow process; Be in the enforcement state flow process that then can circulate; In case got into the filing state, then no longer allowed the flow process circulation.
(6) t_task_table table: task list is used to preserve the operation that flow process circulates.What is called is passed by and promptly can be left a trace, and this vestige just is kept in this table.The field of this table is a lot, but the main field relevant with flow process and few:
TaskID: unique ID of current task
TaskTypeID: link ID
AffiliatedProjectID: item id
CurrentState: current task state
LastTaskID: the ID of a last task promptly can embody the precedence relationship of this project through this ID.
3, the logical relation between the tables of data
See accompanying drawing 2.The process of flow process circulation is complicated like very, but real logical relation is also very simple, the logical relation of having delineated out 5 tables that last figure is the most basic.Through this figure, can reach a conclusion, on any node, can get access to the details of all flow processs, link, project, task dispatching easily.
4, the flow process based on sequence number circulates
From disposing a complete flow process, to the process of carrying out real flow process circulation, step wherein is still more numerous and diverse, comes to realize step by step above process with the concrete operations to tables of data.
4.1 flow process configuration
(1) configuration flow: this process promptly is the operation to the t_prj_configure table.This process is relatively independent, and this process generates a process recording after accomplishing, and comprises unique flow process Id and process name.
(2) configuration link: this process is to the t_task_configure table handling.This process generates a link record after accomplishing, and comprises unique link Id and link title.
(3) add link: this process is to the t_prj_map_flow table handling.Accomplish the operation associated of flow process and link, a flow process can add a plurality of links, so also must confirm link sequencing on stream, this order is confirmed by the ExecuteOrder value.If be parallel link, then their ExecuteOrder value is identical.Must be set to 100,200 etc. whole 100 order in the native system, this is main relevant with realization.
Top process has just realized a configuration operation of accomplishing flow process, can get into operational phase.
4.2 project circulation
(1) establishment project: project information is general to be kept in two tables to I haven't seen you for ages, and the information relevant with business all is kept in the other table, related with the t_prj_common table through its ProjectID, and has preserved the common information of project in the t_prj_common table.If it is relevant only to pay close attention to its flow process, so only need to pay close attention to several fields seldom.
On based on a certain flow process, create a project, generated an item record, comprised unique ProjectId, pointed to the SubProjectTypeID of flow process, and currentitem purpose state one " rough draft " state.Under " rough draft " state, still allow it to revise project information.
(2) startup project:, promptly can begin to start the flow process circulation in the establishment project and after confirming.Just can arrive through the SubProjectTypeId field among the t_prj_common and to obtain the link relevant information among the t_prj_map_flow, obtain ExecuteOrder and be 100 link ID, first link of redirect during as project initiation.In t_task_table, add a record, import unique TaskId, item id, link ID etc., and the project current state is revised as " enforcement " state, and current task is set to " not accepting " state.
(3) accept task: the process of accepting is for database manipulation, and is very simple, only revises its state and is " accepting ".Certainly how to confirm whom this task accepted by, can be referring to " handler of flow process " chapters and sections.
(4) Recovery Process: this process is only upgraded operation to the answer field among the t_task_table.
(5) submission process: can carry out follow-up link during submission and judge; Through existing P rojectId, SubProjectTypeId, three signs of TaskTypeID; From the t_prj_map_flow table, get access to current ExecuteOrder value; And obtain the link Id of next ExecuteOrder value, have two kinds of situation here:
When also having follow-up link, next step link Id according to getting access to generates new t_task_table record, imports unique TaskId, project Id, link Id, a last link Id etc.To work as prosomite and be changed to and reply, next link is changed to " not accepting " state, and circulation gets into 6 process.
When not having follow-up link, get into archive operation, establish the current task state and be " replying ", establishing current project status is " filing " state, this project circulation finishes.
Only need revise configuration file when present embodiment is disposed, can on a PC, move, also can operation simultaneously on multiple pc.This system has obtained concrete checking in development & construction.Utilize this system to realize that construction, optimization, drive test, dilatation, complaint, guarantee, cutover, transmission, broadband services in the work of 3G O&M open or the like flow process.Through actual motion and test in the development & construction process, well embodied implementation result based on sequence number circulation method, verified the accuracy of the method.
Above-mentioned instance only is explanation technical conceive of the present invention and characteristics, and its purpose is to let the people who is familiar with this technology can understand content of the present invention and enforcement according to this, can not limit protection scope of the present invention with this.All equivalent transformations that spirit is done according to the present invention or modification all should be encompassed within protection scope of the present invention.

Claims (6)

1. 3G mobile communication O&M flow process circulation method based on sequence number is characterized in that said method comprising the steps of:
(1) be that project created in unique key word with item id; Add-ins program recording in repertory; The task list of initialization respective item; And in flow config table, link allocation list, procedure links correspondence table, flow process circulation table the mission bit stream in configuration project information and the project flow process, and the sequencing in project of setting the tasks is initialized as " rough draft " state with the state of project;
(2) startup project is carried out the flow process circulation according to the task sequencing in the flow process circulation table, in task list, adds task record, and the project current state is revised as " enforcement " state, and current task is set to " not accepting " state;
(3) real-time status according to current task is " accepting " state with current task status modifier in the current task record of task list, the process of accepting of finishing the work;
(4) according to the real-time status of current task renewal replied in the current task record of task list; Submit with item id, link ID and three identifiers of flow process type I D then; From the procedure links correspondence table, obtain the next link of carrying out; In task list, produce new task record, circulate successively and all accomplish until all tasks, project finishes.
2. method according to claim 1 is characterized in that flow config table comprises flow process ID and process name field in the said method; Said link allocation list comprises link ID and link title; Repertory comprises item id, flow process ID, project name and project current state field; Said task list comprises task ID, the link ID corresponding with task, affiliated item id, task current state, a last task ID field; Said procedure links correspondence table comprises corresponding relation sign ID, flow process ID, link ID and carries out sequence number field; Said flow process circulation table comprises the corresponding relation sign ID when the corresponding relation sign ID of prosomite, next link.
3. method according to claim 2 is characterized in that said method item table and task list as public information, and repertory is established the project data table outward in addition, carries out association through item id.
4. method according to claim 2 is characterized in that carrying out in the procedure links correspondence table described in the said method sequence number field and confirms link sequencing on stream; When walking abreast link, the value of carrying out sequence number field is identical.
5. method according to claim 2; After it is characterized in that the link ID that carries out according to the next one in the said method step (4) produces new task record in task list; When the prosomite status modifier is " replying " state, next link status modifier is " not accepting " state.
6. method according to claim 2, when it is characterized in that all tasks are all accomplished in all sub-projects in the said method step (4), current project status modifier is " filing " state, project finishes.
CN2012100341897A 2012-02-15 2012-02-15 Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number Pending CN102609818A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100341897A CN102609818A (en) 2012-02-15 2012-02-15 Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100341897A CN102609818A (en) 2012-02-15 2012-02-15 Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number

Publications (1)

Publication Number Publication Date
CN102609818A true CN102609818A (en) 2012-07-25

Family

ID=46527170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100341897A Pending CN102609818A (en) 2012-02-15 2012-02-15 Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number

Country Status (1)

Country Link
CN (1) CN102609818A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110795429A (en) * 2019-10-14 2020-02-14 紫光云(南京)数字技术有限公司 Method for recording data in circulation by using identification
CN111507636A (en) * 2020-04-22 2020-08-07 时时同云科技(成都)有限责任公司 Business process running state analysis method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5893128A (en) * 1993-03-01 1999-04-06 Nauckhoff; Sven Distributed work flow management
CN1788279A (en) * 2003-08-26 2006-06-14 网飞亚技术公司 Scheduling method of advertisement/broadcasting and management system and method
CN101650804A (en) * 2009-08-27 2010-02-17 苏州锐创通信有限责任公司 Method for managing process of third generation mobile communication operating and maintaining system
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5893128A (en) * 1993-03-01 1999-04-06 Nauckhoff; Sven Distributed work flow management
CN1788279A (en) * 2003-08-26 2006-06-14 网飞亚技术公司 Scheduling method of advertisement/broadcasting and management system and method
CN101650804A (en) * 2009-08-27 2010-02-17 苏州锐创通信有限责任公司 Method for managing process of third generation mobile communication operating and maintaining system
CN101706896A (en) * 2009-11-24 2010-05-12 苏州锐创通信有限责任公司 Workflow management method facing mobile communication of third generation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110795429A (en) * 2019-10-14 2020-02-14 紫光云(南京)数字技术有限公司 Method for recording data in circulation by using identification
CN111507636A (en) * 2020-04-22 2020-08-07 时时同云科技(成都)有限责任公司 Business process running state analysis method and system

Similar Documents

Publication Publication Date Title
CN110288307B (en) Intelligent contract collaborative development system and data processing method based on Fabric Block chain
CN110310088B (en) Workflow configuration method and related products
CN107193545B (en) Component-oriented multi-language collaborative development device, method and system
CN105549982B (en) A kind of development of automation platform based on model configuration
CN107507005A (en) Data access method and system outside a kind of chain based on alliance's chain
CN103425778B (en) A kind of intelligent development platform of database application system
CN101882255A (en) Workflow device, system and configuration method based on service-oriented architecture
CN101552842B (en) Call center application data and interoperation architecture for a telecommunication service center
Brockmann et al. Complexity of megaprojects
CN104850405A (en) Intelligent configurable workflow engine and implementation method therefor
CN104216912A (en) Method and device for achieving non-intrusive service form workflow
CN101650804A (en) Method for managing process of third generation mobile communication operating and maintaining system
CN108537503A (en) software development management system
US20070061304A1 (en) Middleware and a method for implementing business logic using it
WO2018094971A1 (en) Coordination device for use in r&d process for complex electromechanical product and coordination method thereof
CN108280150A (en) A kind of distribution asynchronous service distribution method and system
CA2772824C (en) Role mapping and training tool
CN109636323A (en) Synergetic office work plateform system
CN109615554B (en) Synchronous data system based on intelligent manufacturing and operation method and synchronization method thereof
CN102609818A (en) Circulating method of 3rd Generation (3G) mobile communication operating and maintaining flows based on sequence number
CN102646119B (en) Method for realizing integration of standardized system and information system
CN115951970A (en) Heterogeneous multi-simulation software integrated development environment
CN109146414A (en) A kind of project management system
CN109284935A (en) A kind of task processing system based on micro- assistance the superior and the subordinate office group
KR100712685B1 (en) Construction process information management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120725